Calliope ENEA Casaccia MON = monitor MWPC (CH1) T1 = test MWPC (CH3) T2 = test MWPC (BTF,CERN1,CERN2) T = temperature sensor P = atmospheric.

Slides:



Advertisements
Similar presentations
GEM Chambers at BNL The detector from CERN, can be configured with up to 4 GEMs The detector for pad readout and drift studies, 2 GEM maximum.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Presented by Shereen Aly Helwan University Group (experimental and data analysis) Dr. Ayman Mahrous Dr.Ahmed Ali Resistive Plate Chamber Activity At Helwan.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
Prototype TPC Tests C. Lu 12/9/98 V = 0. Gas gain test for the low pressure chamber The chamber is constructed with the following parameters: D anode.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
RPC GAS SYSTEM Commercial grade Gas :Do in-situ purification Regeneration must :Get back ~90% Fixed pressure control room: pressure at all points in room.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Plans for the Muon Gas and Cooling Systems LHCb infrastructure workshop February Burkhard Schmidt, with important input from Roberto Guida and Beatrice.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano 2, P. de Simone 1, F.Murtas 1, D.Pinci 3, M. Poli-Lener 1, D. Raspino 2 and B.Saitta.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
Aging test of MWPC at Casaccia The Calliope gamma ENEA Casaccia Setup of the test: Description of chamber prototypes Gas system Temperature.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
13 Oct 2006Ageing Meeting Geneva, Niels & Gras1/15 NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry,
TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.
19 Oct NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Optimization of the operation of Muon systems at LHC: a closed- loop gas system for RPCs and a CF 4 -recuperation unit for the CSC of CMS Conseil Européen.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
VCI 2004Gaia Lanfranchi-LNF/INFN1 Time resolution performances and aging properties of the MWPC and RPC for the LHCb muon system Gaia Lanfranchi – INFN/LNF.
9 Jan Ageing History 2005 Niels, Gras, Eduard & Sebastian 18 January 2006 TestModWireDateSourceCurrent/st raw DurationTests 90 Sr Scans I002A24L20-31.
Optimization of the Resistive Plate Chamber operation with a closed loop gas system at the Large Hadron Collider experiments M. Capeans, I. Glushkov, R.
September 9, 2003A. Cardini / INFN Cagliari1 M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini 2, C. Deplano 2, P. de Simone 1, F. Murtas 1, D.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Andrea Di Simone Andrea Di Simone – INFN Roma2 Andrea Di Simone CERN PH/ATC and INFN-CNAF On behalf of ATLAS RPC groups: Lecce, Napoli, Protvino, Roma2.
The LNF test setup Status as of Geometry of LNF setup Top and bottom trigger counters 4 KLOE-type tracking chambers One BESIII-(COMPASS-)type.
12/12/09 MPGD 神戸大学 1 Yusuke Komatsu A B. Azmoun B, C. Woody B, K. Ozawa A University of Tokyo A,Brook Haven National Lab. B.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
PNPI R&D on based detector for MUCH central part (supported by INTAS ) E. Chernyshova, V.Evseev, V. Ivanov, A. Khanzadeev, B. Komkov, L.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
22 Aug Ageing studies: the Miracle HV training.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Triple GEM Beam Test within PHENIX DC Upgrades Meeting 4/14/04 B. Azmoun PHENIX Brookhaven National Lab.
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
Avogadro’s Hypothesis. If two containers are filled with the same number of gas molecules at the same temperature and pressure, then the two containers.
Engineering: MWPC design configuration schemas. Wire Pad Chamber (WPC), one gap Avalanche Cdet in parallel to current source (not shown) will reduce current.
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
IEEE Symposium 2003, Portland
Long irradiation at the side
Results from a preliminary analysis of the MWPC test at the GIF
Introduction of NMIJ Gas Flow Standards Section
Report on radiation test done in Casaccia on January 11, 2006
Pre-installation Tests of the LHCb Muon Chambers
Resistive Plate Chambers performance with Cosmic Rays
Test of the cleaning gas mixtures.
Presentation transcript:

Calliope ENEA Casaccia MON = monitor MWPC (CH1) T1 = test MWPC (CH3) T2 = test MWPC (BTF,CERN1,CERN2) T = temperature sensor P = atmospheric pressure sensor gas mixture: Ar / CO2 /CF4 = 40 / 40 / 20 gas flow ~ 6 l/hr = 100 cc/min (1 volume in 20 min) Source Co60 (~25,000 curie) MON T2 GEM PC Co60 BOTTLES HV CONTROL ROOM 4.5 m P T window T1 GAS RACK

CERN chambers CERN1: in Closed loop Active area ~ 875 cm 2 (B 1.5 mm pitch, others 2 mm) B=reference (every day ON 2-3 hrs) Total Wire length ~ 4300 cm I ~ 990  A/gap HV(A, C, D) ~ 2.65 kV HV(B) ~ 3 kV CERN2: in Open Mode Active area ~ 480 cm 2 (all gaps 1.5 mm pitch) C=reference (every day ON 2-3 hrs) Total Wire length ~ 3200 cm I ~ 670  A/gap HV(A) ~ 3.14 kV HV(B) ~ kV HV(C) ~ kV HV(D) ~ kV Gaps C,D are asymmetric (wire is at 3.65 and 1.35 mm from cathode)

