PREESALL UNDERGROUND NATURAL GAS STORAGE FACILITY.

Slides:



Advertisements
Similar presentations
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Advertisements

By Chris Ford and James Hughes ( ) ( )
Sarah Evans (Senior EHO) & Angela Guy (Contaminated Land Officer)
Case study: coastal management in Holderness
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
The River Dee By Max Reidy The Source The Source is the beginning of the river and usually starts up in the hills. It is where the river starts its.
UNW-DPC International Workshop Institutional Capacity Development in Transboundary Basins Lessons learned from practical experiences 10 – 12 November 2008.
Michele Robertson, PG Is Deep Injection a Disposal Option in Arizona? GATEKEEPER REGULATORY ROUNDUP 2011 February 16, 2011.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Environmental Geotecnics1 Environmental Geotechnics Case Study WWII Mustard Gas Factory at Ergethan in the Former East Germany.
Conserving Marine Areas National Marine Conservation Areas (NMCA’s)
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
Habitat Creation on the Severn Estuary Lyn Jenkins Flood and Coastal Risk Management South west Regional Habitat Creation Programme.
North Hoyle Offshore Wind Farm 17th April 2002 BONUS Energy A/S.
Water Pollution. Watershed A watershed is an area of land from which all the water drains to the same location, such as a stream, pond, lake, river, wetland.
Dounreay Nuclear and Chemical Land Contamination.
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
Dealing with Surface Water Discharge in a Sustainable Manner Laura Wilkinson Development and Flood Risk Engineer Sustainable Cities Tuesday 13 April.
UK MESH Workshop Local Perspective, Sea Fisheries & European Marine Site David McCandless North Eastern Sea Fisheries Committee.
Claire Gibson, Wave Hub General Manager 19 February 2013
European Federation of Geologists The role of geology In Environmental Impact Assessments (EIAs)
AMAZON RIVER. About Amazon:- The Amazon is the greatest river in the world by so many measures; the volume of water it carries to the sea (approximately.
Michael Nevin Longford County Enterprise Board November 2012.
NEWS _menacehttp://news.yahoo.com/s/ap/climate_09_jellyfish _menace
Marine Natura in UK offshore SAC consultation Charlotte Johnston, Mark Tasker, Paolo Pizzolla JNCC North Sea RAC.
Eco Sustainable Solutions Ltd New Waste Technology – Street Sweeping Plant.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
What resources are found in the ocean?
Bathing Water Update – March 15 Sarah Jenner Bathing Water Manager.
Thames Valley/Matatoki Water Supplies October 2012.
Fish farm monitoring in Scotland Scotland Norway MOU Committee 29 March 2011 Edinburgh Douglas Sinclair, Specialist Scottish Environment Protection Agency.
Jeopardy $100 Land + SeaTrash/MinesPollutionWater Miscellaneous $200 $300 $400 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100.
European Marine Sites Update Ruth Crundwell. Natural England Advisers to the government on the environment, providing practical scientific advice on how.
The Marine and Coastal Access Bill in Wales Alan Storer Marine Legislation and Policy Officer Marine Branch Welsh Assembly Government.
1.Freshwater, Marine and Brackish Water Resources 2. Freshwater pollution.
Options PA Definition No change (concept is agreed) OK as isClarify meaning of words Minor change – concept needs refining Major change – CBD definition.
Remediation of Seepage from Geological Storage (GHG/07/43) Aim of study was to: Identify remediation approaches and techniques that.
North Bay Climate Adaptation Initiative
To return to the chapter summary click Escape or close this document. Chapter Resources Click on one of the following icons to go to that resource. earth.msscience.com.
“Nature always wears the colors of the spirit” – EMERSON “The horizon’s edge, the flying sea-crow, the fragrance of salt marsh and shore mud…” -- WHITMAN.
James Denton-Brown Industrial & Ports Practice Leader Bechtel Civil-San Francisco 1 Khalifa Port and Khalifa Industrial Zone-Abu Dhabi Middle East Case.
Chirstchurch: Pipelines. Earthquake Concerns on Underground Pipes Wave propagation Permanent ground deformation Liquefaction Can lead to pipe leakage.
1. Coral Atoll 2. Fringing Reef 3. Barrier Reef. CORAL ATOLL Isolated ring shaped reef rising out of deep water.
Severn Estuary Forum Flood Risk and the Severn Barrage 19 th September 2009 Nick Lyness Wessex Flood &Coast Erosion Risk Manager.
The State of the Sound Scott Redman Puget Sound Action Team February 5, 2003 Marine Water and Nearshore Successes & Challenges.
PHASE 7 FACILITIES ENGINEERING
Marine Life Protection Act Unresolved Feasibility Issues for the Regional Stakeholder Group Revised North Coast Marine Protected Area Proposal Presentation.
Super text. to provide a hydrologic unit layeris needed National Geo-spatial Framework The Solution Non-politically biased Hydrologically sound consisting.
1 Port Development and the Reuse of Dredged Material in the Stour and Orwell Estuaries Dr Andrew Birchenough Dr Chris Vivian The Centre for Environment,
NEWS _menacehttp://news.yahoo.com/s/ap/climate_09_jellyfish _menace
WATERHOLIC - a drop of water, a drop of hope COLEGIUL TEHNIC „MIRON COSTIN” ROMAN, ROMÂNIA 23 – Palermo, ITALIA.
Environment Agency Regulation and support for business Richard Penn Environment Planning and Engagement Manager.
Classification Study : eThekwini Municipality Perspective : Introduction to eThekwini Study
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
Hydraulic Fracturing Tom Carr, Lauren Dynes, and Pete Strader.
76. The central U.S. law regulating water quality is the Clean Water Act (CWA), adopted in The Act initially focused on point sources, which it.
Special Protection Areas National Workshop 8 & 9 March 2016.
Agnes Water Desalination Project Preliminary Studies – Aquatic Ecology John Thorogood and Kylie McPherson.
South East Strategic Regional Coastal Monitoring Programme – Annual Review Meeting, November 2009 Satellite Data for Coastal Monitoring Trevor Burton Fugro-BKS.
Prepared by the Coal Authority and presented to South Tyneside Council & Durham County Council 25 September 2012 Tyne & Wear Aquifer Protection Scheme.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Table 1. Environmental impacts associated with upstream and downstream petroleum operations Aniefiok E. Ite et al. Petroleum Exploration and Production:
Draft Year: 1974 Amended: 1984& 1996 National legislation.
By Tessa Johnson The Oceania Project Dedicated to Marine Life Research since 1988.
Platform Meeting Rudbøl, Denmark Olaf G. Christiani, DFNA.
0 Sustainability – Net Positive Environmental and Social Gains from Mining Reuben Mills, Director Health Safety & Environment October.
What has happened since 2015?
Preesall Underground Gas Storage Scheme
Links with Marine Strategy Framework Directive
Meeting of the WFD Strategic Co-ordination Group 11 March 2009
Presentation transcript:

