Children’s Hospital of Pittsburgh’s Clinical Services Building Pittsburgh, PA Final Thesis Presentation Gloria Brashear Construction Management Option.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

REVOLUTIONARY BUILDING SYSTEM TM. TIMECOSTENERGY THE PROBLEM A NEED FOR INNOVATION.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
The Pennsylvania State University Department of Architectural Engineering Harrisburg University Academic Center Laurel Heather Warner Construction Management.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Houston Independent School District James A. Berry Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS Berry Elementary is an environmental sciences magnet.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
What is Thermal Bridging? A reduction of the effectiveness of insulation to reduce conductive heat flow through the building envelope otherwise know as.
North Pocono High School
Fisk Corporate Headquarters Houston, Texas Penn State AE Senior Capstone Project Stephen Blanchard – Construction Management Option Advisor: Dr. John Messner.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Presented By: Derek Snover Construction Management.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Paul Roberts Senior Thesis 2010 Construction Management.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
DEREK BAUER CONSTRUCTION MANAGEMENT AE SENIOR THESIS 2008 PENN STATE UNIVERSITY AE SENIOR THESIS PRESENTATION APRIL 15, 2008 OFFICE/RETAIL BUILDING WASHINGTON,
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Senior Thesis Presentation 2009 The Pennsylvania State University.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
© 2011 Autodesk Optimize Model Performance by Using Worksets in Autodesk® Revit® 2012 Pedro Rivera Mechanical Designer/BIM Coordinator, RLF.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
Taylor Hall George Mason University Fairfax, VA Advisor: Ed Gannon Introduction Prevention through Design Façade Re-design for PtD Stick-Built vs. Infinity.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
High Performance? “Greening” “Energy Efficient”
Pearl Condominiums Philadelphia, PA
SCHOOL OF FOREST RESOURCES BUILDING
David Anderson Mechanical Option
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Introduction James W. & Frances G. McGlothlin Medical Education Center
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Presentation transcript:

Children’s Hospital of Pittsburgh’s Clinical Services Building Pittsburgh, PA Final Thesis Presentation Gloria Brashear Construction Management Option Advisor: Professor Horman PLEASE SILENCE ALL CELL PHONES! THANK YOU! PLEASE SILENCE ALL CELL PHONES! THANK YOU!

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University - 900,000 SF hospital - 6th floor atrium and rooftop garden - vibrant use of colors on the interior and exterior - family, healing, sustainability, and state-of-the-art technology - 40% of the total construction is renovations to a previously existing hospital. Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling for General Contractors Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Video Courtesy of Astorino

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling for General Contractors Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Existing Building New Construction

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling for General Contractors Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Owner : University of Pittsburgh General Contractor : Barton Malow – P.J. Dick, A Joint Venture Architect & Engineer : Astorino Construction Manager: Dick Corp. Owner Rep : Oxford Development Co. BMPJD Notice of Award Award Packages Steel Erection Coordination Drawings Interior Demolition (Old Building) Plumbing Major Material Deliveries Telecommunications Construction Risers Mechanical Electrical Exterior Studs and Sheathing Roofing Vendor Selection Elevators Windows Doors Punchlist Helipad Full Enclosure Project Completion Substantial Completion Commission Testing Installation Owner Deliver Medical Equipment 0 days 37 days 166 days 179 days 25 days 251 days 136 days 556 days 134 days 194 days 229 days 126 days 250 days 234 days 475 days 147 days 208 days 373 days 57 days 0 days 15 days 9 days 36 days 0 days PROJECT SCHEDULE

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling for General Contractors Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions BMPJD Notice of Award Award Packages Steel Erection Coordination Drawings Interior Demolition (Old Building) Plumbing Major Material Deliveries Telecommunications Construction Risers Mechanical Electrical Exterior Studs and Sheathing Roofing Vendor Selection Elevators Windows Doors Punchlist Helipad Full Enclosure Project Completion Substantial Completion Commission Testing Installation Owner Deliver Medical Equipment 0 days 37 days 166 days 179 days 25 days 251 days 136 days 556 days 134 days 194 days 229 days 126 days 250 days 234 days 475 days 147 days 208 days 373 days 57 days 0 days 15 days 9 days 36 days 0 days PROJECT SCHEDULE - Telecommunications contractor and Steel contractor picked prior to General Contractor - Trades work through the building in a spiral effect - Overlap of trades due to continual work flow - Very complex schedule by floor and quad - Start Date: 12/22/05 - Projected Completion Date: 12/22/08 0 days

