Application of the CMMI SM to Plan and Control Life Cycle Costs Dr. Mary Anne Herndon Science Applications International Corporation (SAIC) November, 2003.

Slides:



Advertisements
Similar presentations
IBM Corporate Environmental Affairs and Product Safety
Advertisements

Implementing CMMI® for Development Version 1.3
Copyright © 2003 by Cooliemon TM, LLC 1 Causal Analysis & Resolution (CAR) at Level 1 Presenter: Ralph Williams, President SEI Authorized CBA IPI Lead.
Global Congress Global Leadership Vision for Project Management.
Course: e-Governance Project Lifecycle Day 1
Capability Maturity Model Integration CMMI®
Team Software Process By: Bryan Peterson. Presentation Topics History Brief overview of the Team Software Process (TSP) TSP Team Launch Team-working Conclusion.
9 th Annual Public Health Finance Roundtable November 3, 2012 Boston, MA Peggy Honoré.
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
CMMI Overview Dr. Korson Software Engineering. 2 Immature organizations can be successful on occasion, but ultimately run into difficulties because –Success.
1 Presenter: Tracy Wessler June 6, 2007 Outsourcing Quality Assurance and Contract Surveillance Activities U.S. Census Bureau Decennial Response Integration.
Copyright 2003, ProcessVelocity, LLP. CMM and Capability Maturity Model are registered in the U.S. Patent and Trademark Office. CMMI and SCAMPI are service.
SM CMM Integration, SCAMPI, SCAMPI Lead Assessor, SCAMPI Lead Appraiser, and SEI are service marks of Carnegie Mellon University.  CMM and CMMI are registered.
Organizational Project Management Maturity Organizational Project Management Maturity Model (OPM3) PMI-MN Breakfast sessions Process Management.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
200209–CSSA0001 – 16/27/ :25 PM CSSA Cepeda Systems & Software Analysis, Inc. GENERIC.
1 Analytical Services, Inc. Huntsville, Alabama Jack Conway Vice President Systems Management CMMI Pilot Project Coordinator.
Organizational Project Management Maturity: Roadmap to Success
Capability Maturity Model Integration (CMMI) COMP Group Assignment #1 Ario Nejad, Davit Stepanyan, Ian Jackman, Sebastian Henneberg, Wan Chi Chio.
CMMI December 3rd 2014.
Space and Airborne Systems NDIA/SEI CMMI Technology Conference Presented by N. Fleischer 1 Raytheon’s Six Sigma Process and Its Application for CMMI By.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
CMMI Course Summary CMMI course Module 9..
Copyright © 2009, Systems and Software Consortium, Inc. Introduction to an Integrated Lean Thinking, Six Sigma  and CMMI  Approach for Process Improvement.
8. CMMI Standards and Certifications
COMPANY CONFIDENTIAL Page 1 Final Findings Briefing Client ABC Ltd CMMI (SW) – Ver 1.2 Staged Representation Conducted by: QAI India SM - CMMI is a service.
Applying CMMI® Generic Practices with Good Judgment
© 2001 Carnegie Mellon University S8A-1 OCTAVE SM Process 8 Develop Protection Strategy Workshop A: Protection Strategy Development Software Engineering.
Michael Dermody September 2010  Capability Maturity Model Integration ◦ Is a Trademark owned by the Software Engineering Institute (SEI) of Carnegie.
A Project ’ s Tale: Transitioning From SW-CMM to CMMI-SE/SW Warren Scheinin Systems Engineer, NG Mission Systems CMMI Technology Conference & User Group.
CMS 00_ Copyright 2002 Raytheon Company All Rights Reserved CMMI – What a Difference a Sponsor Makes! Ann Turner Raytheon Company
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
DRAFT – For Discussion Only HHSC IT Governance Executive Briefing Materials DRAFT April 2013.
EngMat/JWS.PPT 10/17/ CMMI ® Today – The Current State CMMI ® Technology Conference 2003 November 18, 2003 Ron Paulson Vice President, Engineering.
Software process improvement Framework for SPI SPI support groups, maturity and immaturity models Assessment and gap analysis Education and training Selection.
Montgomery County, Maryland DTS CMMI Approach & Implementation Mike Knuppel 03/20/2006.
Managing CMMI® as a Project
1 © Mahindra Satyam 2009 Mahindra Satyam Confidential Welcome To CMMI Introduction.
1 通信软件开发与管理 Course OD601 学时: 32 学分: 2 讲师:罗文彬. 2 Communication Overview System Architecture Overview Performance and Reliability Operation, Administration,
“CBA IPI® vs. SCAMPISM Appraisal Methods: Key Differences”
3 rd Annual CMMI ® Technology Conference and User Group Dave Castellano US Army Representative to CMMI Steering Group 4 August 2003 US Army Armaments Research.
1 Implementing A PMO & Enterprise Project Management at NIH February 3, 2005 Bill Vesey, PMP Manager EPM Consulting Practice Forte Systems, Inc General.
SWEN 5130 Requirements Engineering 1 Dr Jim Helm SWEN 5130 Requirements Engineering Requirements Management Under the CMM.
 Copyright ProcessVelocity, LLP Slides intended for informational purposes only. CMM and Capability Maturity Model are registered in the U.S. Patent.
January 2003 CMMI ® CMMI ® V1.1 Tutorial Sponsored by the U.S. Department of Defense © 2003 by Carnegie Mellon University SM CMM Integration and SCAMPI.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
CMMI November 25 th Copyright © 2015 Accenture All rights reserved. The aim of the presentation is to introduce Capability Maturity Model Integrated.
A Process Improvement Plan for a High Maturity (and Diverse) Organization Alan Pflugrad Northrop Grumman Information Technology Defense Enterprise Solutions.
Pittsburgh, PA CMMI Acquisition Module - Page M5-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This.
Copyright © by Quality Improvement Consultants, Inc. (QIC) Slide 1 World-Class Quality Measurably Improving Your Requirements Based on the CMMI.
© | Hansan Global | All Rights Reserved 1 INTRODUCTION TO IT SERVICE MANAGEMENT Hansan Global Pte Ltd.
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
NIH Change Management Program Change Management Program Overview March 8,
Introduction to Project Management Project management.
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
EITS Planning & Decision Support
Process Maturity Profile
Presented To: 3rd Annual CMMI Technology Conference and User Group
CMMI November 22nd 2017.
The Journey to CMMI Level 4
By Jeff Burklo, Director
CMMI November 2018.
Software Engineering: A Practitioner’s Approach, 6/e Chapter 2 Process: A Generic View copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc.
Experiences with a Single PA SCAMPIsm
Use of CMMI in an Acquisition Context Using CMMI for Process Improvement at USAF Space and Missile Systems Center (SMC) Dr. Jack R. Ferguson
Small Organizations are Different?
Process Improvements Achieved From Using The CMMI Model: A Success Story At Raytheon’s SAS Engineering Organization Presented to National Defense Industrial.
Acknowledgment of achievement
Presentation transcript:

Application of the CMMI SM to Plan and Control Life Cycle Costs Dr. Mary Anne Herndon Science Applications International Corporation (SAIC) November, 2003  CMM, Capability Maturity Model, and Capability Maturity Modeling are registered in the U.S. Patent and Trademark Office. SM CMMI is a service mark of Carnegie Mellon University. SM SCAMPI is a service mark of Carnegie Mellon University.

2 Introduction 1.Agility to successfully respond to rapidly changing business environments and customer priorities is critical to long term survivability. 2.Infrastructure support is expected to provide more services while minimizing costs over the life cycle of technology programs. 3.Planning and controlling life cycle costs needs to focus on implementing capable/mature processes for the infrastructure support services as well as the technology programs. 4.Application of the CMMI model practices and SCAMPI SM appraisal methods provide a common framework to achieve capability and maturity in both the technology programs and infrastructure support functions. FY 08 Your Life Cycle Cost Planners Your Competition

3 Challenges in Planning & Controlling Life Cycle Costs Infrastructure SupportSE/SI/SW Technology Contract Administration 1.Finance 2.Contracts 3.HR 4.Security Service/Product Implementation 1.Culture Sustainment 2.Dynamic Service Levels 3.Emerging Technologies 4.Changes in Competition FY 05 FY 06 FY 07

4 Perpetuating Stovepipes: Organizational Process Improvement - Parallel Strategies - Finance Contracts Security HR Six Sigma Balanced Scorecard Lean, ISO Technology Programs Software System Engineering CMMI S/W CMM EIA 731, ISO Six Sigma Enterprise ROI ? Infrastructure Services

5 Organizational Process Improvement Via CMMI Technology Projects Software System Engineering Systems Integration CMMI Model Practices are: Infrastructure Projects Finance Contracts Security HR Applicable to product/services domains Most frequently applied in organizations to implement process improvement in technology projects Infrequently applied to improve infrastructure support services (paradoxical as support services are permanent but increasing cost components over the life cycle) Enterprise model (top down) Common set of good management practices Standard appraisal method Integration of process improvement initiatives

6 Process Improvement Investment Strategy “ Applying the CMMI Across the Enterprise” CMMI Implementing CMMI model practices across both infrastructure support services and technology domains integrates process improvement into the Enterprise using a common set of good management practices and appraisal method. HR Contracts Line Structure Technology Projects Finance Safety Security Business Development

7 CMMI Model Applications to Planning & Controlling Life Cycle Costs Infrastructure Support Services Contract Administration 1.Finance 2.Contracts 3.HR 4.Security SE/SI/SW Technology Service/Product Implementation 1.Sustainment 2.Dynamic Service levels 3.Emerging Technologies 4.Changes in Competition Project Planning & Monitoring & Control Process & Product Quality Assurance Risk Management Measurement & Analysis PPPMC RSKM M&A PPQA CMMI Practices Are Applicable to Service Organizations

