Learning Curve and Forgetting Factor Laboratory Exercise 1 IE 3269 – POM R. R. Lindeke, Ph.D.

Slides:



Advertisements
Similar presentations
Chapter 1 Linear Equations and Graphs
Advertisements

AP Statistics Section 3.2 C Coefficient of Determination
11-1 Empirical Models Many problems in engineering and science involve exploring the relationships between two or more variables. Regression analysis.
Correlation and regression
KINETICS.
Polynomial Regression and Transformations STA 671 Summer 2008.
Bode Magnitude Plots Constructed Bode Actual Bode
Chapter 4 The Relation between Two Variables
Learning Curve.
Exponential Growth Section 8.1. Exponential Function  f(x) = ab x where the base b is a positive number other than one.  Graph f(x) = 2 x  Note the.
Ch 9.1: The Phase Plane: Linear Systems
Copyright © 2009 Pearson Education, Inc. Chapter 8 Linear Regression.
Chapter 10 Regression. Defining Regression Simple linear regression features one independent variable and one dependent variable, as in correlation the.
Regression Analysis Using Excel. Econometrics Econometrics is simply the statistical analysis of economic phenomena Here, we just summarize some of the.
Cost Accounting Dr. Baldwin University of Arkansas – Fort Smith Fall 2010.
Homework 4, Problem 3 The Allee Effect. Homework 4, Problem 4a The Ricker Model.
Determining How Costs Behave
Correlation 2 Computations, and the best fitting line.
Excellence Justify the choice of your model by commenting on at least 3 points. Your comments could include the following: a)Relate the solution to the.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Determining How Costs Behave Chapter 10 2/07/05.
11-1 Empirical Models Many problems in engineering and science involve exploring the relationships between two or more variables. Regression analysis.
Relationships Among Variables
Correlation & Regression
Lesson Nonlinear Regression: Transformations.
3 CHAPTER Cost Behavior 3-1.
Unit 2: Engineering Design Process
Inferences for Regression
Linear Equations and Linear Inequalities
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Learning Objective 1 Explain the two assumptions frequently used in cost-behavior estimation. Determining How Costs Behave – Chapter10.
Mr. G DP Physics Physics and Physical Measurement Topic 1.3 Mathematical and Graphical Techniques.
Learning Curves Chapter 19 Sections: Learning Curve Theory
P. Fessia, S. Krog-Pedersen F. Regis, L. Rossi
Copyright © 2010 Pearson Education, Inc. All rights reserved Sec
Linear Regression Least Squares Method: an introduction.
Sullivan – Fundamentals of Statistics – 2 nd Edition – Chapter 4 Section 2 – Slide 1 of 20 Chapter 4 Section 2 Least-Squares Regression.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Ch 61 IT-390Preliminary and Detail Methods. 2 Design and Evaluation ä Preliminary Estimate requested during the initial evaluation for several reasons:
Time series Decomposition Farideh Dehkordi-Vakil.
Graphing Exponential Growth Functions
© The McGraw-Hill Companies, 2005 TECHNOLOGICAL PROGRESS AND GROWTH: THE GENERAL SOLOW MODEL Chapter 5 – second lecture Introducing Advanced Macroeconomics:
CLIC-ILC meeting on costs Cost learning curves: from theory to practice Ph. Lebrun Webex meeting 17 July 2009.
Simple Linear Regression. The term linear regression implies that  Y|x is linearly related to x by the population regression equation  Y|x =  +  x.
VI. Regression Analysis A. Simple Linear Regression 1. Scatter Plots Regression analysis is best taught via an example. Pencil lead is a ceramic material.
Chapter 8 Linear Regression. Slide 8- 2 Fat Versus Protein: An Example The following is a scatterplot of total fat versus protein for 30 items on the.
FW364 Ecological Problem Solving Lab 3: Blue Whales Population Growth.
Correlation – Recap Correlation provides an estimate of how well change in ‘ x ’ causes change in ‘ y ’. The relationship has a magnitude (the r value)
CHAPTER 8 Linear Regression. Residuals Slide  The model won’t be perfect, regardless of the line we draw.  Some points will be above the line.
Residuals Recall that the vertical distances from the points to the least-squares regression line are as small as possible.  Because those vertical distances.
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Slide 8- 1.
Physics 430: Lecture 12 2-D Oscillators and Damped Oscillations Dale E. Gary NJIT Physics Department.
V. Rouillard  Introduction to measurement and statistical analysis CURVE FITTING In graphical form, drawing a line (curve) of best fit through.
Chapter 8 Linear Regression. Fat Versus Protein: An Example 30 items on the Burger King menu:
Simple Linear Regression The Coefficients of Correlation and Determination Two Quantitative Variables x variable – independent variable or explanatory.
Chapter 4 More on Two-Variable Data. Four Corners Play a game of four corners, selecting the corner each time by rolling a die Collect the data in a table.
Stats Methods at IC Lecture 3: Regression.
Determining How Costs Behave
Warm-up Get a sheet of computer paper/construction paper from the front of the room, and create your very own paper airplane. Try to create planes with.
Theme 6. Linear regression
The simple linear regression model and parameter estimation
Chapter 4 Basic Estimation Techniques
FW364 Ecological Problem Solving Class 6: Population Growth
Statistical Data Analysis - Lecture /04/03
Active Learning Lecture Slides
(Residuals and
Exponential Functions
LECTURE 2: MATH REVIEW.
Learning Curves.
Exponential and Logarithmic Functions
CALCULATING EQUATION OF LEAST SQUARES REGRESSION LINE
Presentation transcript:

