NRL/VXS-1 2009 UPDATE.

Slides:



Advertisements
Similar presentations
© Copyright 2010, Optech Incorporated. All rights reserved. E&OE.
Advertisements

Firebird: Multi-INT ISR
ODS3F –Observation and Detection Systems For Forest Fire Monitoring
Heavy Lift and Long Duration Co-axial Unmanned Aerial Vehicles
Illinois Space Society Tech Team USLI CDR Presentation.
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
October 28, 2011 Christopher Schumacher (Team Lead) Brian Douglas Christopher Erickson Brad Lester Nathan Love Patrick Mischke Traci Moe Vince Zander.
Vertical Launch UAV Project Plan. ∞ Construct an unmanned aerial vehicle (UAV) with a camera payload ∞ UAV must autonomously navigate with real-time video.
GPS Vehicle Tracking/Payload Release System For Small UAV Project Team
Range (nm) Payload (kg) Payload (lb) Endurance (hr) As a total system, Vigilante.
From design… …development… … CFD analyses…
Oculus Superne. 2 System Definition Review Mission Objectives Concept of Operations Aircraft Concept Selection Payload Constraint Analysis and Diagrams.
PROPRIETARY – COMPETITION SENSITIVE 2 Company Background and Capabilities Concept Scheme/Highlights Minifalcon-UAS & ASIS Overview Presentation Outline.
Oculus Superne 1 1.) Introduction 2.) Mission & Market 3.) Operations
AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.
Wind Turbine Energy Conversion System Design and Integration Advisor: Venkataramana Ajjarapu 2009 Project Team Elsammani Ahmed Hassan Burawi Brandon JanssenLuke.
Data Processing Equipment
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
UAV Helicopter Project 12-May-08 Presented by Mark Diel Whirled Air Incorporated Stanford University.
Flight Readiness Review Atomic Aggies. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Field Operations Resource Guide For Emergency Managers 1.
Aircraft Recognition Lecture Leading Cadet Training Airmanship 2 5.
The program work breakdown structure (WBS) establishes the essential
Illinois Space Society Tech Team USLI FRR Presentation.
1 1 64th Interdepartmental Hurricane Conference Jim McFadden, Nancy Ash, Jack Parrish and Paul Flaherty NOAA Aircraft Operations Center Jim McFadden, Nancy.
EVENLODE Air Equipment EVENLODE Power Supply, Heat Exchange & Power Amplifier EVENLODE Video Encoder, Transceiver & Up Converter.
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
NOAA Airborne Platforms n Mission Related – All NOAA airborne platforms perform some type of dedicated task defined by NOAAs mission n Not for General.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Large Crowd Surveillance UAV
Honeywell Helicopter RMUs
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Ken Moritz and Bo Goode NAVAIR PMA January 2004 V-22 International NAVY-INDUSTRY INTERNATIONAL DIALOG.
Interim Review #1 David Akerman, Jen Getz, Greg Goldberg, Zach Hazen, Jason Patterson, Benjamin Reese December 4, 2006 PRV (Peregrine Return Vehicle)
AEM 5333 UAV Search and Surveillance. Mission Description Overhead surveillance and tracking – Humans on foot – Moving vehicles Onboard GPS transceiver.
BQM-167A Advanced UAV System Architecture
RASAR Program Real-time Autonomous Synthetic Aperture Radar Objective: Develop a
Status of Inertial Fusion Energy Target Injection & Tracking System Ronald Petzoldt, Dan Goodin, Mike Hollins, Tom Drake, Dennis Lieurance, Kevin Jonestrask,
Advantage Through Technology Michael D. Moskal II & William C. Hughes.
Pollution prevention preparedness and response Kristján Geirsson Environment Agency of Iceland EPPR-meeting 10 Nov
NGB-CD Technology Consortium “Strength Through Cooperation” Major Michael L. Thomas Technical Projects Officer Major Michael L. Thomas Technical Projects.
TODWL and other Navy airborne wind lidar plans including nocturnal flight plan in November G. D. Emmitt SWA Working Group meeting Snowmass, CO 18 July,
SIERRA Svalbard Mission aka CASIE - Characterization of Arctic Sea Ice Experiment Science Goals –Determine the degree to which ice-roughness monitoring.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
1 Center for the Collaborative Control of Unmanned Vehicles (C3UV) UC Berkeley Karl Hedrick, Raja Sengupta.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
January 14,  Length: inches  Diameter: 6 inches  Mass: oz. / lbs.  Span: 22 inches  Center of Gravity: inches 
What aircraft and instruments might I use for my research and do I find out about it/them? Jeff Stith Photo by Grant Gray, EOL.
7 조 강창호 강애량 김창규 오혜영 최재영 이홍일 MQ-9B. 1. Goal of Project 2. Project members 3. Schedule 4. Analysis of UAS 4.1 Requirement analysis 4.2 Air vehicle.
Mid Semester 2 Presentation: February 27, Joshua Lasseigne: Team Lead and Autopilot Programming Christopher Edwards: AGL Subsystem and Website Maintenance.
Mini Autonomous Flying Vehicle CASDE is part of the National effort to develop a Micro Air Vehicle. CASDE has chosen a Mini Vehicle, in the short term,
Team # 강준홍 김상민 박창연 이재형 전중수.
Cal Poly San Luis Obispo UAS Design November 22, 2013.
Light-Portable Synthetic Aperture RADAR
Presented by Robert Clark Instrument Technician
Observing, Measuring and Sampling Ocean Floor Processes to 11,000 meters A Hybrid ROV The Future in the 4 th Dimension.
International Symposium on Remote Sensing of the Environment The NASA IKHANA UAS Platform Introduction to UAV Content provided by: V. Ambrosia, G. Buoni,
Range Operations Craig Griffith Chief, Range Operations Branch WATR Operations Branch Dryden Flight Research Center February 21, 2001.
Ground School 3.06 Weight & Balance.
Planetary Lander PDR Team Name
Project Aegis Preliminary Design Review Team Members:
Mission Aircrew Course Search Planning and Coverage
02/24/2004.
F-18 Hornet and F-18 Super Hornet
Investigations of Spatial and Temporal Variability of Ocean and Ice Conditions In and Near the Marginal Ice Zone: The "Marginal Ice Zone Observations and.
Military Aircraft Systems
FINAL REVIEW UAV AIRFRAME B
Flexible Infrastructure Bulkhead Track Improvements Final briefing to NSRP SWSI Panel March 29, 2018 John Walks Ingalls Shipbuilding Mechanical Engineer.
Mars Rover CDR Team Name
Unit 2 Unmanned Aircraft
Presentation transcript:

