Summary of Main Linac SCRF-part H. Hayano, 11202008 ILC08 at UIC.

Slides:



Advertisements
Similar presentations
New Optical Inspection Results at JLab An in-depth update since Chicago meeting ILC08 (Highlights reported in US Regional Talk by Mark Champion) Rong-Li.
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
Superconducting rf test facility STF Mechanical grinding development Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Recent Surface Studies in KEK-STF
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
ILC S0 Strategy Proposal FNAL GDE status 報告会 4月28日: (空胴表面プロセス、空胴システム)
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
TILC09 AAP Review Lutz Lilje Global Design Effort 1 Cavity Gradient R&D.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Update on S0, S1 for ILC R&D H. Padamsee, Cornell For the S0/S1 Task Force.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
ILC Global Design Effort 1 ILC S0 Strategy Proposal FNAL
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
9-cell cavity coordination CM Ginsburg 15 Mar
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Possible Relationship Between Defect Pre-Heating and Defect Size H. Padamsee Cornell S0 Meeting, Jan 26, 2009.
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
Status and plans for the 3.9 GHz section of XFEL
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
Cavity Gradient R&D Status and Future Plans for TDP-2
Meeting for S1-Global module design Cryomodule and Cryogenics
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S0 Status report from KEK
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Recent VT Results in the STF-2 cavities
2. SCRF General Preparation for the AD&I Preparation for AAP Review
WG3: Main Linac SCRF(cavity,cryomodule)
Presentation transcript:

Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC

Nov.17 (Mon) 8: :00 UIC Forum Main Hall C cavity (S0) 8:30-8:55H. Padamsee Summary of TTC(Dehli) cavity discussion 8:55-9:15R. GengNew 9 cell results at Jlab 9:15-9:30H. HayanoSTF-EP,VT commissioning using AES001 9:30-9:45webexR. Geng, L. Lilje Status of alternative cavities 9:45-10:00pos-doc (R. Geng) Optical inspection update and material study at Jlab 10: :00 UIC Forum Main Hall C cavity (S0) 10:30-10:45webexS. Aderhold Optical Inspection update (Z130) at DESY 10:45-11:00K. Watanabe Optical Inspection update at KEK 11:00-11:15T. SaekiSurface studies at KEK 11:15-11:30K. Watanabe Mechanical grinding development 11:30-12:00webexL. Liljediscussion of Table for optical inspection & T-map Nov.17 (Mon) 13: :30 UIC Forum Main Hall C S0, S1/S2 13:30-13:45Lance Cooley Summary of SRF Materials Workshop 13:45-14:05T. ArkanSummary of TTC(Dehli) module test discussion 14:05-14:25S. NoguchiCavity package studies at STF 14:25-14:45N. OhuchiS1-Global status 14:45-15:00H. HayanoDetail plan of S1-global installation and operation 15:00-15:15H. HayanoS1-Global discussion 15:15-15:30Mike KellyStatus and plans for the cavity processing facility at Argonne 16: :00 UIC Forum Main Hall C plug compatibility (general) 16:00-16:15H. HayanoSpecification profile table 16:15-16:30A. Yamamoto Plug compatibity document 16:30-18:00A. Yamamoto Pluc-compatibility general discussion

Nov.18 (Tue) 8: :00 UIC Forum Meeting Room I tuner (plug compatibility) 8:30-8:45S. Noguchi Plan of KEK tuner for STF phase 2 8:45-9:00C. Paganiperformance of blade tuner 9:00-9:15D. MitchelPlan of FNAL tuner 9:15-10:00A. Yamamot o tuner discussion 10: :00 UIC Forum Meeting Room I coupler (plug compatibility) 10:30-11:00tuner discussion 11:00-11:30A. Yamamot o coupler discussion 11:30-12:00coupler discussion Nov.18 (Tue) 13: :30 UIC Forum Meeting Room I cryomodule/cryo genics 13:30-13:45C. PaganiStatic and dynamic heat loads of Type III+ cryomodule 13:45-14:10T. Peterson Recent ILC heat load estimates, CM1 instrumentation 14:10-14:25N. OhuchiHeat load study of cryomodule in STF 14:25-14:40N. Ohuchi5K shield removal experiment at KEK 14:40-15:30T. Peterson, N. Ohuchi heat load discussion 16: :00 UIC Forum Meeting Room I cryomodule/cryo genics 16:00-16:30D. Arenius 12 GeV upgrade cryogenics for Jlab 16:30-16:50T. Peterson, N. Ohuchi ILC cryosystem discussion 16:50-17:10webexH. NakaiMaterial property study for high pressure code in KEK 17:10-17:30Tom NicolHigh pressure code for dressed niobium cavities in FNAL 17:30-18:00T. Peterson, N. Ohuchi Discussion for the cavity vessels

