1 Market Trials Open Market Participant Call Weekly Kick Off Sept 27, 2010.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update March 4, 2010.
Advertisements

1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Aug 08, 2008.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 16, 2010.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
1 Nodal Stabilization Market Call December 28, 2010.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
1 Cutover Daily Call 4:30 PM November 23, :30.
1 Market Trials Outage Scheduling Qualifications Weekly Update April 02, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
1 COMS/Settlements/Credit Weekly Update June 11, 2010.
1 Market Trials Outage Scheduling Weekly Update July 09, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
1 Nodal Stabilization Market Call December 14, 2010.
1 Nodal Stabilization Market Call December 21, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off October 04, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates April 18, 2008.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
1 Market Trials Outage Scheduling Weekly Update June 25, 2010.
1 Cutover Market Call December 01, :30 AM.
1 Nodal Stabilization Market Call December 06, :30 AM.
1 Market Trials Real-Time Market / LFC Weekly Update April 9, 2010.
1 Market Trials Real-Time Market / LFC Weekly Update April 16, 2010.
1 Market Trials Outage Scheduling Weekly Update July 02, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update May 6, 2010.
1 Cutover Market Call November 29, :00 AM.
1 TSP Nodal Engagement Market Participant Call ERCOT September 15, 2010.
MISUG Meeting Materials Jackie Ashbaugh/Jamie Lavas ERCOT 2/22/2011.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
1 Market Trials Outage Scheduling Weekly Update June 11, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 16, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates Feb 01, 2008.
MISUG Meeting Materials Jackie Ashbaugh/Jamie Lavas ERCOT 1/13/2011.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 02, 2007.
1 Nodal Credit Update at WMS June 16, 2010.
1 Market Trials Update NATF May 4, 2010.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 19, 2009.
14 Minute Ramp Period Testing Workshop June 30, 2009.
1 Nodal Stabilization Market Call December 03, :30 PM.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
1 Cutover Market Call November 27, 2010.
1 Nodal Stabilization Market Call December 27, 2010.
1 Cutover Daily Call 10:30 AM November 23, :30.
1 Market Trials DAM/RUC/SASM Weekly Update March 19, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off May 10, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update May 28, 2010.
1 Market Trials Real-Time Market / LFC Weekly Update April 30, 2010.
1 Nodal Stabilization Market Call December 16, 2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Oct 24, 2008.
1 Market Trials Real-Time Market / LFC Weekly Update May 21, 2010.
1 Market Trials Real-Time Market / LFC Weekly Update March 26, 2010.
1 Cutover Market Call November 28, 2010.
1 Nodal Stabilization Market Call December 02, :30 PM.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 26, 2010.
1 Market Trials Update NATF January 5, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates June 06, 2008.
1 Market Trials Real-Time Market / LFC Weekly Update August 27, 2010.
Market Trials Update NATF March 2,
Market Trials Open Market Participant Call
Cutover Market Call November 29, :30 PM
EDS 3 Release 5 and 6 Friday Market Updates Sept 05, 2008
EDS 3 Release 5 and 6 Friday Market Updates Sept 19, 2008
Market Trials Open Market Participant Call
Market Trials Open Market Participant Call
Presentation transcript:

1 Market Trials Open Market Participant Call Weekly Kick Off Sept 27, 2010

2 Antitrust Admonition ANTITRUST ADMONITION ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate the antitrust laws. The ERCOT Board has approved guidelines for members of ERCOT Committees, Subcommittees and Working Groups to be reviewed and followed by each Market Participant attending ERCOT meetings. If you have not received a copy of these Guidelines, copies are available at the Client Relations desk. Please remember your ongoing obligation to comply with all applicable laws, including the antitrust laws. DISCLAIMER All presentations and materials submitted by Market Participants or any other Entity to ERCOT staff for this meeting are received and posted with the acknowledgement that the information will be considered public in accordance with the ERCOT Websites Content Management Operating Procedure.

3 This Week’s Activities RTM / LFC –Submit Energy Offer Curves representative of a post go-Live scenario –Full System Market and Reliability Test will begin on 9/29/2010 8am and end 9/30/2010 8pm Note that ERCOT Grid Operations may change testing times due to system conditions at any time This test will be 36 hours total Market Notice will confirm test go ahead 2 hours prior to test start Note that this test will include a Network Model load at midnight on 9/30/2010 If there are updates to your contacts (especially during the overnight hours, please send those to DAM / RUC –DAM, HRUC and DRUC will continue through 9/30 (last operating day 10/1/2010) –COPs should continue to be updated based on actual resource status plans (including updates intra day) Exception to Load resources noted on next slide –System Wide Offer Cap will remain at max $180 (or 18 times FIP) –System Wide Offer Floor will remain at -$50 CRR –09/27/2010: October Monthly Auction Results Posted –09/28/2010: October Monthly Auction Invoice to be distributed Outage Scheduler –Maintain outages for remainder of September and post Go-Live –Those who have not sent in confirmation of post Go-Live verification and synchronization, please continue to work on this