PREESALL UNDERGROUND NATURAL GAS STORAGE FACILITY

IRISH SEA DISCHARGE PRESENTATION BY ANDREW SAUNDERS TO THE COMMUNITY LIAISON PANEL

Contents The Water Washing Process The Irish Sea Environment Discharge Modelling and Discharge Consent Summary

The Water Washing Process Following slides show further details.

The Water Washing Process Natural gas storage caverns created in new salt body by solution mining – would take place in sequence over a 4-6 year period. Once created would be washed approximately every ten years during operation of scheme.

The Water Washing Process  Existing mine workings part of a monitoring and maintenance programme on Halite owned land for which they have responsibility.  123 wellheads being maintained. Monitoring has identified where additional measures at wells are required.  Geological Summary Report available on Location of Brine-wells and Exploratory boreholes Location of Preesall Salt Mine

The Water Washing Process De-brine Facility – removes solids and gases Located east of Wyre Estuary

The Water Washing Process

The Irish Sea Environment Discharge up to 80,000 cubic metres a day 2.3km from shore to the Irish Sea Discharge approx 2km from nearest European protected nature conservation site - Liverpool Bay Special Protection Area Surveys of marine life and habitat undertaken

Discharge Modelling and Discharge Consent Discharge modelling undertaken for a range of options Method and results agreed with the Environment Agency Results used to support obtaining a discharge consent from the Environment Agency

Discharge Modelling and Discharge Consent

Summary  Water pumped from Fleetwood Fish Dock, beneath Wyre and then injected into previously undeveloped salt body to create caverns.  Water returned to treatment facility then pumped across peninsula to outfall 2.3km offshore in the Irish Sea.  Discharge would last for 4-6 years.  Irish Sea – ecological surveys undertaken. Outfall would be away from protected areas.  Modelling of discharge – method undertaken in agreement with Environment Agency and discharge consent obtained.  Environment Agency standards predicted to be met at 50 and 250 metres from the outfall.  Offshore environment would be monitored before, during and after discharge.