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of LEED™ - Pittsburgh General Contractor Survey - LEED™ Submittals in Specifications - LEED™ Submittal form "The frog does not drink up the pond in which it lives." - Chinese Proverb - Green building popularity increasing, public has a vested interest - Clinical Services Building designed to meet the LEED™ New Construction v Save 90¢ /sq. ft. annually - Energy and other costs earn back investment in 2 – 2 ½ yrs. - Certification process now 100% online - Availability of online sample submission forms

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of LEED™ - Pittsburgh General Contractor Survey - LEED™ Submittals in Specifications - LEED™ Submittal form 1.Familiarity of Contractors: Familiarity of Subcontractors: 4-5, MEP higher 3.Helpfulness and Familiarity of Architects: 6-7, large firms higher 4.Number of Green and LEED™ Projects Worked On: Most Difficult Credits: FSC chain of custody, harvest location, HVAC, commissioning, and materials/resources 6.Most Difficult Aspects of LEED™: drywall recycling, education of the masses, inclusion in the bidding process, structure or defined steps 7.Client's Eagerness to Implement LEED™: poor perception of cost, do not know all it entails 8.LEED in Construction Documents: need better definition

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of LEED™ - Pittsburgh General Contractor Survey - LEED™ Submittals in Specifications - LEED™ Submittal form Addendum to Specifications Section 05310: 1.02 SUBMITTALS Add: " F. LEED™ Submittal form for each specific material. 1. MR 3.1: List of proposed materials salvaged, reused, or refurbished a. Identify material cost. 2. MR 4.1 and 4.2: List of proposed materials with recycled content. a. Indicate cost, post-consumer recycled content, and post- industrial recycled content for each product having recycled content. 3. MR 5.1 and 5.2: List of proposed regionally manufactured materials and regionally extracted, harvested, or recovered materials. a. Identify each regionally manufactured material, its source, and cost. b. Identify each regionally extracted, harvested or recovered material, its source, and cost. "

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of LEED™ - Pittsburgh General Contractor Survey - LEED™ Submittals in Specifications - LEED™ Submittal form

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of Virtual Modeling - Interview with MIS Project Leader with P.J. Dick, Inc. - Software Review - Research of BIM Consultants "“If a picture contains one thousand words... A model contains one thousand pictures” - Edward McCracken (former CEO – SGI) - 25 yr. old idea in the making - Automobile and airline manufacturing industries adopted virtual modeling successfully - Acceptance, compatibility, and perhaps contractual reliability and responsibility essential for success - Compatibility of software - Owners do not understand investment and commitment - Industry-wide standards in the works with National Institute of Building Sciences.

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of Virtual Modeling - Interview with MIS Project Leader with P.J. Dick, Inc. - Software Review - Research of BIM Consultants ProjectModel TypeMan HoursCompleted By Office3D545In House Research5D480Out Sourced - Modeling not used on Clinical Services Building - Decide what general contractor wants with model - Quality and reliability of the work product outweigh the additional cost of out sourcing

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of Virtual Modeling - Interview with MIS Project Leader with P.J. Dick, Inc. - Software Review - Research of BIM Consultants Vico vs. Autodesk Constructor vs. Revit Architecture

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of Virtual Modeling - Interview with MIS Project Leader with P.J. Dick, Inc. - Software Review - Research of BIM Consultants Vico vs. Autodesk Constructor vs. Revit Architecture

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of Virtual Modeling - Interview with MIS Project Leader with P.J. Dick, Inc. - Software Review - Research of BIM Consultants Vico vs. Autodesk Constructor vs. Revit Architecture

