Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.

Slides:



Advertisements
Similar presentations
A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.
Advertisements

Capacity Studies on Transportation Network Presented by Rakesh Ambre ( ) Under Guidance Of Prof. Narayan Rangaraj.
CE 515 Railroad Engineering Capacity Source: REES Module 6 & An Enhanced Parametric Railway Capacity Evaluation Tool
Software Process Models
Hallway Traffic Simulator Peter Riggs Computer Systems Lab
BALTPORTS-IT - IST ____________________________________________________ The Port Process Simulator Using the Port Process Simulator The main.
Abstract The SEPTA Regional Rail system serves as an important network for the Philadelphia region, moving many commuters during the peak hours on suburb-to-city.
Train platforming problem Ľudmila Jánošíková Michal Krempl University of Žilina, VŠB-Technical University of Ostrava, Slovak Republic Czech Republic.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Rake Linking for Suburban Train Services. Rake-Linker The Rake-Linker assigns physical trains (rakes) to services that have been proposed in a timetable.
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
1 February 2009 Analysis of capacity on double-track railway lines Olov Lindfeldt February 2008.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
Ing. Tomáš Vicherek, Ing. Vlastimil Polach, Ph.D. Research and development Automatic Route Setting According to Train Paths in Anticipated Time Schedule.
Step-by-Step Tutorial NEXTA: Simulation Data Visualizer for TRANSIMS
Company confidential Prepared by HERE Transit Sr. Product Manager, HERE Transit Product Overview David Volpe.
Visual Traffic Simulation Thomas Fotherby. Objective To visualise traffic flow. –Using 2D animated graphics –Using simple models of microscopic traffic.
Final Exam Tuesday, December 9 2:30 – 4:20 pm 121 Raitt Hall Open book
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Simulation.
 Elevator Scheduling Lingfeng Luo Zhao Han. Elevator Scheduling Problem  Elevator as a control System  Behavior depends on programmed algorithms 
Optimal Design of Timetables to maximize schedule reliability and minimize energy consumption, rolling stock and crew deployment.
Slide 1 ILLINOIS - RailTEC Capacity of Single-Track Railway Lines with Short Sidings to Support Operation of Long Freight Trains Ivan Atanassov, C. Tyler.
Rail Related Research at IIT Madras
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 2 - Who, What Why?
1. PROJECT GOAL Our final product will be an interactive public website which will allow the user to view various aspects of our current and future infrastructure.
1 Developing the MBSE Approach Tony Ramanathan Principal Engineer Network Rail.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 9 - The TOCs and Network Rail.
Traffic Management System And Passenger Information System Western Railway Experience.
TeNeT Group1IRSTE Seminar Information and Communication Technology (ICT) and Indian Railways Ashok Jhunjhunwala, TeNeT group, IIT Madras
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Chapter 6 Control Using Wireless Throttling Valves.
Workshop PRIXNET – 11/12 Mars CONGESTION PRICING IN AIR TRANSPORTATION Karine Deschinkel Laboratoire PRiSM – Université de Versailles.
Computational Experiments Algorithm run on a Pentium IV 2.4 GHz Instances from “Rete Ferroviaria Italiana” For each station: - minimum interval between.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
Anders Peterson Fahimeh Khoshniyat Dept. of Science and Technology Linköping University, Norrköping, Sweden 6 th May 2014 Effects of Travel Time Dependent.
Asst. Prof. Dr. Mongkut Piantanakulchai
TRAIN MANAGEMENT SYSTEM ON MUMBAI SUBURBAN SECTION OF CENTRAL RAILWAY
Ekstrom Math 115b Mathematics for Business Decisions, part II Trend Lines Math 115b.
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
Integration of Transportation System Analyses in Cube Wade L. White, AICP Citilabs Inc.
Problem Statement The energy and transportation demands continue to rise across the state of Iowa. An investment plan will need to be created for the.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice November 8 th, 2007.
Introduction to Software Development. Systems Life Cycle Analysis  Collect and examine data  Analyze current system and data flow Design  Plan your.
Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Michigan Tech. University Michigan Tech. University PhD Candidate.
ECE 466/658: Performance Evaluation and Simulation Introduction Instructor: Christos Panayiotou.
Experimental Evaluation of Real-Time Information Services in Transit Systems from the Perspective of Users Antonio Mauttone Operations Research Department,
1 Presented by Sarbagya Buddhacharya. 2 Increasing bandwidth demand in telecommunication networks is satisfied by WDM networks. Dimensioning of WDM networks.
Bruxelles, 29/30 th January, 2014 Report on TSI OPE revision RISC 69 th.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Content caching and scheduling in wireless networks with elastic and inelastic traffic Group-VI 09CS CS CS30020 Performance Modelling in Computer.
ITree-Hydro (Beta Version) Hydro is a stand alone application designed to simulate the effects of changes in tree and impervious cover characteristics.
Charting Tool A tool for a computerised Master chart (developed for Mumbai Central Division, Western Railway) IIT Bombay, Western Railway Presentation.
Q/.r NSRZKLA4-P1 Timetable planning Leo Kroon Sept 9, 2003.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
CE2303 Railway Engineering
BDTS and Its Evaluation on IGTMD link C. Chen, S. Soudan, M. Pasin, B. Chen, D. Divakaran, P. Primet CC-IN2P3, LIP ENS-Lyon
Event Based Simulation of The Backfilling Algorithm OOP tirgul No
Simulation of mixed traffic on a railway section
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
Public Conference December
Red Line Customer Capacity Update
Track5: Use of Technology to bring innovation in Training
Track circuit reliability assessment for preventing railway accidents
Analysis of capacity on double-track railway lines
Jim Henricksen, MnDOT Steve Ruegg, WSP
Introduction to Materials Management
ATO over ETCS Benoît BIENFAIT 10/2/2016.
Preparing for a Successful Semester Switch
World-Views of Simulation
Presentation transcript:

Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.

Objectives of the Simulator Observing effects of making changes to the existing timetable Observing effects of making changes to the existing timetable Estimating section capacity Estimating section capacity Analyzing the effect of introducing extra scheduled trains in the section Analyzing the effect of introducing extra scheduled trains in the section

Objectives of the Simulator Visualizing the consequences of signal failure and delays of trains. Visualizing the consequences of signal failure and delays of trains. To model and represent different arrival patterns and compositions of traffic on section. To model and represent different arrival patterns and compositions of traffic on section. Evaluating investment proposals at local level Evaluating investment proposals at local level

Objectives of the Simulator To present the impact of changed operational parameters such as To present the impact of changed operational parameters such as Speed of trains Acceleration/Deceleration Loop entry/exit velocities To experiment with different scheduling possibilities based on - To experiment with different scheduling possibilities based on -ThroughputDelaysPriorities Due dates lateness Slack in timetables.

Capacity Planning Line /Section Capacity: Number of (standardised) trains that can be run on a given section Estimated by Scott’s Formula Scott’s Formula Master chart preparation Master chart preparation This can be done only for a static, known traffic scenario

Current notion of capacity The number of trains that can be handled with “reasonable” transit time (say, twice the bare minimum transit time). This accounts for the prevailing traffic mix and congestion effects.

Software  Uses Java 2 as development platform.  User specified data files are read and station and blocks are modeled accordingly  Trains are sorted in the order of their priorities  Runs in ‘one train at a time’ or‘complete simulation’ modes

Inputs Station details Station details Loop details Loop details Block details Block details Scheduled trains data Scheduled trains data Freight train data Freight train data Simulation parameter data Simulation parameter data Gradient specification data Gradient’s effect details Signal failure details Delay specification data In MS Excel or ASCII Text format

Output Loop /platform occupancies Block occupancies Traversal time of trains (timetabled passenger as well as non-timetabled freight trains); Averages of such times Plot of distance vs. time in the master chart format Velocity profile and signal aspect displays Signal headway

Algorithm

Departure Time Based Priority Scheduling of Passenger Trains The train with higher priority is scheduled first If two trains have the same priority Compared for their departure times, for scheduled passenger trains Compared for their departure times, for scheduled passenger trains Compared for their arrival times, for freight trains Passenger train with earliest departure or freight train with earliest arrival time is scheduled first

Preference Based Resource Allocation for Passenger Trains Exploring other possible alternate paths through the station if the preferred loop is not available by passenger train Ensures a much efficient use of available resources to facilitate a smooth passage past the section.

Simulation Output without searching alternate paths

Simulation Output with searching alternate paths

Signal Spacing and Headway Analysis on Suburban sections Supports automatic signaling on mainline sections and relevant track and train detail in operation. Study for Central Railway on signal spacing and headway analysis. Study for Central Railway on signal spacing and headway analysis.