Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

Slides:



Advertisements
Similar presentations
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Advertisements

Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
MERIT Primary Containment Inspection Van Graves MERIT Video Conference October 13, 2010.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
KT McDonald Target Studies Meeting June 14, Mechanical Issues for the Target System K. McDonald Princeton U. (June 14, 2011) Target Studies Meeting.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
1Managed by UT-Battelle for the U.S. Department of Energy NF Splash Mitigation 12 July 2011 Neutrino Factory Mercury Pool Splash Mitigation V.B. Graves.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 5 Aug 2009 Cryostat Front End Design Update Matthew Glisson Van Graves.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
1Managed by UT-Battelle for the U.S. Department of Energy PASI_2012_Flowing_Target_Challenges Challenges for Flowing Targets Bernie Riemer (ORNL) (Jan.
Target R&D Kirk T McDonald Princeton University Feb. 19, 2014 February 19, 2014 KT McDonald | DOE Review of MAP (FNAL, February 19-20, 2014)1 Scope of.
Neutrino Factory Mercury Vessel: Initial Cooling Calculations V. Graves Target Studies Nov 15, 2012.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
KT McDonald MAP Winter Meeting (SLAC) December 5, Solid Target Options for an Intense Muon Source K. McDonald Princeton U. (December 5, 2014) MAP.
IDS120j WITHOUT GAPS AND WITH MAXIMUM SIZE GAPS ( aka ''NIGHTMARE'' CASE SCENARIO ) SC#4, SC#7 AZIMUTHAL DPD DISTRIBUTION ANALYSIS. Nicholas Souchlas,
20to2T5m100cm Images Van Graves February 13, 2014.
K. McDonald Target Studies Meeting June 29, Materials for the Target System Internal Shield K. McDonald Princeton U. (June 27, 2010) Iron Plug Proton.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
KT McDonald MAP Front End Meeting March 3, Finalizing the C- and Hg-Target Configurations for 6.75-GeV Proton Beams Present studies are for a carbon.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Target Magnets & Shielding Bob Weggel Particle Beam Lasers, Inc. Magnet Optimization Research Engineering, LLC. March 5,
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
Shield Module Design Considerations Adam Carroll Van Graves July 3, 2014.
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
Kinetic Energy Spectra of pi +, pi -, mu +, mu - and sum of all from the 20to4T5m Configuration X. Ding Front End Meeting June 23,
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
IDS120j WITHOUT RESISTIVE MAGNETS ( 20 cm GAPS AND 15.8 g/cc W BEADS ) AZIMUTHAL DPD DISTRIBUTION STUDIES FOR: BP#1, SH#1, SHVS#1/LFL, SC#1+SC#2, BeWind.
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
1 NFMCC Friday Meeting January 4, 2008 Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
IDS120h: PROTON P0-P14 TRAJECTORY FOOTPRINT
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
Neutrino Factory Mercury Catcher Concept
Outline: Why now ? What ? How ?
V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004
Presentation transcript:

Review of Recent IDS120 Target Concepts Van Graves October 31, 2013

2Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 NF Target Concept Evolution (Abridged Version) Historical (Study 2) baseline: 20T (15+5) field MERIT Experiment: 15T solenoid but was proof-of-concept for 20T system MAP: re-started concept development using Study 2 as baseline – Early mercury vessel concept had upstream jet with downstream drain; later switched to upstream drain Subsequent efforts focused on realistic coil sizes, coil shielding, coil configurations Mercury vessel refinement revealed geometric complexities needed to integrate with resistive coils

3Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Concept Evolution (cont’d) Started considering utility & facility requirements – He cooling, splash mitigation, double Hg containment, RH, etc. Coil sizes continued to increased due to shielding issues until IDS120 – Field profile work continued, which led to several coil configurations – IDS-NF continued with 20T baseline, MAP began seriously considering 15T Early 2013 – Latest concept models developed for 15T- and 20T-cases in support of IPAC’13 papers Field tapers to 1.5T over 7m rather than 15m Cryostat breaks considered length of mercury module IDS120_15-1.5T7m3+4 (MAP) IDS120_20-1.5T7m2+5 (IDS-NF)

4Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 IDS120 Coil Comparison - Sections IDS120H IDS120K IDS T7m2+5 IDS T7m3+4

5Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Latest 20T CAD Concept (IDS120_20-1.5T7m2+5)

6Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 IDS120_20-1.5T7m2+5 Front Section

7Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Superconducting coils Mercury Module: mercury jet, collection pool + resistive coils Shielding Module: Tungsten beads, He-gas cooled Cryostat IDS120_20-1.5T7m2+5 Cryo 1 Iso

8Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 IDS120_20-1.5T7m2+5 Cryo 1 CloseUp Incorporates concept for double wall mercury containment

9Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Latest 15T CAD Concept (IDS120_15-1.5T7m3+4)

10Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 IDS120_15-1.5T7m3+4 Front Section

11Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Superconducting coils Mercury Module: collection pool, mercury jet Shielding Module: Tungsten beads, He-gas cooled Cryostat IDS120_15-1.5T7m3+4 Cryo1

12Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 IDS120_15-1.5T7m3+4 Target Module Section

13Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 IDS120_15-1.5T7m3+4 Utility Connections Shielding Helium Remote Handling Features Nozzle Supply Beam Entrance Vent Mercury Drains Mercury Vessel Helium

14Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct T-15T Comparisons

15Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Field Taper Comparison

16Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Vessel Comparison IDS120K IDS120_20-1.5T7m2+5 IDS120_15-1.5T7m3+4 Approx. Magnetic Axes Z=0

17Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 System Comparison

18Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Mercury Module

19Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 IDS120J Mercury Module is Still Current Magnetic Axis View from downstream Upstream beam port

20Managed by UT-Battelle for the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013 Current Mercury Module Description Modular design for remote handling Provisions for beam entry, Hg entry/exit, Hg draining, He entry/exit, chamber venting Double wall Hg containment Double wall Be window Horizontal top, sloped bottom (for draining) Interstitial space radially sectioned for He down-and- back cooling path