ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.

Slides:



Advertisements
Similar presentations
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Advertisements

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
ELM4701/02: ELM Projects I & II The mini-project has served as a practice project. It has given us the opportunity to explain our expectations and you.
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Progress Reports Week 4 Day 1.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Project Management Session 7
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Systems Engineering Management
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
ENGR-11_Small_Volume_Design.pptx 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical & Mechanical.
CEN Fourth Lecture Introduction to Software Engineering (CEN-4010) Instructor: Masoud Sadjadi Project Organization.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
From Research Prototype to Production
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Bruce.
ENGR-11_Engineering_Design_Cycle_Details.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
Chapter 4 Process Design.
OVERALL ROBOT DESIGN, FTC STYLE PRESENTED BY: ANDY BAKER Sept
Configuration Management (CM)
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
BIS3324 Group Assignment – Schedule, guideline & templates (2015-Jan Semester)
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Chapter 18 cont.. Sub Assemblies  Smaller assembly that is part of a larger assembly  Drawings for subassemblies are shown in their own assembly drawings.
GCSE Design and Technology: Product Design
ENGR-11_Small_Volume_Design.pptx 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical & Mechanical.
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
ENGR-11_Computer_Enclosure_DWG_Pkg.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
Request for Proposal (RFP)
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
IFS310: Module 7 Business Requirements Statement Interpersonal Skills and Communications.
DESIGN 1 DPT224 TOPIC 2: ENGINEERING DESIGN PROCESS.
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
Critical Design Review (CDR)
Electronic Drafting DFT 58A&B Cliff Monroe - Instructor.
ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Bruce.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
I. Preliminary Design Review 1. Product specification 2. Project scope 3. Technical approach/solution to the Design Problem 4. Working Schedule (Gantt.
ENGR-36_Lab-06_Fa07_Lec-Notes.ppt 1 Bruce Mayer, PE Engineering-36: Vector Mechanics - Statics Bruce Mayer, PE Licensed Electrical & Mechanical Engineer.
SOFTWARE PROJECT MANAGEMENT
ENGR-11_CrDR_Tank_MockUp.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical & Mechanical.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Matls-Lab_Cantilever_Beam_Fixture.ppt 1 Bruce Mayer, PE Engineering & Engineering-Technology: Materials of Engineering Bruce Mayer,
Objective: Develop hybrid biological semiconductors which are EMP resistant and whose electronic properties can be directly manipulated by environmental.
Chapter 6: Database Project Management
Introduction to New Product Development (Portfolio)
Software Requirements
Software and System Delivery
Chapter 3 Managing the Information Systems Project
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Monte Carlo vs. PERT Tutorial
Introduction to Software Engineering (CEN-4010)
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
Project Management Considerations
World’s Fastest Electric Vehicle
NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Presentation transcript:

ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical & Mechanical Engineer Engineering 11 Tank Agitator Design Project

ENGR-11_Tank_Agitator_Design_Project.ppt 2 Bruce Mayer, PE Engineering 11 – Engineering Design Design Goal  Design a 24/7 “Wave-Like” Agitation System for a TidePool Culture Tank in a Marine Biology Lab

ENGR-11_Tank_Agitator_Design_Project.ppt 3 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements Must Run Unattended and Automatically 24 hrs/day, 7 days/wk 2.Power Sources Available 115 Vac, 15 Amp Electricity (1725 W) 100 psig, 5 cfm Compressed Air (1630W) 3.Gentle, Back-and- Forth Surface Agitation to Approximate Waves Breaking over an Exposed Tide Pool

ENGR-11_Tank_Agitator_Design_Project.ppt 4 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements Wave Period = seconds 5.Tank Size in feet = 2W x 3L x 1D 6.Must Resist Sea Water Corrosion 7.Low Cost → $500 Budget 8.Must be Easy to Install and Uninstall (Biologists will use it) Tools Available Basic Mechanical, Plumbing, and Wiring Hand-Tools Hand Power Drill Reciprocating Saw (a.k.a. “SawzAll”)

ENGR-11_Tank_Agitator_Design_Project.ppt 5 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements FULL Set of CAD (AutoCAD or SolidWorks) Design and Fabrication Documents Fabrication Dwgs for Machined Parts –Material Callout and Finish –Full Dimensioning Assembly Drawing –Views and Basic Instructions for Assembly –Bill of Materials with Part Numbers Electrical/Pneumatic Schematics 10.Project Management Sources of Supply and Catalog No.s for purchased Parts

