Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Glast italian software meeting, Udine 01/30/2003 Luca Latronico The GLAST online software Gamma-ray Large Area Space Telescope Luca Latronico Glast Italia.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectI&T/Online Workshop October 29 to November 1, 2002 R. Claus1 EM1 EGSE Configuration VME/cPCI Chassis LAT-COMM Electronics/OnlineSubsystem/simulator.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST Large Area Telescope:
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
GLAST Large Area Telescope:
Mini-Tower test results
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope
GLAST Large Area Telescope:
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
BESIII EMC electronics
GLAST Large Area Telescope:
Mini Tower Preliminary Results
GLAST LAT System Engineering
Status Report and highlights from workshop II
Presentation transcript:

Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico INFN-Pisa

Tracker Subsystem2 GLAST LAT Project Production Readiness Review, 25 August, 2004 Relevant Documents LAT-TD-00191GLAST Lat Tracker Tower Electrical Test Plan to be released LAT-TD-03362TKR EGSE Test software user’s guide to be released Reference documents LAT-PS-03361Stacked Trays Test Plan to be released LAT-PS-03534Single Tray Electrical Test Plan released LAT-PS-03359MCM Incoming Inspection Test Plan released

Tracker Subsystem3 GLAST LAT Project Production Readiness Review, 25 August, 2004 Test Plan and procedures Test ID Test titleCheckTest typeTKR scriptPass/fail TE101Power consumption and leakage current measurement power and currentpowerTkrPowerConsumptionTest I leakage < 4 mA IDVDD = (504 ±180) mA IAVDDA = (504 ±180) mA IAVDDB = (130.5 ±180) mA TE201GTRC registers load and readback GTRC configuration register functionalTkrGTRCConfigurationData read back must be identical to those written TE202GTFE registers load and readback GTFE channel masks, mode functionalTkrGTFECheckData read back must be identical to those written TE203Layer readout configurations MCM readout redundancy functionalTkrReadingConfigurationTestThe default configuration with 12 GTFEs per GTRC must work, and all pulsed channels must show in the output data stream, with the only exception of possible dead channels TE302Single strip noise occupancy noisy chans searchcalibrationTkrNoiseOccupancyThe occupancy of a good channel should not exceed A maximum of 16 bad channels are allowed TE306Layer threshold scanlayer threshold setting and working point search calibrationTBDA single-strip noise occupancy, averaged on each layer, shall be < at a threshold DAC = 30 (range 0) TE401Self-trigger Data takingtrigger line and system operation systemTkrDataTakingSystem must work in operating conditions with reasonable self-trigger rate (to be specified) Test ID Test titleCheckTKR scriptApplies toPass/fail TE201GTRC registers load and readback GTRC configuration register TkrGTRCConfigurationMCM, tray, stack, tower Data read back must be identical to those written TE202GTFE registers load and readback GTFE channel masks, mode registers TkrGTFECheckMCM, tray, stack, tower Data read back must be identical to those written Minimal functional Test Suite Limited Performance Test Suite (LPT)

