Cabling Project. Your first responsibility, as the network designer, will be to have your client specify, in writing, the desired outcome of the project.

Slides:



Advertisements
Similar presentations
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Advertisements

Chapter 3: Planning a Network Upgrade
HOW TO MAKE UTP CAT-5/5e CABLE
Antonio González Torres
Institute of Technology Sligo - Dept of Computing Structured Cabling Project Chapter 9 Paul Flynn Paul Flynn.
+ Straight-Through Cable Construction Lab 4. + Data Transmission In data transmission system, the transmission medium is the physical path between transmitter.
Chapter 4 – Cisco Semester I
Network Engineering Taster Day Mark Clements. 30 March 2012Engineering Taster Day 2 Welcome to Engineering Taster Day: Morning Session Ambassadors Fire.
CIT 470: Advanced Network and System Administration
SEM 1V2 Chapter 9 Structured Cabling
Page 1 - © Richard L. Goldman Networking Topology ©Richard L. Goldman January 8, 2002.
Hands On: Cutting and Connectorizing UTP Chapter 3a Panko’s Business Data Networks and Telecommunications, 6 th edition Copyright 2007 Prentice-Hall May.
Cisco Academy – Chapter 5 Physical Layer. Physical Layer - 1 defines the electrical, mechanical, procedural, and functional specifications for activating,
Telecommunications cable types
CSC 450/550 Part 3: The Medium Access Control Sublayer More Contents on the Engineering Side of Ethernet.
111 © 2002, Cisco Systems, Inc. All rights reserved. Trim out phase steps Cutting cables to length Labeling cables Dressing cables Terminating cables Installing.
Institute of Technology, Sligo Dept of Computing LAN Design Semester 3, Chapter 4.
Understanding Network Architecture Access Methods –CSMA/CD Carrier Sense Multiple Access/Collision Detect –CSMA/CA Carrier Sense Multiple Access/Collision.
Lesson 4 – UNDERSTANDING NETWORK CABLING. Network topologies Network cabling Installing and maintaining Network cabling Selecting and installing a SOHO.
How are Computers Connected? Chapter 8. How do you connect computers? Run wires between two computers Power Cord Plug into a power outlet Two wires needed.
Many Roads To Home. LAN Roads UTP STP Coaxial Fiber Optics.
Cisco – Semester 1 – Chapter 9 Preview Review. Behavioral Objectives Document all work –Do it as work proceeds –Same as chapter 8 guidelines –Don’t forget.
Structured Cabling Project
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
This is the way an organisation distributes the data across its network. It uses different types of networks to communicate the information across it.
Cable.ppt CCNA Exploration Semester 1 Chapter 10
Chap 9 Structure Cabling Project Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
Connecting LANs, (network devices) Backbone Networks, and Virtual LANs Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction.
Chapter 20 Networks. 4 Questions that need to be answered concerning networks? –How will each computer be identified? –What kind of wire should you run.
Chapter 2 Network Design Essentials Instructor: Nhan Nguyen Phuong.
NETWORK CABLING Chapter 2
1 Chapter 2: LAN Standards, Physical Connectivity, and Media Access.
20 LAN Hardware Overview Version A.01 H3065S Module 2 Slides.
Semester 1 CHAPTER 3 Le Chi Trung
Local Area Networks Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
Structured Cabling Project Chapter 9
Crossover Cable Construction
Chapter 9 Review Structured Cabling Project. Chapter 9 Focus The focus of this chapter is standards for networking media. You read that when RJ-45 jacks.
Module 3: Networking Media Safe Handling and User of a Multimeter Voltage Measurement Resistance Measurement Series Circuits 3.1.9a.
1 Discovery 2, Ch 4 Notes. 222 Cabling Standards Standards ensure that networks perform to expectations US—IEEE & ANSI/TIA/EIA Canada—CSA (Canadian Standards.
Design and Documentation Chapter 8. Network Design Issues Your first step in the process is to gather information about the organization. This information.
Network Anatomy By: Roland J. Boutte. Ethernet Cable cable used to connect computing devices together directly. two hosts or two switches to each other.
LAN Design Semester 3, Chapter 3. Home End Table of Contents Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There!
NET 324 D Networks and Communication Department Lec1 : Network Devices.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2004 Connecting Devices CORPORATE INSTITUTE OF SCIENCE & TECHNOLOGY, BHOPAL Department of Electronics and.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Connecting to the Network Introduction to Networking Concepts.
Computer Networks Syed Md. Ashraful Karim Lecturer, CSE BU.
Chapter 5a. 5a-2 Single Twisted Pair Jacket Four pairs (each pair is twisted) are enclosed in a jacket. Copyright 2011 Pearson Education, Inc. Publishing.
Guide to Networking Essentials Fifth Edition Chapter 2 Network Design Essentials.
How are Computers Connected? Chapter 8. How do you connect computers? Run wires between two computers Power Cord Plug into a power outlet Two wires needed.
NETWORKING MEDIA b Shielded twisted-pair - 2 pair, 150 ohm b unshielded-twisted pair - 4 pair, 100 ohm b fiber optic cable - 2 fibers b coaxial cable -
T. Hajer Brahim & T. Rania Alakazalah U.Y: 1435/1436 H.
COMPUTER NETWORKS CS610 Lecture-13 Hammad Khalid Khan.
Connectors, Repeaters, Hubs, Bridges, Switches, Routers, NIC’s
BACKBONE NETWORKS. A backbone network allows several LANs to be connected. In a backbone network, no station is directly connected to the backbone; the.
Chapter Objectives In this chapter, you will learn:
How to wire Ethernet Cables
Connecting Network Components
Local Area Networks Yiannos Mylonas.
LAN Design Broadcast and Collision Domains
Mollie Sconyers.
Introduction to Computers
Introduction To Computers
Hands On: Cutting and Connectorizing UTP
Essentials of Networking
Hands On: Cutting and Connectorizing UTP
Hands On: Cutting and Connectorizing UTP
Connectors, Repeaters, Hubs, Bridges, Switches, Routers, NIC’s
Presentation transcript:

Cabling Project

Your first responsibility, as the network designer, will be to have your client specify, in writing, the desired outcome of the project.

As the designer, you will include written documentation, including fact-finding assessments, work-in-progress reports, and final reports and test results.

The following list includes some of the documentation that you should create while you are in the process of planning/designing your network: engineering journal logical topology physical topology cut sheets problem-solving matrices labeled outlets labeled cable runs summary of outlets and cable runs summary of devices, MAC addresses, and IP addresses

The flowchart should include the following tasks: installing outlets installing jacks running cables punching cables into patch panels testing cables documenting cables installing NICs installing hubs, switches, bridges, and routers configuring routers installing and configuring PCs

Your plan should include the following: building materials suppliers tools date and length of time tools required

The telecommunications outlet, in a horizontal cabling scheme, is usually mounted on a wall. EIA/TIA-568B specifies two types of wall mounts that can be used to position an RJ-45 jack onto a wall - the surface mount, and the flush mount.

Next, separate out each pair of twisted wires. The first color that appears on the left side of the jack is blue. Find the pair of wires that contains the blue wire, and untwist them. Lay the blue wire on the slot, on the left, that is color coded blue. Lay the second wire of this pair on the slot, on the right, that is color coded blue and white.

A cut sheet is a rough diagram that shows the locations of the cable runs.

Avoid labeling cables, telecommunications outlets, and patch panels with terms such as "Mr. Zimmerman's math class," or "Ms. Thome's art class". Mr. D’s

Rather than run the cable four times over the same route, your work would be easier, and you would save time, if you routed all four cables at the same time. To do this, you need four spools of cable. Label each cable end.

Allow enough cable for the ends to reach all the way to each jack location plus enough excess or slack to reach the floor and extend another 2'-3'.

Use the labels on each spool as a reference, then mark each cable with the appropriate room number and letter.

Whenever you work in walls, ceilings, or attics, the first thing you should do is turn off power to all circuits that might pass through those work areas! If you are not sure which wires pass through the section of the building in which you are working, a good rule to follow is to shut off all power. Never, ever, touch power cables! Even if you think you have cut all power to the area where you will be working, there is no way to know if they are "live".

Finally, if you find that you must route cable through spaces where air is circulated, you will need to use a fire- rated cable.

In an Ethernet LAN star topology, the horizontal cabling runs, which come from the work areas, usually terminate at a patch panel.

Cable testers, sometimes referred to as time domain reflectometers (TDRs), measure the distance to open- ended, or shorted cable by sending an electrical pulse through the cable. The devices then time the signal's reflection from the end of the cable. This test can provide distance readings that are accurate to within 2 feet.