8 Implementing Planning and Controlling Future Life Cycle Costs Infrastructure Projects Finance Contracts Security HR Focus on building process improvement equity in infrastructure support services & technology projects using CMMI and SCAMPI. Technology projects are transient – infrastructure support services are not. Set process performance goals for infrastructure support services. Use practices in higher capability PAs to implement processes to stabilize and predict cost performance. Predictive infrastructure services processes are important tools in planning and controlling future life cycle costs. Predictive infrastructure processes

9 Integrating Process Improvement Initiatives Technology Projects Software System Engineering Systems Integration Infrastructure Projects Finance Contracts Security HR Enterprise Process Improvement Team Prioritize and select “projects” based upon business goals ( e.g. minimizing and predicting support infrastructure life cycle costs). Define charter for Enterprise Process Improvement team and select members. Develop and staff CMMI implementation project. Assess process improvement progress (SCAMPI).

10 Implementation Tips in Applying CMMI Practices to Infrastructure Support Services Recognize that infrastructure services are PROJECTS with: requirements, schedules, resources, measurements and risks and need appropriate levels of QA, CM, training and stakeholder involvement. Plan infrastructure process improvement projects in parallel with technology projects. Provide CMMI training to infrastructure support teams. Include experts in infrastructure support functions on SCAMPI teams Implementation TipsCMMI PAs 1. Projectize infrastructure functions. Collect, analyze and manage requirements. PP, PMC, IPM, PPQA, CM, RD, REQM 2. Develop/implement measurements. M&A 3. Develop/integrate risk management. RSKM 4. Appraise infrastructure or enterprise progress using SCAMPI methods OPF

11 Annual Plan PP, PMC, IPM Corporate Homepages Budget built from estimates Process Flows Training Program Overview Presentations ISG Process Guidance Effort, Cost Plan for Training Lifecycle, Stakeholders, Schedule, Etc. Scope, Resources Scope, Resources, Training Needs Communicate Plan Process Guidance Process Flows Participating infrastructure support organizations 1. Implementing Project Planning (PP) and Monitoring and Control (PMC), Integrated Management (IPM) Process Areas REVIEWS/AUDITS CFI A-9 Head Count AAP T&M Certs PPQA Items Baseline Releases Change control Audits Stop Light Report provides a “health check” by integrating the results of all the functional area audits and reviews REQUIREMENTS Planning Guidance Revenue Profits Legal CM REQM & RM

12 Annual Plan Requirements Management Corporate Homepages FA Process Flows 3-Year Strategic Plan ISG Requirements Stakeholders Policies include Reqs Manage Reqs FA Requirements Stakeholders Work Plans Requirements Baseline Manage Changes Inconsistencies Identified Commitment Work Plans Management Annual Planning Guidance Corporate Requirements Stakeholders Mid-year Plan ISG Process Guidance Group Guidance Requirements Baseline Manage Changes Business Planning Process (PC Plan) Corporate Homepages (CFIs) Business Plan Performance Tracking (CFI A-9) Mid-year Forecast Corporate Infrastructure Managers REPORTS Finance Head Count T&M Certs REVIEWS/AUDITS CFI A-9 Head Count AAP T&M Certs Dash Board Analysis 2. Implementing Measurement & Analysis (M&A) PA. Thresholds

13 Annual Plan Requirements Management Corporate Homepages 3-Year Strategic Plan ISG Requirements Stakeholders FA Requirements Stakeholders Work Plans Requirements Baseline Manage Changes Inconsistencies Identified Commitment Work Plans Management Annual Planning Guidance Corporate Requirements Stakeholders Mid-year Plan ISG Process Guidance Group Guidance Requirements Baseline Manage Changes Business Planning Process Corporate Homepages Business Plan Performance Tracking Mid-year Planning Process Corporate Formal risk tracking Formal risk tracking Infrastructure Managers Formal risk identification Finance Contracts HR 3. Implementing the Risk Management (RSKM) Process Area REPORTS Finance Head Count AAP T&M Certs Risks & Probability QRAM Security

14 4. Implementing Organizational Process Focus (OPF) Process Area. Proxy: Technology Projects SCAMPI Appraisal Team Proxy: Infrastructure Projects Artifacts SCAMPI Benchmark OPF

15 Progress To-Date Leveraged Technology S/W CMM ML 3 July 2002 Infrastructure & Technology Class C Appraisals Feb 2003 April 2003 TBD Dec 2002 SE/SI Services contract CMMI ML 2 Class A CL 3 PP, PMC, M&A, PPQA, IPM, RSKM, CM, RM,SAM Class B Appraisal July 2003 Organization Class A CMMI ML 3 Appraisal Sept 2003 Proxy: Technology Projects Infrastructure Projects

16 Summary Infrastructure support services and technology projects are BOTH necessary components of life cycle costs to predict and control. Infrastructure support services are permanent residents while any specific technology program is transient. Implementing CMMI model practices across the organization provides a common framework to preserve and build upon process improvement equity. The SCAMPI appraisal method provides a common method to measure the Enterprise’s progress in meeting process improvement goals.