Detector studies, Radiation Simulations, Organization FCC Hadron Detector Meeting July 27 th 2015 W. Riegler.

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
LHeC - Detector Layout Tracker HCAL Solenoid Dipole Muon Detector Fwd Calorimeter Inserts Bwd Calorimeter Inserts p/A e∓e∓ EMC Dipole The Large Hadron.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Vyacheslav Klyukhin, SINP MSU The CMS Magnetic Field Map Aug 7, RDMSV. Klyukhin, SINP MSU1.
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
Zhiwen Zhao (UVa), Paul Reimer (ANL) SoLID Collboration Meeting 2013/03.
LCWS14 Benoit CURE - CERN/PH Dept.1 International Workshop on Future Linear Colliders October 2014 Organized by the Vinca Institute of Nuclear.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
ATLAS Inner Detector Magnetic Field I am responsible for providing the magnetic field map for the ATLAS Inner Detector.  6m long x 2m diameter cylindrical.
Aug/16/05 Su DongSiD Vertexing: Snowmass 05 SiD trk+vtx1 SiD VXD Geometry Update Su Dong SLAC.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
18/11/04DELPHI visits, PhC1 Visits to DELPHI/LHCb Ph.Charpentier.
ATLAS+ Design Concepts - FCC-hh detector magnet - Matthias Mentink Alexey Dudarev Helder Silva Leonardo Erik Gerritse Herman ten Kate FCC Detectors Workshop.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
Cost Issues Y.Sugimoto, A.Maki Estimation Procedure Get unit cost from the cost estimation for GLD(DOD) Estimate (relative) amount of return-yoke.
LHeC - Detector Layout Tracker HCAL Solenoid Dipole Muon Detector Fwd Calorimeter Inserts Bwd Calorimeter Inserts p/A e∓e∓ EMC Dipole Abstract The Large.
1 Muon Collider Backgrounds Steve Geer Fermilab Steve Geer MC Detector & Physics DOE June 24, 2009.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
Coil and HCAL Parameters for CLIC Solenoid and Hadron-calorimetry for a high energy LC Detector 15. December LAPP Christian Grefe CERN.
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
First CMS Results with LHC Beam
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
FCC-hh HCAL software goals Ana Henriques (thanks for Clement Helsens, Carlos Solans input)
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Jin Huang BNL/LANL. ePHENIX Review J. Huang 2 RICH GEM Station4 EMCal HCal GEM Station2 R (cm) HCal p/A EMCal GEMs EMCal & Preshower TPC DIRC η=+1 η=
Mokka simulation studies on the Very Forward Detector components at CLIC and ILC Eliza TEODORESCU (IFIN-HH) FCAL Collaboration Meeting Tel Aviv, October.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Francesco Cerutti ENERGY DEPOSITION ASPECTS FOR LHCb REQUEST 5th Joint HiLumi LHC - LARP Annual Meeting Oct 29, 2015 through L.S. Esposito’s work and essential.
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
MDI Simulations at SLAC Takashi Maruyama, Lew Keller, Thomas Markiewicz, Uli Wienands, SLAC MAP Collaboration Meeting, FNAL June 21, 2013.
Photon & e+e- Hits in Muon Higgs Factory T. Markiewicz T. Maruyama SLAC MAP Collaboration Meeting. Fermilab 29 May 2014.
FCC-ee Interaction Region design
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
Hcal Geometry and Assembly
CLAS12 Beamline Configurations
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
FCC-ee IR magnetic element design – an update
Energy deposition studies on magnets. Aim. First applications
Residual dose rates in the FCChh detector
Layout of Detectors for CLIC
SiD Solenoid Status and Plans
CLIC detector at SiD meeting 28/3/2010
Challenges for FCC-ee MDI mechanical design
Radiation Backgrounds in the ATLAS New Small Wheel
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Backgrounds using v7 Mask in 9 Si Layers at a Muon Higgs Factory
Sha Bai CEPC AP meeting Local double ring MDI Sha Bai CEPC AP meeting
Background Simulations at Fermilab
Presentation transcript:

Detector studies, Radiation Simulations, Organization FCC Hadron Detector Meeting July 27 th 2015 W. Riegler

FCC Week 2016 Rome, 11 – 15 April 2016

Document on physics at 100TeV. Including detailed characterization of benchmark channels. Detailed radiation simulations  detector technology discussion Detailed tracker studies Baseline magnet system(s) Detailed calorimeter studies … Goals for April 2016 FCC Week

Magnet Systems

Is a “Standalone Muon System” needed ? Very early LHC detector concepts were based on muon systems only. When trackers were included it was still far from clear whether a tracker close to the IP could survive the high rates and radiation load. The standalone muon system of ATLAS should guarantie that one is on the safe side if trackers ‘would go up in flames on first collisions’. CMS does very much rely on the tracker for the muon performance.

Magnet Systems For an FCC hadron detector by 2035, with tracker loads ‘only’ higher by a factor 2-10 with respect to HL-LHC there is no doubt that a tracker can be built that will perform well. We do not see the need for a ‘standalone muon concept’ for an FCC-hh detector. The muon performance can fully rely on the tracker. The ‘CMS like’ detectors with twin solenoid or partially shielded solenoid, together with forward dipoles, should therefore be defined as a baseline magnet system.

