TVAAS Tennessee Value-Added Assessment System

Slides:



Advertisements
Similar presentations
Understanding the North Carolina School Report Card.
Advertisements

PVAAS (The Pennsylvania Value Added Assessment System )
Presented to the State Board of Education August 22, 2012 Jonathan Wiens, PhD Office of Assessment and Information Services Oregon Department of Education.
No Child Left Behind Act January 2002 Revision of Elementary and Secondary Education Act (ESEA) Education is a state and local responsibility Insure.
VALUE – ADDED 101 Ken Bernacki and Denise Brewster.
Haywood County Schools February 20,2013
Copyright © 2013, SAS Institute Inc. All rights reserved. NEW TEACHER REPORTS OCTOBER TRAINING 2013.
2013 Accountability Report Jurupa Unified School District Board of Education Meeting.
1 Prepared by: Research Services and Student Assessment & School Performance School Accountability in Florida: Grading Schools and Measuring Adequate Yearly.
Data for Student Success Comprehensive Needs Assessment Report “It is about focusing on building a culture of quality data through professional development.
Using EVAAS to Improve Student Performance Heather Stewart Jody Cleven Region 4 PD Leads NCDPI.
Enquiring mines wanna no.... Who is it? Coleman Report “[S]chools bring little influence to bear upon a child’s achievement that is independent of.
Performance Diagnostic Report PVAAS Overview 2013 Blue Bar – Current Year Missing Bar – Insufficient Number of Students Whisker – Margin of Error on Growth.
Title III Accountability. Annual Measurable Achievement Objectives How well are English Learners achieving academically? How well are English Learners.
Michigan’s Accountability Scorecards A Brief Introduction.
Arizona’s Federal Accountability System 2011 David McNeil Director of Assessment, Accountability and Research.
Department of Research and Evaluation Santa Ana Unified School District 2011 CST API and AYP Elementary Presentation Version: Elementary.
A Parent’s Guide to Understanding the State Accountability Workbook.
DLT September 28, State Indicators and Rating for OFCS (have) Key Factors and Points to Keep in Mind (have) This power point presentation (will.
1 Paul Tuss, Ph.D., Program Manager Sacramento Co. Office of Education August 17, 2009 California’s Integrated Accountability System.
Copyright ©2006. Battelle for Kids. Understanding & Using Value-Added Analysis.
Florida’s Implementation of NCLB John L. Winn Deputy Commissioner Florida Department of Education.
What is Alaska STEPP Alaska STEPP, which stands for Steps Toward Educational Progress and Partnership, is an online, school improvement planning tool based.
Supporting Students with IEPs: They CAN and ARE Making Progress! January 2013 Jennifer Ross, PVAAS Statewide Team for PDE Bonnie Dyer, AIU3 Curriculum.
A Closer Look at Adequate Yearly Progress (AYP) Michigan Department of Education Office of Educational Assessment and Accountability Paul Bielawski Conference.
EQ: HOW ARE WE HELD ACCOUNTABLE AS EDUCATORS? N O CHILD L EFT B EHIND {NCLB}
Daniel H. Holloway Senior at Old Dominion University Coordinator of Database Services Gloucester County Public Schools.
1 Watertown Public Schools Assessment Reports 2010 Ann Koufman-Frederick and Administrative Council School Committee Meetings Oct, Nov, Dec, 2010 Part.
Ohio’s New Accountability System Ohio’s Response to No Child Left Behind (NCLB) a.k.a. Elementary & Secondary Education Act a.k.a. ESEA January 8, 2002.
Annual Student Performance Report October Overview NCLB requirements related to AYP 2012 ISAT performance and AYP status Next steps.
1 No Child Left Behind for Indian Groups 2004 Eva M. Kubinski Comprehensive Center – Region VI January 29, 2004 Home/School Coordinators’ Conference UW-Stout.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA Modified by Dr. Teresa Cortez September 10, 2007.
PROGRESS & & ACHIEVEMENT Pennsylvania Value-Added Assessment System (PVAAS) The Power of Derry Township School District School Board Presentation Sept.
