Presented by, Brett Parker, BNL-SMD QD0 Prototype Status.

Slides:



Advertisements
Similar presentations
CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
Advertisements

Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule.
Status Report to ATF2 Technical Board Brett Parker, BNL-SMD URL : 11th ATF2 Project.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
PXIE: SSR1 Section Focusing Lens 1.Requirements table 2.Developed at FNAL 3.Available from vendors 4.Used at ANL 5.Layout of the SSR1 cryomodule 6.Case.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Brett Parker Brookhaven National Laboratory Superconducting Magnet Division 20 October 2010 ILC QD0 R&D Update IWLC2010 International Workshop on Linear.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
Tracking Integration Challenges Y. meeting 2013/9/25.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
M. Modena, A. Aloev CERN, Geneva, CH “An alternative Super-ferric design for ILC QD0” “LCWS14, 6-10 October 2014 Belgrade.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Brett Parker* BNL-SMD *For BNL Superconducting Magnet Division and the ATF2 Superconducting Magnet Upgrade Collaboration ILC Superconducting Final Doublet.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
LEPP meeting Dan Peterson ILC highlights : Development of a TPC for the ILD detector at the ILC There are some significant differences between.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
AGENDA: 1) SDO Procurement ACTIONS has noted at last meeting (10 June): ALEXANDER: magnetic forces during assembly to be computed. In case, we could assemble.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
ILC IR FINAL FOCUS & EXTRACTION MAGNETS Prepared by Andy Marone ILC Workshop, Sept
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
The integration of 420 m detectors into the LHC
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Summary: Detector Integration/Engineering/MDI Marco Oriunno (SLAC), May 31, 2013 ECFA Linear Collider Workshop 2013, DESY.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Magnet Infrastructures and Cavern Layout CLIC Detector WG5, April 1st 2010 Andrea Gaddi Physics Dept. - CERN.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Experimental study on heat transfer through a few layers of multilayer insulation from 300 K to 4.2 K Zhanguo Zong, Norihito Ohuchi, Kiyosumi Tsuchiya,
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
20 April 2010 “ATF2 SC Magnet Upgrade Update,” Brett Parker, BNL-SMD 1 ATF2 SC Magnet Upgrade Update Brett Parker, BNL-SMD One hour ATF2 SC FD Webex meeting.
September 27, 2007 ILC Main Linac - KOF 1 ILC Main Linac Superconducting Quadrupole V. Kashikhin for Magnet group.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Summary of discussions
Status of BDS (QD0 and SD0) and PCL magnet studies for CLiC
Machine Detector Interface Design Updates
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
presented by Brett Parker, BNL-SMD
MDI Issues M. Sullivan For
Anti-DID, Anti-Solenoid and QD0: MDI Issues and Opportunities
KEK news ( ) S.Tanaka.
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Summary of discussions
ILC Main Linac Superconducting Splittable Quadrupole
as a prototype for Super c-tau factory
IR Beam Transport Status
F.Pasdeloup, H.Prin, L. Williams
Presentation transcript:

Presented by, Brett Parker, BNL-SMD QD0 Prototype Status

Outline: QD0 Prototype Status Report Review (remind) QD0 design details and philosophy. Discuss expectations for QD0 R&D prototype magnet & service cryostat construction and testing in US FY2012. Report on a new synergy with SuperKEKB work. 24 April, 2012 KILC12, Daegu “QD0 Prototype Status,” B. Parker, BNL-SMD 2

ILC TDR QD0 Design Configuration 24 April, 2012 KILC12, Daegu “QD0 Prototype Status,” B. Parker, BNL-SMD 3 Magnet coils for the incoming and extracted beams are mounted on a substantial common support beam structure. The support beam is rigidly attached to the helium containment vessel. The cold mass supports in turn will assure stable alignment with respect to the outer cryostat. Half QD0 SD0 Package Extraction Line Quad Internal Support Points

... and the QD0 Service Cryostat Design 24 April, 2012 KILC12, Daegu “QD0 Prototype Status,” B. Parker, BNL-SMD 4 We avoid having “flowing” cryogens by cooling QD0 with superfluid He-II that is supplied by a special Service Cryostat. The intent is to minimize the sources that might drive vibration.

QD0 Support Structure CAD Section Views 24 April, 2012 KILC12, Daegu “QD0 Prototype Status,” B. Parker, BNL-SMD 5 Cold mass & outer cryostat are assembled together then machined to make tight fighting support keys that constrain the inner & outer vessels to move together.

Manufacturing QD0 Service Cryostat Parts 24 April, 2012 KILC12, Daegu “QD0 Prototype Status,” B. Parker, BNL-SMD 6 Work is on track to finish QD0 construction during FY2012. But we don’t have adequate funds for cryogenic testing in FY

Concept to Measure Magnetic Center Changes. 24 April, 2012 KILC12, Daegu “QD0 Prototype Status,” B. Parker, BNL-SMD 7 Holder can be rotated 90º

How to get measurement coil inside QD0? 24 April, 2012 KILC12, Daegu “QD0 Prototype Status,” B. Parker, BNL-SMD 8 1.9K Extremely tight space to make a warm finger insert!

Vibration Measurement Synergy with SuperKEKB 24 April, 2012 KILC12, Daegu “QD0 Prototype Status,” B. Parker, BNL-SMD 9 Belle-II Detector SuperKEKB goal is a factor 50 luminosity increase with respect to the previous world record KEKB luminosity. To achieve this they use “nanobeam” IR optics that have beam spot stability requirements that are similar to ILC. In fall of 2012 we look to do R&D aimed at developing measurement techniques for in situ vibration studies.

We have learned what is needed to wind long, slender ILC QD0 coils. We have new mechanical scenario for how to install and support QD0 in SiD; ILD is also developing their solution. We expect to have an ILC style QD0 IR magnet system for warm vibration tests; funding is needed for cold tests. Look to make the most of synergy with SuperKEKB and CLIC stability studies. We also have ATF2 FF upgrade coils. Daegu QD0 Status Snapshot in Time.