MWPC-LNF chambers CH1 = MONITOR CHAMBER (1.5 mm pitch) active area 500 cm 2 Total Wire length ~ 3330 cm I ~ 20  A/gap Gaps A,B in OPEN Mode; Gaps C,D in Closed Loop. CH3 = TEST CHAMBER 1 (1.5 mm pitch) active area 500 cm 2 HV=3.2 kV (reference A ON for ~5 hrs every 2-3 days) Total Wire length ~ 3330 cm I ~ 160  A/gap Gaps A, B, C, D in Closed Loop. BTF = TEST CHAMBER 2 (2 mm pitch) active area 1200 cm 2 HV=2.75 kV (reference D ON for ~5 hrs every 2-3 days) Total Wire length ~ 6030 cm I ~  A/gap Gaps A, B, C, D in OPEN Mode.

Layout of chamber positions and gas MWPC-CH3MWPC-BTF GEM-LNF-TEST1 GEM-LNF-TEST2 GEM-CA-TEST1 GEM-LNF-MONIT MWPC-CH1 P1P Gy/hr P Gy/hr P Gy/hr GEM-CA-TEST2 MWPC-CERN1 MWPC-CERN2 3 m rack Closed loopOpen modeGEM (open mode) AB CD position

Atmospheric pressure vs. Time

Temperature of source room vs. Time

Gas system One bottle for each gas (Ar, CO2,CF4) Gas from bottle to Mass flowmeter (connected to MKS) Total gas flow: 40/40/20 cc/min = 6 l/hr to mixer (little cylinder) Typical flows: Open Mode ~ 5-6 l/hr Closed loop: fresh gas ~ 1.35 l/hr circulating gas ~ 6.5 l/hr Fresh gas should be 10% of circulating gas, but below the 20% (i.e l/hr) the system is unstable. First purifier used from 16/6 to 3/7 (~ 17 days). May be too long ? Third purifier (asked 24 th june) arrived only on July 9 th !!!!!! Content of O2 was measured and did not change, but water content is unknown. The oil in the Open Mode bubbler is dark brown, while it’s clean for the Closed loop (this is not sufficient to state that purifier is working properly).

Saturation of gas gain HV% Sat.HV% Sat.HV% Sat. A B C D CH3CH3 w/o Resis.BTF Saturation < 10 %

Currents in BTF gaps (open mode)

Currents in BTF reference gap D

Ratio of currents BTF(A,B,C)/D

Currents in CH1 gaps A,B (open mode)

Ratios of currents BTF(A,B,C)/CH1(A+B)

Currents in CH3 gaps (closed loop)

Currents in CH3 reference gap A

Currents in CH1 gaps C,D (closed loop)

Ratios of currents CH3(B,C,D)/CH1(C)

Ratios of currents CH3(B,C,D)/CH3(A)

Integrated charges Same as above, but for 2 mm pitch.

Dark currents (first measurement: 16-jun) ONOFFONOFFONOFF A B C D CH1CH3BTF CH1 (C,D) 3.15  3.05 kV CH3 (B) 3.2  3.15 kV The power supply does not allow to measure currents < 1 uA

Dark currents (second measurement: 26-jun) SY2527N471A (nA) SY2527N471A (nA) SY2527N471A (nA) B kV CH1CH3BTF To read currents with N471A we need to switch OFF/ON all gaps CH1 (D) draws current also after switch off All BTF’s decreasing (for ex. BTF(D) 90  28 nA in ~ 1 hr)

Integrated charge in CH3

Integrated charge in BTF

Currents in CERN1 (closed loop)

Currents in CERN 2 (open mode)

CERN 1 ratios

CERN 2 ratios

I_ref (closed) / I_ref(open)

Integrated charges in CERN 1

Integrated charges in CERN 2

Conclusions MWPC-LNF Integrated charges: BTF (2 mm) mC/cm (> M1R3) CH3 (1.5 mm) mC/cm (>M2R3) No aging in Open Mode chamber (within ~5%) Analysis of Closed loop chamber requires more work MWPC-CERN Integrated charges: CERN 1 (2 mm) ~340 mC/cm (> M1R3) CERN 2 (1.5 mm) mC/cm (>>M2R3) No aging in both chambers (within ~8%) Several problems with gas mixture: low CO2 content for ~ 10 days ?) Lower currents in all chambers after change of CO2 bottle Undefined purity of mixture and H2O content  More time for an accurate data analysis, especially for closed loop

Spare transparencies follow

Source pool window irradiated panels

TEST CHAMBER 2

MONITOR CHAMBER MON TEST GEM PC Co60 BOTTLES HV CONTROL ROOM 4.5 m

MWPC prototypes Test chamber 1 and monitor chamber : chambers are 4-gaps with active area ~ 251 x 208 mm 2 wire pitch 1.5 mm (8 pads x 17 wires) Operating voltage = 3200 V Typical currents: test ~ 160  A/gap monitor ~ 20  A/gap

Dose rates (still to be measured) CH1 dose rate < Gray/hr CH3 dose rate ~ 0.1 – 0.2 Gray/hr (~0.3  A/cm 2 ) BTF, CERN1, CERN 2 dose rate ~ 0.3 – 0.6 Gray/hr (~1  A/cm 2 )