12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

12GeV Project CD-4 Leigh Harwood Associate Project Manager Accelerator Systems.
12 GeV Parity-Violation Program Introductory Welcome Kees de Jager.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Muon Campus Controls Update Brian Drendel 8/6/13.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Thomas Jefferson National Accelerator Facility Status of the CLAS112 Project Page 1 Jefferson Lab 12 GeV Upgrade Status of the CLAS12 Project Latifa Elouadrhiri.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Closeout Report on the Review Committee (CD-1) for the Long Baseline Neutrino Experiment (LBNE) Project at Fermi National Accelerator Laboratory October.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
Office of Baseline Change Proposal (BCP) Approval or Brief Presented by: Draft version Jun 16, 2015.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Head, Office of Project Management Oversight (OPMO)
GlueX Collaboration Meeting
Jefferson Lab Overview
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
News and brief overview of Beamline plans for the next few months
Alignment of the 12 GeV CEBAF Accelerator
Experimental Facilities Planning
Francesco Forti University and INFN, Pisa
Preparations for a Lehman Review
Introduction to Jefferson Lab
ctclink Steering Committee
View from Lab Management HPS Collaboration Meeting
ESS Project Status Roland Garoby – Technical Director August 2018.
Ciprian Plostinar Workshop on Testing and Commissioning
Details supporting the increase
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Ctclink executive leadership committee May 31, 2018
Project Management Issues John N. Galayda, SLAC April 24, 2002
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Jefferson Lab Users Group Meeting Start of the 12 GeV Era
PIXEL Project Status John Arthur Photon Instrumentation for
SOLID Collaboration Meeting
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008

OUTLINE CD-2 Approval – What does that mean? – What is the project baseline? Path to CD-3 Update: Project Management staffing changes Update: Non-DOE Scope

Thomas Jefferson National Accelerator Facility Page 3 Hall C Users Jan 18, GeV CEBAF 11CHL-2 12 Upgrade magnets and power supplies Two 0.6 GV linacs 1.1 Enhanced capabilities in existing Halls

Hall C: SHMS and HMS

Thomas Jefferson National Accelerator Facility Page 5 Hall C Users Jan 18, 2008 WBS Hall D Complex (New Construction) Facilities Mgt has begun tree-clearing and retention pond

Thomas Jefferson National Accelerator Facility Page 6 Hall C Users Jan 18, 2008 WBS Hall D Complex (Rendering) Hall D Counting House Cryo Plant Tagger Area Service Building N Photon Beam Dump

Thomas Jefferson National Accelerator Facility Page 7 Hall C Users Jan 18, 2008 Path to CD-2 Approval November 9, 2007

DOE Project Critical Decisions CD-0 Approve Mission Need CD-1 Approve Alternative Selection and Cost Range Permission to develop a Conceptual Design Report Defines a range of cost, scope, and schedule options CD-2 Approve Performance Baseline Fixes “baseline” for scope, cost, and schedule Now develop design to 100% Begin monthly Earned Value progress reporting to DOE Permission for DOE-NP to request construction funds CD-3 Approve Start of Construction CD-4 Approve Start of Operations or Project Close-out

Thomas Jefferson National Accelerator Facility Page 9 Hall C Users Jan 18, 2008 DOE CRITICAL DECISION SCHEDULE CD-0 Mission NeedMAR-2004 (A) CD-1 Preliminary Baseline RangeFEB-2006 (A) CD-2 Performance BaselineNOV-2007 (A) CD-3 Start of ConstructionSEP-2008 CD-4A Accelerator Project Completion and Start of Operations DEC-2014 CD-4B Experimental Equipment Project Completion and Start of Operations JUN-2015 (A) = Actual Approval Date Now split in two to ease transition into operations phase Note → 6 to 18 months schedule float included

 Conceptual Design (CDR) - finished  Research and Development (R&D) - ongoing  2006 Advanced Conceptual Design (ACD) - finished  Project Engineering & Design (PED) - ongoing (based on baseline funding guidance approved by DOE-NP in Nov 2007) 12 GeV Upgrade: Phases and Schedule

 Construction – starts in < 12 months!  Parasitic machine shutdown – May 2011 through Oct 2011 (6 months)  Accelerator shutdown start mid-May 2012  Accelerator commissioning mid-May 2013  Now-2012 Challenging balance act!  Expectation is to complete ~80% of approved 6 GeV program (Ops funding -limited)  Skill mix – lean (but improving) engineering and design manpower  Pre-Ops (beam commissioning)  Hall A commissioning start ~October 2013  Hall D commissioning start ~April 2014  Halls B and C commissioning start ~October GeV Upgrade: Phases and Schedule