NRL/VXS-1 2009 UPDATE

VXS-1 2008 Milestones Operation Rampant Lion Operation T-PARC Afghanistan deployment complete in Jul 2008 Iraq deployment in Nov 2008 Columbia/Honduras/Haiti/Panama deployments Dec 2008 Operation T-PARC Laser installation on ELDORA A/C Completed deployment in Oct 2008 Missile Defense Agency Operations Range clearance, missile tracking, AIS, MASTER, Radar S&T…….. RC-12 Program Belly and wing pods Electro Optic window Radome design currently passed NAVAIR approval Acquisition of 4 Scan Eagle and registry of 210 UAS Ongoing NEO program flights Initial payload up-grade flights flown (Testing systems on manned aircraft) Teaming with PMA-262,263,266 leading Navy and DOD UAS efforts

Operation Rampant Lion Hyperspectral, IR, Photogrammetric & Polarimetric Optics, Multi-band SAR, LiDAR terrain mapping Sensor Suite data is co-registered by K-GPS, and recorded on RAID storage 100’s of Terabytes of data will be gathered Updated Intel Improved Sensor Suite Longer Dwell Time Multiple Passes Varied Time of Day Larger Area of Coverage

ELDORA System Integration

DWL Aircraft Installation Stationary fairing will utilize pre-existing holes from other fairing installations The Installation is in the aft observer window and will use a rotating cylinder over the scanner inside a stationary fairing to lessen drag loads. Cylinder housing around the scanner will match the rotation of the scanner. Optical windows for environmental enclosure and fairing. Machined window insert. The rotating cylinder housing the scanner will utilize a nitrogen purge system to maintain proper dew point and Nichrome wire around the optical glass window to prevent fogging.

