Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.

Slides:



Advertisements
Similar presentations
Inventory Systems for Dependent Demand
Advertisements

Material Requirements Planning
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Materials Requirements Planning (MRP) Chapter 16 in Schroeder.
Materials Requirements Planning
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
MRP and ERP Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Material Requirement Planning (MRP)
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 5 th Edition Chapter.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
1 Material Requirement Planning (MRP) Chapter 16 Feb 9, 2006.
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Sales and Operations Planning
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
Materials Requirements Planning
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
Chapter 16 Inventory Systems for Dependent Demand
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Material Requirements Planning
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Materials Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
1DSCI4743 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Structure of the MRP System MRP by period report MRP by date report Planned orders report Purchase requirements Exception reports MRP Programs Master.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Materials Requirements Planning
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 12 Enterprise Resource Planning.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Inputs and Outputs to Aggregate Production Planning
COMPUTER INTEGRATED MANUFACTURING
Resource Planning Systems
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP.
Beni Asllani University of Tennessee at Chattanooga
Material Requirement Planning (MRP)
MRP and ERP.
Inputs and Outputs to Aggregate Production Planning
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell & Bernard W. Taylor, III

Copyright 2006 John Wiley & Sons, Inc.15-2 MRP Structure Figure 15.5 Output Reports MRP by period report MRP by date report Planned order report Purchase advice Exception reports Order early or late or not needed Order quantity too small or too large Data Files Purchasing data BOM Lead times (Item master file) Inventory data Master production schedule Material requirement planning programs (computer and software)

Copyright 2006 John Wiley & Sons, Inc.15-3 Material Requirements Planning (MRP)   Computerized inventory control and production planning system   When to use MRP? Dependent demand items Discrete demand items Complex products Job shop production Assemble-to-order environments

Copyright 2006 John Wiley & Sons, Inc. Primary MRP Reports  Planned orders to be released at a future time.  Order release notices to execute the planned orders.  Changes in due dates of open orders due to rescheduling.  Cancellations or suspensions of open orders due to cancellation or suspension of orders on the master production schedule.  Inventory status data.

Copyright 2006 John Wiley & Sons, Inc. Secondary MRP Reports  Planning reports, for example, forecasting inventory requirements over a period of time.  Performance reports used to determine agreement between actual and programmed usage and costs.  Exception reports used to point out serious discrepancies, such as late or overdue orders.

Copyright 2006 John Wiley & Sons, Inc.15-6 Material Requirements Planning Material requirements planning Planned order releases Work orders Purchase orders Rescheduling notices Item master file Product structure file Master production schedule

Copyright 2006 John Wiley & Sons, Inc.15-7 MRP Inputs and Outputs  Inputs Master production schedule Master production schedule Product structure file Product structure file Item master file Item master file  Outputs Planned order releases Planned order releases Work orders Work orders Purchase orders Purchase orders Rescheduling notices Rescheduling notices

Copyright 2006 John Wiley & Sons, Inc.15-8 Master Production Schedule  Drives MRP process with a schedule of finished products  Quantities represent production not demand  Quantities may consist of a combination of customer orders and demand forecasts  Quantities represent what needs to be produced, not what can be produced   Quantities represent end items that may or may not be finished products

Copyright 2006 John Wiley & Sons, Inc.15-9 Product Structure Tree Clipboard Level 0 Level 1 Level 2 Spring (1) Bottom Clip (1) Top Clip (1) Pivot (1) Rivets (2) Clip Ass’y (1) Pressboard (1)

Copyright 2006 John Wiley & Sons, Inc MRP Processes 1.Exploding the bill of material 2.Netting out inventory 3.Lot sizing 4.Time-phasing requirements

Copyright 2006 John Wiley & Sons, Inc CRP MRP planned order releases Routing file Capacity requirements planning Open orders file Load profile for each machine center

Copyright 2006 John Wiley & Sons, Inc Leveling Under-load Conditions 1.Acquire more work 2.Pull work ahead that is scheduled for later time periods 3.Reduce normal capacity

Copyright 2006 John Wiley & Sons, Inc Reducing Over-load Conditions   Eliminating unnecessary requirements   Rerouting jobs to alternative machines, workers, or work centers   Splitting lots between two or more machines   Increasing normal capacity   Subcontracting   Increasing efficiency of the operation   Pushing work back to later time periods   Revising master schedule

Copyright 2006 John Wiley & Sons, Inc Relaxing MRP Assumptions   Material is not always the most constraining resource   Lead times can vary   Not every transaction needs to be recorded   Shop floor may require a more sophisticated scheduling system   Scheduling in advance may not be appropriate for on-demand production.

Copyright 2006 John Wiley & Sons, Inc Enterprise Resource Planning (ERP)   Software that organizes and manages a company’s business processes by sharing information across functional areas integrating business processes facilitating customer interaction providing benefit to global companies