Test ID Test titleCheckTest typeTKR scriptPass/failoffline TE101Power consumption and leakage current measurement power and currentpowerTkrPowerConsu mptionTest I leakage < 4 mA IDVDD = (504 ±180) mA IAVDDA = (504 ±180) mA IAVDDB = (130.5 ±180) mA No TE102Temperature monitoring cable temperature sensors powerTBDAt least 8 working sensors roughly uniformly distributed over the tower height on all four sides No TE201GTRC registers load and readback GTRC configuration register functionalTkrGTRCConfig uration Data read back must be identical to those writtenNo TE202GTFE registers load and readback GTFE channel masks, mode functionalTkrGTFECheckData read back must be identical to those writtenNo TE203Layer readout configurations MCM readout redundancy functionalTkrReadingCon figurationTest The default configuration with 12 GTFEs per GTRC must work, and all pulsed channels must show in the output data stream, with the only exception of possible dead channels No TE301Single strip gain and noise chans livenesscalibrationTkrNoiseAndGa in Channels with gain below 50mV/fC are dead, channels with noise less than 500 electrons (ENC) are disconnected. A maximum of 16 bad channels is allowed No TE302Single strip noise occupancy noisy chans search calibrationTkrNoiseOccup ancy The occupancy of a good channel should not exceed A maximum of 16 bad channels are allowed No TE303GTFE threshold scanGTFE threshold setting and working point search calibrationTkrTriggerRateThe FE maximum trigger rate should be greater than 100 Hz, and lower than 10Hz at threshold DAC =50 (range 0) No TE304TOT CalibrationTOT liveness and gross linearity calibrationTkrTotTestThe slope of the time_vs_charge straight line fit should be between 1 to 5 microsec/fC No TE305GTFE noise occupancy scan threshold setting and layer noise performance calibrationTkrLayerNoise Occupancy The layer must be able to issue self-trigger signals with a rate > 1Hz on each layer when operated in standard conditions No TE401Self-trigger Data taking trigger line and system systemTkrDataTakingSystem must work in operating conditions with reasonable self-trigger rate (to be specified) No TE503Efficiency, resolution and alignment performance testsystemTkrDetectionEffi ciency LAT-SS §5.7, §5.8 LAT-SS §6.1, §6.2 Yes Complete Performance Test Suite (CPT)

Tracker Subsystem5 GLAST LAT Project Production Readiness Review, 25 August, 2004 TypeManufacturer/Model/ID Number/Version VME CrateDawn VME Products , VME64x (series 767) VME SBC cardMotorola PN MVME VME LCB Mezzanine cardLAT-TD VME, TST-STP Trans cardLAT-DS EGSE Software for the local PCLATTE P or later, TKR v3p0 or later DC power supplyBK Precision MN1786A PS Control cableLAT-DS Volt supply cableLAT-DS LCB Transition board cableLAT-DS CAT5 Ethernet cableTRD855PL-50 RS-232 CableTDC003-7 (RECO98M connectors) Jumper cablesLAT-DS Tracker Flex Cable Power Breakout BoxLAT-DS Digital Multi-MeterFLUKE AC/DC mini clamp adaptorEXTECH used on MCM incoming 1 used for stacked tray test 1 at G&A for tray acceptance 1 rejected and sent back to SLAC 2 on the way from SLAC  will use one of the new ones or move the system currently on trays stack Hardware tools - EGSE system components and status

Tracker Subsystem6 GLAST LAT Project Production Readiness Review, 25 August, 2004 Software tools - EGSE Tracking system Test configuration List of hardware under test Interface to EGSE Runcontrol system Provide list of test to perform according to test configuration Retrieve TKR test reports and test outcome and dump them on the Pisa server

Tracker Subsystem7 GLAST LAT Project Production Readiness Review, 25 August, 2004 LATTE Main GUI LOG window TKR parameters GUI Software tools - EGSE Runcontrol and TKR Test reports TKR scripts under configuration control (CVS) Already in use for flight MCM and trays tests

Tracker Subsystem8 GLAST LAT Project Production Readiness Review, 25 August, 2004 Software tools - EGSE Runcontrol and TKR Test reports Test reports generated by TKR test scripts Pass/fail criteria encoded in TKR scripts TKR tower GUI for layers selection

Tracker Subsystem9 GLAST LAT Project Production Readiness Review, 25 August, 2004 Conclusions EGSE hardware is well understood and we have valuable experience with it The EGSE systems for tower test in Pisa (during assembly) and Alenia (after env. Tests) are on their way from SLAC – will need some time to run acceptance test on them EGSE LATTE framework is well understood and supported from I&T- Online - TKR test script fit very well in the LATTE framework Most tests have an associated working script, already regularly applied to MCMs, single trays, stack of trays. The few missing are reduced version of other scripts and will be ready soon A tracking system is already in use Documentation needs update tower A electrical test can be performed on schedule