MATRIX OF ACHIEVEMENT AND PROGRESS (MAAP) A New Interactive Data Tool for Ohio Districts.
PROGRESS & & ACHIEVEMENT Pennsylvania Value-Added Assessment System (PVAAS) The Power of School District School District.
Copyright © 2010, SAS Institute Inc. All rights reserved. How Do They Do That? EVAAS and the New Tests October 2013 SAS ® EVAAS ® for K-12.
Annual Student Performance Report September
Santa Ana Unified School District 2011 CST Enter School Name Version: Intermediate.
Making Sense of Adequate Yearly Progress. Adequate Yearly Progress Adequate Yearly Progress (AYP) is a required activity of the No Child Left Behind (NCLB)
CREP Center for Research in Educational Policy SES Student Achievement Methods/Results: Multiple Years and States Steven M. Ross Allison Potter The University.
DVAS Training Find out how Battelle for Kids can help Presentation Outcomes Learn rationale for value-added progress measures Receive conceptual.
EVAAS Proactive and Teacher Reports: Assessing Students’ Academic Needs and Using Teacher Reports to Improve Student Progress Cherokee County Schools February.
Growth Model: A Way to Adequate Yearly Progress (AYP) The Effective Use of Data to Make AYP AERA CCSSO April 13, 2007.
Copyright © 2010, SAS Institute Inc. All rights reserved. How Do They Do That? EVAAS and the New Tests October 2013 SAS ® EVAAS ® for K-12.
EVAAS and Expectations. Answers the question of how effective a schooling experience is for learners Produces reports that –Predict student success –Show.
2009 Report Card and TVAAS Update Recalibration 2009 October 26, 2009.
1 Getting Up to Speed on Value-Added - An Accountability Perspective Presentation by the Ohio Department of Education.
ADEQUATE YEARLY PROGRESS. Adequate Yearly Progress Adequate Yearly Progress (AYP), – Is part of the federal No Child Left Behind Act (NCLB) – makes schools.
On the horizon: State Accountability Systems U.S. Department of Education Office of Elementary and Secondary Education October 2002 Archived Information.
No Child Left Behind California’s Definition of Adequate Yearly Progress (AYP) July 2003.
School and District Accountability Reports Implementing No Child Left Behind (NCLB) The New York State Education Department March 2004.
AYP and Report Card. Big Picture Objectives – Understand the purpose and role of AYP in Oregon Assessments. – Understand the purpose and role of the Report.
C R E S S T / CU University of Colorado at Boulder National Center for Research on Evaluation, Standards, and Student Testing Measuring Adequate Yearly.
Presented by: Frank Ciloski, Sherry Hutchins, Barb Light, Val Masuga, Amy Metz, Michelle Ribant, Kevin Richard, Kristina Rider, and Helena Shepard.
Measuring Turnaround Success October 29 th, 2015 Jeanette P. Cornier, Ph.D.
Using EVAAS to Improve Student Performance Heather Stewart Jody Cleven Region 4 PD Leads NCDPI.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA Modified by Dr. Teresa Cortez September 1, 2008.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA May 2003 Modified by Dr. Teresa Cortez for Riverside Feeder Data Days February.
No Child Left Behind (Because where would we put them all?) (Because where would we put them all?)
Adequate Yearly Progress (AYP). What is Adequate Yearly Progress (AYP)? As a condition of receiving federal funds under No Child Left Behind (NCLB), all.
Michigan School Data (MI School Data). Agenda  Overview of MI School Data Portal  Navigation 101  Sample Reports  Training and TA  Q & A 2.
Using EVAAS to Make Data- Driven Decisions Clay County School April 20, 2012 Jan King Professional Development Consultant, NCDPI.
Accountability in California Before and After NCLB
A Brief History Data-Based School & District Improvement
SASEVAAS A Way of Measuring Schooling Influence
Metropolitan Nashville Public Schools
New EVAAS Teacher Value-Added Reports for
OCOEE MIDDLE SCHOOL Oms data overview Achievement & Growth
AYP and Report Card.
Meeting the challenge Every Classroom Every Student Every Day
Presentation transcript:

TVAAS Tennessee Value-Added Assessment System Office of Assessment, Evaluation, & Research

What is TVAAS? TVAAS stands for Tennessee Value-Added Assessment System. *Based on SAS’s Education Value-Added Assessment System (EVAAS) and the statistical methodology of Dr. William Sanders. TVAAS is a statistical method used to measure the influence of a district or school on the academic progress (growth) rates of individual students or groups of students from year-to-year.

What is TVAAS? Statistical methodology used in value-added analysis is very complicated. A student’s growth pattern is determined using all available previous existing assessment data for that student (all grades, all subjects). However, the concept behind it is very simple and straightforward… Use a student’s existing assessment data to produce measures of progress unique to that student.

What is TVAAS? The TVAAS method uses previous test score data to plot a “growth pattern” for students. Think of academic growth in terms of a child’s physical growth.

How did it all begin? First developed for Tennessee by Dr. William Sanders. 1992 – Tennessee Education Improvement Act Increased school funding using increased sales taxes Demand for increased accountability TVAAS set up

Since then… Since 1992, TVAAS has tracked each of Tennessee’s students… Grades 3-12… every subject… every grade… every teacher… That’s over 26 million records! Largest student assessment database ever assembled. SAS located in Cary, North Carolina, provides the statistical analysis of the data. SAS is the world’s largest privately held software company.

Why do we need TVAAS? Students begin school at different places and progress at different rates. Yet with AYP, all students are expected to achieve the same level of academic proficiency level. NCLB says that ALL students must reach proficiency in reading and math by 2014. AYP (Adequate Yearly Progress) is measured for: All students All major racial/ethnic groups Low-income students Limited English Proficient students Students with Disabilities

Why do we need TVAAS? Proficiency is measured by the performance of students at a single point in time and how well those students perform against a set of standards. Simply put, proficiency levels only indicate whether or not a student met a certain target. Growth is measured by how much gain or progress an individual student or group of students make over time. Growth measures do not assume all students start the school year at the same academic level.

Achievement AND Growth By measuring the academic achievement of students and the academic growth of students, schools and teachers will have a more comprehensive picture of the effectiveness in raising student proficiency.

TVAAS Website

TVAAS Public Site EMBARGOED INFORMATION: The 2010 value-added results reported at this site are presently not available to the media or to the public. The public release will come from the Tennessee Department of Education. Your restricted access will allow you to use the information reported in your decision making within your system or school. TVAAS Public Site can be accessed at https://tvaas.sas.com/evaas/public_welcome.jsp

Reports available on public site: TVAAS Public Site TVAAS Public Site can be accessed at https://tvaas.sas.com/evaas/public_welcome.jsp Reports available on public site: State Report School Search System Value Added Value Added Summary System Progress Report School Value Added

Understandings

TVAAS is…. Projected Score vs. Observed Score Projected Score – based on all of the student’s past state test scores plus student receiving an average Tennessee schooling. Observed Score – actual score on most recent test.

Restricted Site Log-In https://tvaas.sas.com/evaas/signin.jsf

The Navigation Bar Click on “Help” to access information about each page or to view/print the Resource Guide. Be sure to use Back and Print tabs on the website not on your browser.

The Navigation Bar Click on “Reports” Tab to see selection of different reports available.

AYP Dashboard

Accelerate I, II, and Advanced

District “Drilling Down” School Subgroup District Student “Drilling Down” District Value Added Summary Reports Diagnostic Summary Reports Performance Diagnostic Summary Reports School School Value Added Reports School Diagnostic Reports School Performance Diagnostic Reports Subgroup Custom Student Reports Student Pattern List Student Individual Student Reports Projections

Elementary/Middle School Value-Added Report

Elementary/Middle School Value-Added Report

Diagnostic Report

Selecting Subgroups in Diagnostic Report

Diagnostic Report

Student List Achievement

Individual Student Report

Performance Diagnostic Report

School Search

Custom Student Report

Custom Student Report

Custom Student Report (Saved) Click to Resort

Student Projections (Tab)

Student Pattern List Enables you to see how effective the school/teacher has been with the lowest, middle, and highest achieving students in the group you have selected. The minimum number of students you can graph is 15.

Student Pattern List Elementary/Middle

Student Pattern List

Third Grade Percentages

Or contact the office of Assessment, Evaluation, & Research Questions??? For additional information on TVAAS and value-added professional development opportunities, visit the TDOE website at http://www.state.tn.us/education/ Or contact the office of Assessment, Evaluation, & Research (615) 741-0720