Thomas Jefferson National Accelerator Facility Page 12 Hall C Users Jan 18, GeV UPGRADE SCHEDULE

DOE Generic Project Timeline We are here DOE CD-2 Reviews Nov 2007  1 year Sept 2008

Thomas Jefferson National Accelerator Facility Page 14 Hall C Users Jan 18, 2008 Path to CD-3 Goal - September 2008

Thomas Jefferson National Accelerator Facility Page 15 Hall C Users Jan 18, 2008 Path to CD-3 Finish R&D –Hall B: pre-shower calorimeter (Jun 08) –Hall B: beamline design (Jul 08) –Hall B: FDC – mechanical (Sep 08) –Hall B: FDC – electrical (Sep 08) –Hall C: SHMS HB magnet (Apr 08 and Sep 08) –Hall D: barrel calorimeter fiber tests (Jun 08) –Hall D: tagger prototype (Jun 08) –Hall D: FADC prototype Master Trigger (Aug 08) –Hall D: auxiliary electronics prototype (Aug 08) –Hall D: FDC and CDC prototypes (Sep 08)

Thomas Jefferson National Accelerator Facility Page 16 Hall C Users Jan 18, 2008 Path to CD-3 Nearly finish PED (tight schedule !!) –100% design for all FY09 procurements –~80% design for everything else –Design/safety reviews (~8 for Physics) –Complete Advance Procurement Plans Major Milestones –OECM EVMS Contractor Certification Review (Jan 08) –Design Review of Superconducting Magnets (Apr 08) –Safety Assessment Document Complete (Jun 08) –Accelerator Safety Envelope Complete (Jun 08) –Design of Conventional Facilities Complete (Sep 08)

Thomas Jefferson National Accelerator Facility Page 17 Hall C Users Jan 18, 2008 Path to CD-3 CD-3 Documents –Check-out, Testing and Commissioning Plan (May 08 draft) –12 GeV Construction Project Safety and Health Plan (May 08) CD-3 DOE Reviews –2008 “Lehman” Independent Project Review (IPR) –CD-3 briefing package due to DOE-NP ~week of June 16th –IPR scheduled (tentatively) for July CD-3 Approval meeting in late September 2008

Thomas Jefferson National Accelerator Facility Page 18 Hall C Users Jan 18, GeV Project Management Staffing Updates

12 GeV Project Office M. Spata C. Rode (Acting) J. Hogan Search Committee Formed; R. Ent chair

12 GeV Integrated Project Team (IPT) Members PEP, Section 4.1 includes the description and charter of the IPT DOE-TJSO DOE-NP JSA-TJNAF

Thomas Jefferson National Accelerator Facility Page 21 Hall C Users Jan 18, 2008 Confirmed to date: Foreign – donation of HERMES lead glass blocks for Hall C SHMS calorimeter thanks to Armenia / Nikhef ! NSF – MRI grant for Hall C detector systems approved June 2007 ; (W&M/HU/JMU/NCA&T) strong collaboration of experienced Hall C Users detector integration review scheduled for Jan 22, 2008 Virginia – PED funds ($650K) FY06/07 ; Construction funds ($500K) FY08 Non-DOE Scope

Thomas Jefferson National Accelerator Facility Page 22 Hall C Users Jan 18, 2008 Potential (proposals in development): Foreign: Hall B Central Detector EU proposal Two NSERC requests (re Hall D BCal ; Hall C Cerenkov) NSF MRI: Hall B Preshower (OU/NSU/JMU) Hall B Longitudinal Polarized Target (possible, non-12 GeV) ; (ODU/CNU) Virginia – request for $9.5M Construction funds FY09-11; Governor’s budget includes $7.5M in FY09-10 so far…. Non-DOE Scope

12 GeV Upgrade Summary Construction start in < 12 months Critical Decision 2 in November 2007 (baseline) Critical Decision 3 in September 2008 (construction start) We are on track for accomplishing this, but PED schedule is tight ! Challenges: Maintaining/building science case within political arena – Users! Balancing ongoing operations with construction project – communication! Note - Quarterly meetings with Hall 12 GeV Steering Committee reps, UGBOD Chair, and 12 GeV Project Mgt reps have begun ; J. Roche is rep for Hall C