MERIT Primary Containment Inspection Van Graves MERIT Video Conference October 13, 2010.

Similar presentations


Presentation on theme: "MERIT Primary Containment Inspection Van Graves MERIT Video Conference October 13, 2010."— Presentation transcript:

1 MERIT Primary Containment Inspection Van Graves MERIT Video Conference October 13, 2010

2 2Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Mercury Primary Containment Inspection 17 Aug – Viewport 2 Sapphire windows removed No obvious surface damage noted Higher quality photographs to be obtained Jet & Beam Mercury Beads Jet & Beam Sapphire Window Gasket

3 3Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 New Photographs Taken 10 Sept With 35mm Camera & Macro Lens Snout Orientation – Beam from Right Top of Container is Up Setup

4 4Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Viewport 2 Upstream Side General surface appearance is uniform Jet

5 5Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Viewport 2 Upstream Side Close-Ups

6 6Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Viewport 2 downstream side Raw material labeling intact Jet SS Plate Label Hg Bead

7 7Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Viewport 2 Top Jet

8 8Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Viewport 2 Bottom

9 9Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Other Viewports Have Similar Images VP1 Upstream VP3 Upstream

10 10Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Primary Containment Microscopic Inspection Dissection of chamber around viewport 2 – Might require purchase of dedicated tool due to radiation & Hg issues – Would also allow sectioning of mercury nozzle piping Decontamination of pieces (includes sapphire viewports) Inspection with SNS scanning electron microscope Cost estimate: $25k

11 11Managed by UT-Battelle for the U.S. Department of Energy MERIT Containment Inspection 13 Oct 2010 Observations Surface appearance consistent throughout interior of primary containment – standard, un-machined surface texture Higher resolution images do not support theory of mercury bead pitting, at least on a macroscopic level Further investigation possible by sectioning chamber, decontaminating and viewing pieces with microscope


Download ppt "MERIT Primary Containment Inspection Van Graves MERIT Video Conference October 13, 2010."

Similar presentations


Ads by Google