DWL Rack Installation Environmental control will be maintained by using existing environment within the aircraft and equipment mounted to a custom rack. Custom rack to mount equipment and transceiver Transceiver will mounted to a shock isolated tray

AEW NP-3D Aircraft NP-3D airframe w/ E-2C HE2K mission suite Originally configured to support NAVSEA for Cooperative Engagement Capability experimentation Dedicated research Airborne Surveillance Command & Control (ASC2) platform capable of long range detection and tracking of small surface vessels and aircraft E-2C NFO & Contract Support Aircrew Additional space available for future technologies Operations Missile Defense Agency (MDA) is current primary sponsor Support ballistic missile research and testing, including AEGIS Missile Defense is a Presidential Priority (DX) program Supporting current CEC Program Office efforts Schedule availability

Project Modifications for VXS-1 C-12 Aircraft

C-12 Modifications Starboard Power Distribution Panel Power Box Project Power Distribution Box: 115 VAC @ 400HZ, (1X) 10 Amp circuit, and (2X) 5 Amp Circuits 115 VAC @ 60HZ, (1X) 15 Amp circuit, (1X) 10 amp circuit 28 VDC (1X) 10 Amp circuit, (2X) 5 Amp Circuits GPS Antenna located on the upper fuselage RO/RO Equipment Racks Rack is 24” deep x 22” wide x 28” tall with standard 19” MX mounting pattern 30” deep variation also designed Designed to be lightweight to allow for more equipment, and lower cost Equipment weight approx 200 Lbs Two Power Boxes installed in the Aft Electronics Bay Inverters installed in the wing

C-12 Internal Rack Configuration

Wing Tip Tanks (in work) Mount on the wing tips. Formerly fuel tanks modified to carry electronics. Incorporate a “Rail” system for slide in/slide out (SI/SO) capability. Electronic equipment can be mounted to a blank plate which allows for SI/SO.

Window Option for Radome Will allow for large instruments to be used that require optical windows Radome with window C-12 Radome model

NRL UAS Inventory

NRL Flying UAS

Scan Eagle Components Airframe Ground Station Launcher Recovery Stand

Scan Eagle Parameters PERFORMANCE Max Horizontal Speed 75 knots Cruise Speed 48 knots Ceiling 19,500 ft Endurance 12+ hours DIMENSIONS Wing Span 10.2 ft Fuselage Diameter 7 in Length 5 ft WEIGHTS Empty Weight 28 lb Fuel and Payload 15 lb Max Fuel 12.1 lb Max Takeoff Weight 44 lb FREQUENCIES (MHz) C2/Telemetry: 1350-1390 Video Downlink: 2300-2500 PAYLOADS Sony FCB-EX780 EO Camera DRS Tech. E3500 IR Camera SE UAS has over 100,000 hours of flight time in theater

Summary Unique and Flexible S&T Platforms Cost Efficient Theater capable S&T assets for concept development & demonstration Full combat survivability modification Risk reduction for early spiral development for future sensors & capabilities Support numerous airborne research projects Large/small, single and multi-station projects Allows back-up aircraft for projects Compatible with other VXS-1 project aircraft Pallet interchangeability Cost Efficient Minimum down time between projects Low Flight Hour cost

NRL/VXS-1 Points of Contact CDR J.C. Coffey – NRL Code 1400 (202) 767-2273 john.coffey@nrl.navy.mil Brooke Churgai – Contract Support (202) 767-7512 brooke.churgai.ctr@nrl.navy.mil Jack Jones – Contract Support (301) 863-2453 jjones@eaglesystemsinc.net VXS-1 CDR Darrell Vance – Commanding Officer (301) 342-3751 darrel.vance@navy.mil Sam Kogel – Special Projects Coordinator (301) 342-3256 samuel.kogel@navy.mil