Learning Curve and Forgetting Factor Laboratory Exercise 1 IE 3269 – POM R. R. Lindeke, Ph.D.

General Ideas on Learning With proper design, the learning effect can be driven together to balance out the grow phase of the product lifecycle! Learning is usually expressed as a % -- the lower the % the faster is the learning! Learning represents the rate of improvement, if it is 20% each time the quantity is doubled, then the learning percent would be 80% (100-20=80). While the learning curve emphasizes time, it can be easily extended to costs as well

Modeling Learning Behavior The learning behavior of systems and individuals is consider to follow this model: b is a decimal value (<1) that relates the improvement seen as repetitions increase y = ax b y - time to assemble the xth unit a - time to assemble the 1st unit b - measure of "Learning Rate" x - unit number

Working with data in the Learning Experiment When building a Learning Curve, we should perform a linearization operation and find a “least squares” regression fit to our experimental data set To linearize our data set, compute the Log (base 10 or base e) of observed times and unit number of repetition The ‘intercept’ of the fitted line (log data plotted on a linear axis!) is the log(a) value for the linear fit (a as defined above) The slope of the fitted line is the b value in the learning curve equation And note: Learning Rate = 10^(b*log2)

Computing ‘b’ – by hand uses selected data when observed unit number doubles Using the learning ideas stated above b = log(time-ratio units double )/log(2) This equation can be used as a spot check, real slope, and thus real learning rate, is computed by regression using all our observations!

Learning “In the Limit” Mathematically, we can see that if we are positively learning, the b value is a negative number (indicating a decimal value b<1) Eventually, the time to assembly or perform any learnable task will approach an asymptotic value that is controlled by the time it takes the ideal worker to accomplish all the required steps – this is a number that can be computed using (micro) motion analysis and the various steps needed Our learning curves will eventually fail to predict expected times for performing an activity (they will eventually underestimate actual times)

Considering the Forgetting Factor Like all human activities (consider your math or physics courses!!?!) if we stop doing something for awhile, we are ‘rusty’ when we start up again Same ideas hold true for manufacturing! This idea is called the forgetting factor (mathematically)

Computing FF Effects: Forgetting Factor studies consider Production Rate (compared to production times as seen in learning curve) The model of the forgetting factor computes the rate loss due to forgetting between batches This value can be used (along with learning curve values) to project batch by batch production rates (and times)

The Forgetting Factor Model:

Using Learning & Forgetting to Project Forward:

Continuing:

Projecting forward to 601 w. FF: This iterative computational method can be continued over any number of batches using a similar technique

Computing Batch Times (for planning)

Using Batch Predictors: These are effective during interrupted processing They are obsolete once asymptotic times are reached (unit times are a constant) They do not hold if forgetting factors are “in play”

Summary: The idea of the Learning Curve is universal It has a greater impact on complex than simple production systems Organizations can plan production around this effect To ramp up to match product life cycle curves Organization must guard against the Forgetting Factor Effect This is one of the reasons for modern CAM to be profitable Forgetting factors are less pronounced if the ways are remembered by design Forgetting is less important if only similar are processed regardless of batch time and time between batches Forgetting is affected greatly by the time away for a specific product

Summary, Typical Learning Rates: By Operation Mix 75% hand assembly/25% machining = 80% learning 50% hand assembly/50% machining = 85% learning 25% hand assembly/75% machining = 90% learning

Summary, Typical Learning Rates: By Industry Aerospace 85% Shipbuilding 80-85% Complex machine tools for new models 75-85% Repetitive electronics manufacturing 90-95% Repetitive machining or punch-press operations % repetitive electrical operations 75-85% Repetitive welding operations 90% Raw materials 93-96% Purchased Parts 85-88%