Preparing for a Wind Lidar Venture Class Mission Discussion at Lidar Working Group Meeting Bar Harbor, ME August 24 – 26, 2010 Dr. Wayman Baker 1.

Slides:



Advertisements
Similar presentations
1 Doppler Wind Lidar Technology Roadmap Ken Miller, Mitretek Systems Coauthors –see Reference 2 January 27, 2004.
Advertisements

1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
Performance characteristics and design trades for an ISS Hybrid Doppler Wind Lidar G. D. Emmitt and S. Wood Simpson Weather Associates Charlottesville,
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
Icarus Student Satellite Project Hannah Goldberg Dr. Brian Gilchrist BT Cesul Student Space System Fabrication Lab (S 3 FL) University of Michigan, College.
METEOR BACKGROUND This is a foundation project in an ambitious endeavor to provide the RIT research community with a means to conduct near space.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Icarus Student Satellite Project
Systems Engineering Management
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
Space Engineering Institute (SEI) Space Based Solar Power Space Engineering Research Center Texas Engineering Experiment Station, Texas A&M University.
Status of the Hybrid Doppler Wind Lidar (HDWL) Transceiver ACT Project Cathy Marx (NASA/GSFC), Principal Investigator Bruce Gentry (NASA/GSFC), Michael.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
Application of a High-Pulse-Rate, Low-Pulse-Energy Doppler Lidar for Airborne Pollution Transport Measurement Mike Hardesty 1,4, Sara Tucker 4*,Guy Pearson.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
Science Objectives for the ATHENA-OAWL Venture Tech Airborne Mission M. Hardesty CIRES University of Colorado/NOAA S. Tucker and C. Weimer Ball Aerospace.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
Space Engineering 2 © Dr. X Wu, 2012
Al Cooper Jeff Stith Earth Observing Laboratory (EOL) HIAPER Debrief 9 November 2005 Ongoing Development and Support: EOL Plans for Deployment of HIAPER.
Galactic Bulge Time On Target May These charts examine the compatibility of a 500 day microlensing program with a 6 month SNe observing program.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
Command and Data Handling (C&DH)
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Nd:YAG Laser Power Cycling The Direct Detection Doppler Lidar uses a frequency tripled Nd:YAG laser, the same laser technology used in MOLA, GLAS, MLA,
1 Global Tropospheric Winds Sounder (GTWS) Reference Designs Ken Miller, Mitretek Systems January 24, Jan-02.
Scaling Surface and Aircraft Lidar Results for Space-Based Systems (and vice versa) Mike Hardesty, Barry Rye, Sara Tucker NOAA/ETL and CIRES Boulder, CO.
B. Gentry/GSFCGTWS 2/26/01 Doppler Wind Lidar Measurement Principles Bruce Gentry NASA / Goddard Space Flight Center based on a presentation made to the.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
AAE 450- Propulsion LV Stephen Hanna Critical Design Review 02/27/01.
Recent Developments NASA IDL/MDL study indicated technical feasibility of an ISS mission NASA IDL/MDL cost estimate was well above Earth Venture limits.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Problem Statement Overview of tasks Requirements for selection test.
Update on NASA’s Sensor Web Experiments Using Simulated Doppler Wind Lidar Data S. Wood, D. Emmitt, S. Greco Simpson Weather Associates, Inc. Working Group.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Performance Testing of a Risk Reduction Space Winds Lidar Laser Transmitter Floyd Hovis, Fibertek, Inc. Jinxue Wang, Raytheon Space and Airborne Systems.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
Kavaya - 1 Components of the Space-Based Lidar Winds Roadmap Michael Kavaya, Farzin Amzajerdian, Grady Koch, Jirong Yu, Upendra Singh NASA/LaRC Working.
NPOESS DWL Mass and Power Estimation Ken Miller, Dave Emmitt, Bruce Gentry, Raj Khanna Key West WG Meeting January 20, 2006.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
© 2008 Noblis, Inc. Planning for DWL Airborne Demonstration - Discussion Ken Miller Lidar Working Group Monterey CA February 7, 2008.
1 Summary of Global Tropospheric Wind Sounder (GTWS) Technology Roadmap Ken Miller, Mitretek Systems June 23, 2003.
Simulation Studies in support of an ISS GWOS mission: TropWinds Emmitt, Wood, Greco (SWA) Gentry (GSFC/NASA) Kavaya (LaRC/NASA) DWL WG Meeting 24 – 26.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
1 Architecture Alternatives for the DWL Space Demonstration Ken Miller Mitretek Systems June 28, 2006.
Mullard Space Science Laboratory Using a CCD for the direct detection of electrons in a low energy space plasma spectrometer A CCD in place of an MCP:
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
Kavaya-1 Coherent Doppler Lidar Roadmap to Both the NRC Decadal Survey “Science Demonstration” and “Operational” Missions Michael J. Kavaya Jirong Yu Upendra.
Status of Preparation of Manuscript for DWL BAMS Article Discussion at Lidar Working Group Meeting Miami February 8 - 9, 2011 Dr. Wayman Baker 1.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Adam Schlesinger NASA – JSC November 3, 2011
Preliminary Platform Design for KuaFu-A
Maxim Pathfinder Prework 16 August 1999
Adam Schlesinger NASA – JSC November 3, 2011
Peer Review Agenda (Suggested).
Product Support Considerations
Systems Engineering Management
EagleSat 2 – Mission and Development Overview
Jeff Dutton/NASA COR August 26, 2019
GOLD-2 – Anticipating Customer Needs
Presentation transcript:

Preparing for a Wind Lidar Venture Class Mission Discussion at Lidar Working Group Meeting Bar Harbor, ME August 24 – 26, 2010 Dr. Wayman Baker 1

Objectives Summary of Draft Statement of Work (SOW) for IDL/MDL Study of Feasibility of Deploying a DWL on the ISS 2 1.Beginning with the NWOS design, the IDL will scale lidar energy, prf, and aperture to match the ISS orbit; 2.The NASA/GSFC Mission Design Laboratory (MDL) will design an updated GWOS FRAM/ELC-type payload for the ISS based on the new instrument concept, using the earlier GWOS data requirements and the ISS capabilities; The IDL/MDL will assess technology readiness, risk, and cost for an updated GWOS instrument and ISS mission; 3.The IDL/MDL will provide a preliminary determination for a suitable launch vehicle. Note: The ISS Program will make the final determination.

Assumptions Summary of Draft Statement of Work (SOW) for IDL/MDL Study of Feasibility of Deploying a DWL on the ISS 3 1.A demonstration mission that will not be held to operational lifetime, duty cycle and data download requirements; 2.DWL instrument based on existing GWOS and NWOS concepts, both using the hybrid approach; and, 3.Pointing issues would be handled with “knowledge” rather than “control” (i.e., no gimbaling)

4

IDL SOW Summary of Draft Statement of Work (SOW) for IDL/MDL Study of Feasibility of Deploying a DWL on the ISS 5 The instrument design will meet GWOS data requirements using a hybrid DWL and the ISS 51 degree inclined orbit. It will continue taking data through the earth shadow portion of the orbit. The IDL will: Incorporate any improvements from NWOS, airborne experience, and technology advances to define an updated GWOS instrument conceptual design for the ISS; Use the GWOS data requirements and ISS capabilities; Use shared optics (coherent detection and direct detection lidars) with 4 azimuth angles, crossed-beam optical design, and 45 degree zenith angle as in NWOS; Review NWOS trades in power, mass, volume for 100% duty cycle vs. 50%; Use two-year technology projections, and provide estimates for time and cost to achieve projected technologies; Notes: Would 2 telescopes save significant $ vs. 4 telescopes? With 2 telescopes, maybe the 355 could do the fore perspective and the 2053 do the aft? (MK) Use liquid laser cooling rather than further R&D on conductive cooling. (MK) How about resupplying lasers instead of laser redundancy? (DE) Could an astronaut/mission specialist make a repair? (WB)

IDL SOW (Cont.) Summary of Draft Statement of Work (SOW) for IDL/MDL Study of Feasibility of Deploying a DWL on the ISS 6 For the ISS environment:  Update GWOS instrument development and implementation cost;  Mass, volume, and dimensions of major components of the instrument (e.g., transceiver, optics);  Thermal requirements;  On-board computational requirements;  Downlink bandwidth; and, instrument vibration modes.  Assume a GWOS 3 year mission life, assess the redundancy of critical components with respect to mass, volume, power, and cost. Would a mission life of 3 years be a significant cost driver versus, 1 year, in terms of component redundancy, etc.?  Assume the NWOS concept with a reduced instrument volume using a crossed- inward optical design. Could the reduced instrument volume result in the use of a smaller launch vehicle?  Update and document the efficiency estimates for the laser, optics, and detectors;  Identify any technology or engineering “tall poles” and risks;  Identify any special spacecraft/instrument/ISS interface requirements from the instrument perspective; and,  Identify any potential instrument advantages/disadvantages from operating in one of the ISS attached modules, e.g., the pressurized Japanese Experiment Module.

MDL SOW Summary of Draft Statement of Work (SOW) for IDL/MDL Study of Feasibility of Deploying a DWL on the ISS 7 For the ISS environment, the MDL will design an updated GWOS mission for the ISS using the earlier GWOS data requirements. The mission design will address the following: The operation of the instrument in the ISS environment; Instrument accommodation on the ISS, including any issues related to: - High frequency vibrations; - Slow attitude changes, i.e., from drifts, reboosts, etc.; - Available power (average and peak); - Thermal management; - EMI/EMC; - Contamination effects such as water dumps, approaching vehicle rocket plumes, etc.; - Service and component replacement on orbit; - Data rates (uplink and downlink); and, - Unobscurred nadir view at design nadir angle (e.g., 45 degrees).

MDL SOW (Cont.) Summary of Draft Statement of Work (SOW) for IDL/MDL Study of Feasibility of Deploying a DWL on the ISS 8 Ensure the following areas are in compliance with the FRAM/ELC requirements: Mechanical; Power; Thermal; Flight dynamics; ISS mission operations; Command and data handling; Data systems; Smallest launch vehicle possible, including trades against the requirements; Launch; Reliability; and, Disposal. Estimate mission cost for lifetime recommended by the IDL study; Identify any unique costs related to operating in a manned environment; Identify any technology or engineering “tall poles;” and, Identify special spacecraft/instrument/ISS interface reqts. from a mission perspective. Notes: Would data latency of 30 min be a major cost driver vs. 90 min, 150 min (WB)? Don’t require quick data downlink—accept slowness of whatever link is free (M.K.&L.P.R.). Don’t require vibration isolation—accept when the astronauts ruin the data (M.K.).