# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.

Slides:



Advertisements
Similar presentations
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Advertisements

Line Efficiency     Percentage Month Today’s Date
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
Project Management and MS Project. The project management triangle: Time Resources Scope.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Simulations and Response / R. M. Kippen (LANL)- 1 - GBM BWG Review, 31 August 2004 GBM Simulation and Instrument Response R. Marc Kippen Space and Atmospheric.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
SOWG # 6, 20/01/2015 ESAC Agenda  Finalization of the service 20 specifications  Test plans for the service20 at spacecraft level  Instruments.
ACES Spring 2003 Overview Where are we going? How are we going to get there?
Q u a l i t y 1 Austin Energy Electric Service Delivery Quality Management System.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
GLAST User’s Committee Meeting– 1 – June 6-7, 2005 GLAST Burst Monitor (GBM) Chip Meegan NASA/MSFC.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
Lake Powell Operations CRFS Spring 2015 March 25, 2015.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
 System Requirement Specification and System Planning.
Jan 2016 Solar Lunar Data.
SPF MAG Quarterly Report – Feb 2015
I&T&C Organization Chart
GLAST Large Area Telescope:

GLAST Large Area Telescope




Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE


FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule

Step 3 Step 2 Step 1 Put your text here Put your text here
Priorities and contents of releases




Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
GLAST Large Area Telescope
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Integration & Test Instrument Operations Coordination
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design Review Peer Reviews: EM1 (Mar ’03), EM2 (Feb ’04), Flight Unit (Sep ’04) Sys Checkout TRR, All Test Procedures completed – Sep ‘05 –PRESENT (This/Next Month): Build – 10/24/05 - All FSW functionality minus known liens Build – 11/14/05 – To FSW Test Team –Release planned for use in Phase I / System Test – To I&T on 11/23 (Happy Thanksgiving!) Build/Release /9/05 –To FSW Test Team –12/20/05 – Release to I&T for use with System Test Phase 2 – (Merry Christmas!) Test Scripts Complete; FQT (Formal Testing): 12/14 – 12/20 –FUTURE: Support I&T needs of FSW. Additional Development for GRB Processing & Test Scripts for same.

# - 2 E. Andrews LAT System Test w/ FSW

# - 3 E. Andrews LAT SW Schedule Presented 11/3

# - 4 E. Andrews  Key FSW Milestone Dates –PAST: April ‘02 – Preliminary Design Review (PDR) Aug ’03 – Data Processing Unit and FSW Critical Design Review (CDR) Aug ’04 – Instrument CDR Mar ’05 – Delivery of Build 1.1 FSW- Version placed in PROM Aug ’05 – Development of Burst Algorithms Completed –PRESENT (This/Next Month): 10/15/05 – Complete SW to provide all Burst Related Telemetry Records 11/14/05 – Complete SW to provide all Burst Related info to LAT per ICD. 12/1/05 – FSW mods to resolve connector misplacement on PSB. 12/1/05 – Feature Freeze for Build 1.9 to be used in T-V testing in January. 12/15/05 – Turnover to Testing team for installation/checkout on Flight DPU –FUTURE: GRB Telemetry rate management on 1553 (sharing the 1 kbps link with LAT) AGC Algorithm (low Priority) GBM Software Schedule

# - 5 E. Andrews GBM FSW Requirements As of 10/28 Rqmnt #Requirement Title"Group"Remaining (Weeks) 91Background Model.BG Modeln/a 92Background Model Quality.BG Modeln/a 93Background Estimate.BG Modeln/a 94Background Estimate Quality.BG Modeln/a 107Coordinate Transformations.Locationn/a xxDetermining SC Side - Cmd/EEPROMSC Side1.0 95Quick Location Algorithm.Location2.0 96Refined Location Algorithm.Location"same" xxDiagnostic Telemetry ModificationsDiag TM0.8 97Spectrum and Intensity.Location3.0 98Trigger Classifcation.Locationwks for all three 99Reliability Estimates.Location 44TRIGDAT Format.TRIGDAT0.2 45TRIGDAT Trigger ID.TRIGDAT TRIGDAT Immediate Summary Information to Ground Record. TRIGDAT0.2 47TRIGDAT Trigger Rates to Ground Record.TRIGDAT0.4 48TRIGDAT Calculated Information to Ground Records.TRIGDAT0.4 49TRIGDAT Max Rates to Ground Records.TRIGDAT0.6 51TRIGDAT Time History to Ground RecordsTRIGDAT0.8 Note: All High Priority Requirements Completed KEY: Done High Priority - Next Medium Priority Low Prioity

# - 6 E. Andrews GBM FSW Requirements Remaining (10/28/05) Rqmnt #Requirement Title"Group" Remaining Effort (Weeks) 52TRIGDAT Calculated Information to LAT Record.TRIGDAT0.4 53Repoint Recommendation Process.TRIGDAT2.0 54TRIGDAT Repoint Recommendation to LAT Record.TRIGDATAs a group of Closeout Record to LATTRIGDAT 55TRIGDAT Bandwidth.TRIGDAT3.0 20Trigger Enable Suspend. (a,b,c)BG Model AGC Accumulation for AGC.AGCFor all AGC 102AGC Accuracy.AGC 103AGC Times of Operation.AGC 104AGC Response to External Changes.AGC AGC Data Age.AGC AGC Data Quality Test.AGC KEY: Done High Priority - Next Medium Priority Low Prioity

# - 7 E. Andrews Spacecraft Flight Software  Key FSW Milestone Dates –PAST: Jan & May ’03 – FSW Requirements Review & Preliminary Design Review April ‘04 – SC FSW CDR Dec ’03, Summer ’04, Spring ’05 – Code Walk Throughs / Peer Reviews Oct ’05 – Delivery of Build 3 (Release 1) for Flight Hardware testing. –PRESENT (This/Next Month): 10/21/05 – Formal Testing of Release 1; Delivery of CDRL 18 (VDD) –FUTURE: 11/05 – 2/06 – Development & implementation of POAL. 1/06 – Integrate ‘final’ GNC FSW build from MATLAB/Simulink Model. 2/06 – Test Ready Review (TRR) and Formal Qual Testing (FQT) of FSW 3/06 – Delivery of Release 2 to SC I&T – FSW final planned release. –Bug fixes to R2 as necessary 6/06 – First release of Software User & Maintenance Manual (CDRL 19)