Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Insertion Device R&Ds Toshi Tanabe George Rakowsky, John Skaritka and Susila Ramamoorthy NSLS-II Experimental Facilities.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Alexander Temnykh Cornell University, Ithaca NY, USA
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
K. Balewski (DESY)IWBS Conceptual Design of the PETRA III Orbit Feedback K. Balewski, H.T Duhme, J. Klute, I. Krouptchenkov, R. Neumann, G. K. Sahoo,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Stability of Mechanical Systems S. Sharma and V. Ravindranath.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
1 BROOKHAVEN SCIENCE ASSOCIATES Undulator Development R&D Plan Toshi Tanabe George Rakowsky, John Skaritka, Steve Hulbert, Sam Krinsky, Timur Shaftan,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Alignment and Beam Stability
1 BROOKHAVEN SCIENCE ASSOCIATES Lonny Berman and Dario Arena, NSLS Summary The present built-out NSLS-II design includes: 30 bending magnet ports, each.
SR Vacuum Systems and Front Ends
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
NSLS-II ASAC Review, 10/9-11/06 H-C. Hseuh,…, SR Vacuum Systems Storage Ring Vacuum Systems H-C. Hseuh, C. Foerster, J. Hu, G. Mahler, S. Pjerov, S. Sharma,
1 BROOKHAVEN SCIENCE ASSOCIATES S.Sharma 10/11/2006 NSLS-II Mechanical Subsystems Accelerator Systems Advisory Committee Review October 10-11, 2006 Sushil.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES S. Sharma ASAC July 17-18, 2008 Support System and Alignment Sushil Sharma ME Group Leader ASAC Review of NSLS-II July.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
Insertion Devices: Wigglers and Undulators Session 6 Insertion Devices Group 11/1/12.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Experimental Facilities Advisory Committee May 10, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES Lonny Berman EFAC May 10 th 2007 ID Beamline Optics and Damping Wigglers.
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
PETRA III, A New High Brilliant Light Source At DESY
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
1 BROOKHAVEN SCIENCE ASSOCIATES 1 NSLS-II Lattice Design 1.TBA-24 Lattice Design - Advantages and shortcomings Low emittance -> high chromaticity -> small.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Slide: 1 Workshop on Accelerator R&D for USR Beijing, 30 Oct – 1 Nov., 2012 Some engineering considerations for USR light sources L. Zhang European Synchrotron.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Super-B Vibration Tolerances
In Vacuum Magnetic Field Measurement System for CPMU of HEPS-TF
High Gradient Magnet Design for SPring-8 Upgrade Plan
Orbit Control For Diamond Light Source
Mechanical system of CEPC
Summary of Session 5 Other Vibration Source
Helicons are RF plasmas in a magnetic field
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
Progress and plans, Mechanics system of CEPC
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Fixed Support Design & Testing
Physics Requirements for Conventional Facilities
Breakout Session SC3 – Undulator
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka, C. Stelmach NSLS-II

Main Technical Concerns 1.Machine Specifications and Tolerances Magnetic field quality Alignment of the SR magnets Vibration and thermal stability 2.Damping Wigglers High power density beam with a large fan 3.Cryogenic Permanent Magnet Undulators (CPMUs) Field measurement Precise gap separation and thermal stability Vacuum and impedance issues

1.Machine Specifications and Tolerances SR sextupole alignment tolerance: μm (2-σ cut) BPM position stability (thermal): ± 1 μm Magnet position stability (thermal + vibration): 100 nm (rms, 4 – 50 Hz) NSLS-II SR Magnet Magnet Gap Max. Field 3.6 GeV) Field Homogeneity Good Field Region Dipole35 mm0.393 T2 x mm x 10mm Quadrupole55 mm25.0 T/m2 x mm x 20mm Sextupole60 mm800 T/m 2 5 x mm x 20mm Magnetic Field Quality Preliminary designs of the magnets are underway. Magnet vendors will be consulted about the final designs and tolerances.