ENGR-11_Tank_Agitator_Design_Project.ppt 6 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements Project Management cont. Projected Cost excluding Assy –Cost for Machine Parts from Chabot Machine Tool Technology Instructors A. Long & M. Absher –Purchase Parts from Supplier Catalog or Price-Quote 11.Design Analysis & Literature Research Pro’s & Cons of Alternative Designs Safe Operation – Mech. & Elect. Force Load Analysis (statics) Corrosion Resistance Possible Failure Modes (FMEA)

ENGR-11_Tank_Agitator_Design_Project.ppt 7 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements Extra Credit Milestone Schedule or PERT Chart GDT Dimensioning –Must be able to EXPLAIN it Written Assy & Test Procedures MockUp or Working-Prototype User Manual

ENGR-11_Tank_Agitator_Design_Project.ppt 8 Bruce Mayer, PE Engineering 11 – Engineering Design Design Presentations  Assumes 4 Member Teams: M1 → M4  Presentations Last min Two Members Team Up for Presentation –Must Divide Presentation Approx. Equally  Formal Presentations (as would be given to Management or Customers) Done Using POWERPOINT  FollowUp → Write Action Item List WHO will do WHAT by WHEN

ENGR-11_Tank_Agitator_Design_Project.ppt 9 Bruce Mayer, PE Engineering 11 – Engineering Design Design Presentation - CDR  CONCEPTUAL Design Review (CDR) By Team Members M1 & M2 Describe Alternatives Considered –Why the Selected Alternative?  Identify Risks Concept Drawings and Sketches Likely Materials ROUGH $-Cost Estimate Team Member Assignments → Division of Project Effort

ENGR-11_Tank_Agitator_Design_Project.ppt 10 Bruce Mayer, PE Engineering 11 – Engineering Design Design Presentation - CrDR  CRITICAL Design Review (CrDR) By Team Members M3 & M4 Detailed Layout and Schematics Engineering Physical Analyses –Force/Loading –Corrosion/Wear –Energy/Power Materials & Component Selection 90+% Accurate $-Cost Estimate

ENGR-11_Tank_Agitator_Design_Project.ppt 11 Bruce Mayer, PE Engineering 11 – Engineering Design Design Presentation - CrDR First-Cut Drawing Package –Parts, Assy, Schematic –Bill of Material With Part Numbers –Sources of Supply for Purchase Parts  Phone Numbers of Suppliers  Catalog Number for Purchase Parts FINAL Cost Estimate to ±5% Demonstrate –Non-Working MockUp (Std extra credit) –Working ProtoType (High extra credit)

ENGR-11_Tank_Agitator_Design_Project.ppt 12 Bruce Mayer, PE Engineering 11 – Engineering Design AutoCAD Tank Template Template Posted to WebPage SeaWater_Tank_Template_E _BMayer_ DWG

ENGR-11_Tank_Agitator_Design_Project.ppt 13 Bruce Mayer, PE Engineering 11 – Engineering Design Labor & Materials Estimates  For Parts Designed by the STUDENT, the Part-Cost will NOT be published.  Instead the Designer must solicit from Fabricators ESTIMATES or QUOTATIONS for the Cost to Fabricate the Parts  Material-$ Estimates Find Materials Costs on the InterNet  Production Labor-$ Estimates Call Fab Shops See During Office Hours MTT instructors –Mr. Ashley Long –Mr. Mike Absher See B. Mayer –Last Resort

ENGR-11_Tank_Agitator_Design_Project.ppt 14 Bruce Mayer, PE Engineering 11 – Engineering Design Design Resources  Good Component Catalogs McMaster-Carr (the best) Graingers (Motion Generators – motors) Omega Engineering (Sensors) Newark Electronics (Electrical Elements) PIC Design (Mechanical Elements) Cajon/SwageLok (plumbing & valves) Bimba (Motion Generators – Pneumatic Linear Actuators)