Coordinate System

!! Coordinate Systems !! Y ph X ph Z ph For the LHC detectors, a coordinate system is used where X points towards the inside of the Ring (0,0,0) nominal IP X ph … horizontal towards center of the ring Y ph … perpendicular to X ph and Y ph ‘up’ Z ph … along the beamline, righthanded system This system is different from the one used for beam optics studies as well as FUKA simulations, and in addition it is considered ‘unnatural’. We therefore adopt a different coordinate system for the FCC: FCC Detector Coordinate System: (0,0,0) nominal IP X ph … horizontal towards the outside of the ring Y ph … perpendicular to X ph and Y ph ‘up’ Z ph … clockwise along the beamline, righthanded system Center of the FCC ring

B Field Map

Magnetic Field H. Ten Kate, Matthias Mentink et al. et al. Provided a Field Map [x,0,14],[y,-14,14],[z,0,24]m on a Cartesian grid of 0.25m Y ph X ph Z ph

Magnetic Field Y ph X ph Z ph

Bz By Magnetic Field

Eta = 2.5 Magnetic Field Using this field map we can do semi-analytic studies on detector layout and performance needs in order to arrive at the nominal performance formulated in the DELPHES card.

Geometry for Radiation Calculations Past: Very simple estimates for tracker given (W. Riegler) First studies with detailed detector geometry and simplified B-field (C. Young et al.) Next: Detailed detector and magnet geometry with correct B-field. Simulations by Fluka team starting (M. I. Besana, F. Cerutti et al.)

Beampipe Central pipe: Cylinder Beryllium R in =2cm, R out =2.1cm From z=0 to z=800cm Forward beampipe: Beryllium 1mm wall thickness Projective cone (inner envelope) along 2.5mRad opening angle From z=800cm to z=32000cm Beampipe Connecting to TAS: From z=3200 to 3230cm – cone to go from R=8cm to R=1cm-2cm (matching TAS), Aluminum Between 3230cm and TAS – keep cylindrical beampipe, Aluminum Cylindrical shield around this beampipe will be necessary

Beampipe

Coils Coils: Pure Aluminum Z=1010cm, R=625cm Z=1010cm, R=782.5cm Z=760cm, R=1300cm Z=760cm, R=1347.5cm Next Page

R= *Z R= *Z Z=1480 Z=2098 X= *Z Rotation around z axis Parallelogram with a given thickness in Y direction Coils: Pure Aluminum

Sandwich total 110cm: 10cm Aluminum at 300K 62cm Calomix at 87K 38cm Aluminum at 300K Calomix in Volume (%): LArg 64.8%, Pb 21.7%, Cu 7.2%, Polystyrene 6.3% X 0 of this mix: 2.06cm It will be interesting to change this to W, Cu etc. and see the effect on neutrons and background … ECAL, Liquid Argon Eta 2.5=9.39 degrees Z=2400cm to z=2510m

Homegenous material 240cm R in = 360cm, R out = 600cm Material composition in Volume (%): 80% Fe, 20% Polystyrene λ of this mix = 20.5cm HCAL Eta 2.5=9.39 degrees Z=2510cm to z=2750m

Fill entire Volume between coils with Aluminum Since we aim for an air core muon system we assume 1X 0 of material in the 3.6m of space. Since Radiation length of Al is 9cm the Al density has to be scale down by a factor 40. Eta 2.5=9.39 degrees Muon Z=2750cm to z=3150cm

Material composition in Volume (%): Si 20%, C 42%, Cu 2%, Al 6%, Plastic 30% X 0 of this mix: 14.37cm We assume 3% of radiation length per layer, i.e. each layer has a thickness of 0.43cm. Tracker Eta 2.5=9.39 degrees

Z0=0Z3=800cm y2=240cm Z1=100cmZ2=300cm Y1=60cm y0=2.2cm IB ID OB OD Inner Barrel (IB) 8+1 Inner Disk (ID) 8 Outer Barrel (OB) 8 Outer Disk (OD) 10 Tracker

Inner Barrel: half length (cm), radius (cm) Inner Disks: z (cm), inner radius (cm), outer radius (cm) Outer Barrel: half length (cm), radius (cm) Outer Disks: z (cm), inner radius (cm), outer radius (cm) Tracker

Eta= Tracker

Eta= Tracker

6 discs from z=8m to z=15m with opening angle of eta=2.5. Eta 2.5=9.39 degrees Forward Tracker 6 discs from z=21m to z=24m with opening angle of eta=2.5.

Organization

There is quite some activity on FCC-hh physics and detector studies. There are quite a few groups doing detector R&D that is targeted towards application in future hadron colliders. We need to get some idea about ‘who does what’ in order to make consistent make consistent progress. The FCC management has put in place an MoU structure to have a formal agreement on FCC activities. MuOs are signed between the FCC management and the participating institutes. The institute representatives form the collaboration board (very similar to the present LHC experiment organization). For the machine studies this process is already very advanced, for the detector studies and physics studies we have to put this in place in the next months.  You will hear from us. Organization

Meetings We will try to set the dates for the next FCC hadron detector meetings and physics workshops be throughout the rest of the year a.s.a.p.