Magnet Alignment Very stiff girder with precisely machined slots for the magnet’s support frame. Adjustable magnet support frame to precisely align magnetic axis to a fixed height. Magnets are directly bolted to the girder without shims or alignment hardware. Six or more support points for the girder to minimize static deflection Australian Girder-Magnet Assembly SPring-8 Girder-Magnet Assembly

Magnet Vibration due to Ambient Ground Motion Ambient ground motion drops steeply as 1/ω 4 No significant vibration amplification for ω/ω n << 1 First natural frequency of the girder-magnet assembly should be above 30 Hz.

Magnet Vibration Low profile girder  beam height of ~ 1m No pedestals under the girder. Several (6 or more) girder support points Simple girder alignment mechanism No alignment mechanisms between the girder and magnets. ALBA Girder-Magnet Assembly Support Concept f 1 = 57 Hz APS Girder

NSLS-II SR and Booster Rings Low profile booster and SR rings. The floor drops in the experimental hall by 0.4m to provide a beam height of 1.4 m. Deep commercial anchors are cast in concrete eliminating the need for pedestals or grouting.

Thermal Stability Air and process water temperature regulation: ± 0.1 ºC If necessary SR girders can be insulated and sand-filled. Thermally-Insulated NSRRC Girder Thermal Insulation Sand

NSLS-II Damping Wigglers NSLS-II Damping Wiggler Period (mm)100 Length (m)6 No. of Periods60 Field (T)1.8 P total (kW) 79.7 P d (kW/mrad 2 ) 98.3 P v (kW/mrad) 18.8 Horizontal Fan ± K/ γ (mrad) ± 2.45 At 7m from the center of the wiggler, the fan is ~ 34 mm. Incidence power density at 0.6 mrad incidence = ~ 1.6 W/mm  Aluminum chamber will require additional cooling channels. Dipole Chamber 7m Cooling Channel

Beam position interlock will be required to protect the chamber. Incidence power density at 10 m and at 1.5 degree incidence = ~ 50 W/mm. A Glidcop fixed mask can handle this power density. 10 GPM water flow  ΔT ~ 30 ºC NSLS-II Damping Wigglers – Fixed Mask APS quad with exit port Wiggler Gildcop Mask ~ 25 cm long

Thermal FatigueTests at APS (26-ID Beamline) Realistic design criteria will be established based on thermal fatigue tests at APS. Designs of high-heat-load absorbers and photon shutters will be optimized.

NSLS-II CPMU – Technical Challenges Magnetic Measurements of long small gap, UHV compatible undulators Precision control of the Undulator gap Effects of external environmental conditions on undulator gap control, energy and pointing stability. Temperature/Magnetic uniformity along magnet arrays Vacuum, Impedance, and beam dynamics issues associated with variable magnet gap to beam tube transitions and large chambers.

3-Meter In-vacuum CPMU based on X-25 Undulator Design NSLS X-25 Undulator We can extend experience gained from the Cryo-ready in-vacuum Undulator recently installed at X-25 to design the NSLSII CPMU’s. A long modern measurements bench and pulsed wire system in temperature- controlled clean room environment will be used for measurements and shimming. Concept for NSLS-II

Concept of an In-vacuum Cold Mapper for NSLSII CPMU’s In-vacuum Mapper with Hall probe in fully opened magnet gap Mapper mounted on custom flange cover.

Optical Micrometers will directly measure the Cold Magnet Gap to sub-micron accuracy Precision Gap Control in CPMU Measurement accuracy of ±1μm and resolution of ±0.1μm. Studies are currently underway to study the effects of environmental factors. Temperature feedback control may be implemented to the external Undulator structure

Undulator Impedance Issues Detailed modeling of the X-25 and NSLS II undulator cavities will be performed. If problems are observed during commissioning a feed back system will be implemented. Undulator transition impedances will be studied and low impedance transition designs will be implemented

Summary There are concerns regarding machine tolerances, damping wigglers and CPMUs. The important technical issues are well known and are being addressed.