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions - Research of Virtual Modeling - Interview with MIS Project Leader with P.J. Dick, Inc. - Software Review - Research of BIM Consultants BIM Consultants - Combine multiple fields of work - Devote proper time required - Reduce cost and coordination issues - Improve construction inefficiencies - Improve schedule and trade coordination - Benefits outweigh cost

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Background: - Existing hood system outdated - Manufacturer out of business - Owner wants to salvage existing equipment Problem: - Existing system and proposed system non- compatible - Initial cost increase with change in scope of work - Schedule delays increasing

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Proposal: - Fully functioning kitchen hood system - New hood and ductwork Model "CG3-BDL" Water Wash Ventilator

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Existing Scope of Work:Proposed Revision to Scope of Work:

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Minimum separation distance between building and exhaust is 1/2 of L.: L = 0.09 √Q (√DF - U/400) Q= exhaust air volume, 250 cfm per million BTU/h (per Appendix F3) DF = dilution factor, 15 (per Table F.2) U= 0 L = 43.8 ft. 1/2L = 21.9 ft. OK! 18, friction per 100 ft of duct = 60x24 Attempts to reduce size failed MaterialExhaust: Low RoofExhaust: 5 th Floor Duct Insulation $15,617.56$9, Ducts $76,020.14$43, Louver $ Fan $2, Exhaust Hood $61, DAYS: 5232 TOTAL: $156,552.70$118, SAVINGS on material: $38, SAVINGS on schedule: 20 days

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Background: - Topping showing visible fatigue between col. line K-P and Form deck corrosion Problem: - Mechanical and electrical penetrations causing corrosion - All penetrations should be seen as potential hazards

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Proposal: - Ensure longevity of aesthetics and structural integrity - New form deck

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Form Deck & Slab for Typical Bay Infill 7' O.C. Needed: 5" thick slab, 2" deck, 3" lightweight concrete Loading: Live Loads: Lab/Ward: 80psf Dead Loads: Deck: 3 psf Concrete: 115 pcf x 3 in slab = 28.75psf Superimposed: 15 psf W = 1.4 (3psf psf + 15 psf) (80psf) W = psf United Steel Deck: concrete slabs on UF2X form deck, 24 GA, 5” 7’ spans 4x4 – W2.9 x 2.9 mesh, Uniform Total Load = 212 psf psf < 212psf - OK! UF2X form deck 24 GA, 5” 7’ spans 4x4 – W2.9 x 2.9 mesh United Steel Deck, Inc.

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions MaterialImpact Edge Forms $6, WWF $483, Concrete $108, Placing Concrete $28, Finishing $62, Form Decking $187, DAYS: 32 days/floor TOTAL: $877, Proposed cost compared with life cycle - Original built in Less than 37 years later showed signs of fatigue -Additional MEP penetrations increase need - Structural integrity and future aesthetics guaranteed

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions Conclusion: Research 1: LEED Process: Change in submittals would close the information gap between subcontractors and architects Research 2: Virtual Modeling: Outsourcing most beneficial option, if in- house use of Vico software proves most user-friendly Breadth 1: Mechanical: Re-routing ductwork reduces cost by $38, and saves 20 days Breadth 2: Structural: Structural improvements increase building life cycle which outweighs cost of construction adding 32 days to the schedule for each floor

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions I would like to thank the following companies for their assistance with my senior thesis: - Astorino Architect & Engineers - Barton Malow – P.J. Dick, A Joint Venture - Brashear Construction Consulting, Inc. - Jendoco Construction Corporation - Mascaro Construction Company, LP - Massaro Corporation - Oxford Development Company - University of Pittsburgh Medical Center I would also like to thank the following people for their support and guidance throughout my time at Penn State: - Family and friends (the ones at home in Pittsburgh, and the ones that are here making State College my second home) - Fellow AE students - Penn State AE Faculty and Staff

Children’s Hospital of Pittsburgh Clinical Services Building Gloria S. Brashear Construction Management Option Department of Architectural Engineering The Pennsylvania State University Project Overview Research 1: LEED Documentation Process for General Contractors Research 2: Virtual Modeling Breadth 1: Mechanical Breadth 2: Structural Acknowledgements Comments & Questions