Load Resources Deployment Scenario 4 Test Results Test #1 – 55 Load Resources with test deployments of 316 MW Test #2 – 94 Load Resources with test deployments of 852 MW Issue identified when Group 2 LRs are deployed. A recall message of 0 MWs is sent to Group 1 LRs. Until the issue is corrected, ERCOT will deploy Group 1 and Group 2 LRs together, so that no inadvertent 0 MW recall messages are sent to Market Participants. Reminders/Updates Next test – Monday 9/27 and Tuesday 9/28. This is an open-loop test. There will be no shedding of actual Load. Test Overview Day 1 – Monday 9/27 QSEs update their Load Resource COPs to reflect self arranged schedules and awards from DAM prior to DRUC (DRUC starts at 1430) After DRUC completes, ERCOT creates Group 1 & Group 2 deployment stacks and publishes the report to the MIS Secure Area Day 2 – Tuesday 9/ Test begins and ERCOT conducts a hotline call Group 1 deployed with end time of 11: Group 2 deployed with end time of 11: QSEs adjust their telemetered RRS Schedules ERCOT recalls the deployment ERCOT issues a VDI to confirm schedules have been adjusted to return to service.

5 This Week’s Settlements Postings This is the last week that Settlements Statements, Invoices and Extracts will be posted

6 Known Issues Recently Opened Known Issues Non-Spin Deployments- The Operator display that is used to deploy non-spin does not consider the COP responsibilities from all possible Combined Cycle configurations that will be operating in the next operating hour NP6-905-CD, Settlement Point Prices at Resource Nodes, Hubs and Load Zones (MIS Public) Report is not being posted when SCED does not run, although SPP reports are generated in MMS every 15 minutes whether or not SCED runs Requires modification of event trigger that generates the report Affects CDR Modifying Telemetry Reports to reflect new TAC-approved Telemetry Standard NP8-146-ER Critically Important Telemetry Availability Report NP8-365-ER Monthly Telemetry Point Availability Statistics Report NP8-475-ER Quarterly Telemetry Point Availability Statistics Report NP3-129-CD: Daily Competitive Constraints (MIS Secure) Competitive Constraints reports pulled from EWS are not pulling the Contingency Name file, causing some of the report data to look like duplicates

7 Known Issues Recently Closed Known Issues NP6-788 LMPs by Resource Nodes, Load Zones and Trading Hubs SCED timestamp was previously not being included for the retry reports Affected CDR MIS Data Classification on Portlet banners The data classification for the Portlet banners on MIS was not previously being included on all landing pages Affected the Portal Builder LMP and SPP Reports The retry reports for LMPs/SPPs was not previously producing postings for the correct missed intervals Affected CDR NP4-731-SG: Wind Generation Resource Power Potential Forecast (MIS Certified Report)- The “Resource” column was previously being populated with a site-level name attribute rather than a unit-level name Affected the AWS application

8 Known Issues Recently Closed Known Issues NP3-129-CD: Daily Competitive Constraints Duplicate records were previously being passed to the DCC report from the monthly CCT file that is used to build the report. Duplicates were identified in some of the July and August 2010 reports. A uniqeness check has been built into the process that grooms the monthly file, so no duplicates should be seen in the Daily Competitive Constraints file starting September 4, 2010 moving forward. Change of LDL calculation in RLC There was previously an issue that was observed during the LFC test on 8/20/2010 in which an ICCP error caused HSL to be set equal to LSL for a majority of a QSEs Resources, resulting in Base Points that ignored the ramp rates for the resources. To resolve this issues, ERCOT wrote an NPRR to remove some of the protocol language that was added as part of the NPRR 119 to allow changes in LDL calculation that will result in Resources always being sent Base Points that will ramp them to their HSL when it changes rather than setting the Base Points equal to the new HSL. Affected EMS RLC

Standing Reports and Updates: General Reminders / Updates 9 Reminders/Updates Updates to Tracking Artifacts The updated Known Issues tracking sheet is available on the Readiness center at

10 State Estimator Convergence Update State Estimator Daily Convergence Statistics (these percentages are graphed in the next slide) MonthDay% Convergence (Including Solved w/ Mismatch) SEPT % SEPT % SEPT % SEPT % SEPT % SEPT % SEPT % SEPT % SEPT % SEPT % SEPT %

11 State Estimator Convergence Update