Combined Yield of Jlab and DESY Tests Reported at TTC Delhi Meeting (October 2008) For One Vendor 23 tests, 11 cavities 50% yield Improvement of yield is due to field emission reduction by ethanol rinse (DESY), ultrasonic degreasing (JLab). Gradient summary from TTC (H. Padamsee)

Multiple Vendor Yield 48 Tests, 19 cavities, including ACCEL, AES, Zanon, Ichiro, JlabClearly there are many more variables to bring under control when dealing with many vendors. 50% Gradient summary from TTC (H. Padamsee)

Important Progress since Last TTC Meeting. Sources for quench below 25 MV/m have been identified Thermometry first used to locate quench regions Followed by optical inspection. Quench sites are predominantly bumps and pits on the equator e-beam weld Or in the heat affected zone of that weld. Many pictures available A13 Cell #5 FE28, pit inside equator EBW HAZ  m dia. JLab DESY Z130 Cell #5 18deg, pit at equator EBW ~500  m dia. Picture example reported in this meeting are below; quench at 18-22MV/m Gradient summary from TTC (H. Padamsee)

Number of cavities inspected –21 nine-cells –4 single-cells –3 other T-map and optical inspection available on –13 Cavities Other Cavities have –incoming inspection only –no t-mapping yet Correlation T-map – Optical inspection –7 Yes Various types of defects have been found –3 Field emission Scratches found in other locations –3 No direct match Still surface defects have been found Partially additional surface treatment after last t-map Preliminary Summary Discussion of Optical Inspection and Temperature mapping Results Match of Optical inspection & T-map (L. Lilje) 54% are match

Temperature Map & Q vs E General heating due to high field Q-slope Defect heating at pit at field BELOW quench Cavity prepared by EP and flash BCP (no bake) Standard High Field Q-Slope Quench field H peak = 120 mT, E acc = 27 MV/m Gradient summary from TTC (H. Padamsee)

500 um Q-slope heating Defect (pit) heating Defect Heating Surpasses Q-slope Heating Above 800 Gauss SEM back-scattered image Individual thermometer responses Possible region of high field enhancement and quench may be only 10  m Gradient summary from TTC (H. Padamsee)

Jlab E-beam melting to repair pits Try this on a single cell ? Gradient summary from TTC (H. Padamsee)

KEK Grinding machine Grinder Head with Diamond compound seat before after Grinding machine was delivered in last week. Diamond compound seat #400 (size = 40 ~ 60 um) as for 1 st test EBW bumps sample plate (Nb) KEK (K. Watanabe)

Cryomodule summary from TTC (T. Arkan) XFEL Cryomodule R&D; cavity preparation test for min. cost, min step. module transport test. tunnel mock-up. HPV code test for Module 3* CEA Saclay plan for module assembly (Thales) FNAL CM1 assembly and installation. Cryomodule (TTC meeting)

S1 Results TTC Highlights Gradient summary from TTC (H. Padamsee) out-sourced module assembly (two groups), cavity venting is suspicious.

KEK 4-cavity module test Ave. Eacc,max (V.T) = 22.7 MV/m Ave. Eacc,max (Cryo.) = 23.2 MV/m November, 2008 STF results (S. Noguchi) reached to 32MV/m operation in this week.

S1-Global Cryomodule design Module C: 2 FNAL cavities and 2 DESY cavities, Module A: 4 KEK Tesla-like cavities The total length=14978mm – Module-C = 6000 mm, Module-A = 5515 mm FNALDESY FNALDESYKEK End CapConnection to 2K Cold Box Module CModule A KEK-new S1G plan (N. Ohuchi)

S1G agreement document (A. Yamamoto) To understand what is S1-Global; description of contribution detail, experiment detail, time-lines,… are made to:

Plug compatibility document (A. Yamamoto) description of concept, interfaces, specification profiles,… Interface points were agreed. Specification tables were fixed so far, to be included in the document.

Cavity-Jackets of three groups DESY-XFEL FNAL-present KEK-new Cavity Package Interfaces at S1-Global

FNAL-present FNAL-proposed Discussion was made for; Tuner performance ( backlash, stroke, etc ): by C. Pagani, S. Noguchi, D. Mitchel vessel support position, vessel bellows position, and plug-compatibility of cavity package. performance calculation and test is required for the design change both for FNAL tuner, KEK tuner. tuner & vessel bellowssupport tabs

Cross section without 5K shield (1) RDR heat load was updated for coupler numbers and support numbers (T. Peterson). (2) 5K shield removal test at STF (N. Ohuchi) (3) JLab upgrade (D. Arenius), HPV code (T. Nicol), material test (H. Nakai), were reported. Discussion will continue by weekly meeting. Heat load and HPV code

Summary of major discussion (1)Gradient limitation by Pits and Bumps more data points (inspection picture & T-map) good correlation between T-map & optical inspection. development of repair tools. (2) Plug compatibilities discussion on tuner, vessel support position and input coupler port diameter.