ENGR-11_Tank_Agitator_Design_Project.ppt 15 Bruce Mayer, PE Engineering 11 – Engineering Design Example Schedule ItemStartFinishTask/MileStone Description 1Wk-01Wk-02UnderStand Functional Requirements 2Wk-02Wk-03Form Team 3Wk-02Wk-04BrainStorm Solutions, Select 2-3 for Feasibility Assessment 4Wk-04Wk-05Concept Feasibility Analysis (Pros & Cons); Select Best Concept 5Wk-05Wk-06Select Source-of-Motion; Finalize: Agitator Concept, Mtg to Tank 6Wk-06Wk-08Make AutoCAD Layout, Find Supplier for Source-of-Motion 7Wk-07Wk-08Prep for CONCEPTUAL Design Review – Ref. CDR ScoreSheet 8Wk-08 CONCEPTUAL DESIGN REVIEW (CDR) PowerPoint Presentation 9Wk-09 Iterate on Design based on CDR “Post Portem” Review 10Wk-10Wk-14Detail-Design and Formal ACAD dwgs for “Piece Parts” 11Wk-10Wk-14Research Suppliers and Select Purchased-Parts; Need Cat. No.s 12Wk-12Wk-15Construct Accurate and Complete Bills of Material 13Wk-12Wk-15Determine Manufacturing Methods, Collect Cost Data 14Wk-12Wk-15Detail-Design and Formal ACAD dwgs for SubAssys & FinalAssy 15Wk-15Wk-16Prep for CRITICAL Design Review – Ref. CrDR ScoreSheet 16Wk-17 CRITICAL DESIGN REVIEW (CDR) PowerPoint Presentation xtraWk-10Wk-17Build, Assemble, Test, and Demonstrate ProtoType HardWare

ENGR-11_Tank_Agitator_Design_Project.ppt 16 Bruce Mayer, PE Engineering 11 – Engineering Design Weekly Reports  Each TEAM will submit a Weekly Report (WkRpt) on the Dates Listed in the Course Schedule Suggest Team Members Alternate Writing the Reports  Report Form → Chabot_Engineering_Weekly_Report_T emplate_0906.doc Posted to WebPage

ENGR-11_Tank_Agitator_Design_Project.ppt 17 Bruce Mayer, PE Engineering 11 – Engineering Design Weekly Reports  Report Length → 1-2 pages Appendices NOT included  Report Content Two Required §’s → –Previous Week Accomplishments –Plans for Next Week Optional § → Appendix (or Appendices)  Example Posted on WebPage Weekly_Report_Example_BMayer...doc

ENGR-11_Tank_Agitator_Design_Project.ppt 18 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Licensed Electrical & Mechanical Engineer Engineering 11 Appendix MileStone Schedules

ENGR-11_Tank_Agitator_Design_Project.ppt 19 Bruce Mayer, PE Engineering 11 – Engineering Design Design Reviews  Functional Requirements Review (FRR). The purpose of the FRR is to review the functional requirements specification document, to ensure the documented requirements reflect the current knowledge of the customer and market requirements, to identify requirements that may not be consistent with product development constraints, and to put the requirements document under version control to serve as a stable baseline for continued new product development.  Conceptual Design Review (CDR). The purpose of the CDR is to review the conceptual design to ensure that the planned technical approach will meet the requirements.  Critical Design Review (CrDR). The purpose of the CrDR is to review the detailed design to ensure that the design implementation has met the requirements  Final Design Review (FDR). The purpose of the FDR is to ensure that the design is completely and accurately documented and ready for formal release to manufacturing.

ENGR-11_Tank_Agitator_Design_Project.ppt 20 Bruce Mayer, PE Engineering 11 – Engineering Design GS 3 Visit – Dec00 Mr. W. A.B. Mayer PC030053aThe S2 investigators pose in front of their subject at the conclusion of the inspection. Mr. W. A. on Left. Bruce Mayer on right. Circa Dec00.

ENGR-11_Tank_Agitator_Design_Project.ppt 21 Bruce Mayer, PE Engineering 11 – Engineering Design S2 Team Inspect Primary Power Box (PPB) Mr. Y. K. Mr. I. A. Mr. A. N. Mr. Y. N. Mr. H. T.

ENGR-11_Tank_Agitator_Design_Project.ppt 22 Bruce Mayer, PE Engineering 11 – Engineering Design Full S2/S8/CE Compliance – Detailed Schedule Ref. BMayer file 3100_S2S8CE_0109.mpp

ENGR-11_Tank_Agitator_Design_Project.ppt 23 Bruce Mayer, PE Engineering 11 – Engineering Design Full S2/S8/CE Compliance – Detailed Schedule

ENGR-11_Tank_Agitator_Design_Project.ppt 24 Bruce Mayer, PE Engineering 11 – Engineering Design 2100 ß-System: Pre Shipment Testing

ENGR-11_Tank_Agitator_Design_Project.ppt 25 Bruce Mayer, PE Engineering 11 – Engineering Design 2100 ß-Site Schedule

ENGR-11_Tank_Agitator_Design_Project.ppt 26 Bruce Mayer, PE Engineering 11 – Engineering Design 2100 ß-Site Schedule

ENGR-11_Tank_Agitator_Design_Project.ppt 27 Bruce Mayer, PE Engineering 11 – Engineering Design 2100 ß-Site Schedule ON-Semi_2100_0109_DWG.mpp