1 44228-759-01 South County Reclaimed Water Partnership South County Reclaimed Water Partnership Palm Beach County Water Utilities Department Brian Shields,

Slides:



Advertisements
Similar presentations
SOUTH ORANGE COUNTY REGIONAL RECYCLED WATER Orange County Business Council Infrastructure Committee May 13, 2014.
Advertisements

Orange County Board of County Commissioners Water Conserv II Operations Contract Renewal Utilities Department August 23, 2011 Utilities Department August.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
STATUS OF CARLSBORG SEWER PROJECT Carlsborg Community Advisory Council Bob Martin June 6, 2013.
Volusia County’s Water Conservation Programs Presentation to The Blue Spring Working Group September 9, 2010.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION.
Martha Davis Inland Empire Utilities Agency April 8, 2010.
Reclaimed Water–A Sustainable Source for Florida’s Growing Water Needs Larry R. Parsons, Ph.D. Citrus Research & Education Center Lake Alfred Liz Felter.
CE Introduction to Surveying and Geographic Information Systems Donald J. Leone, Ph.D., P.E. eLearning Version Lecture 5.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
City of Savannah Water, the Lifeline of the Community.
Eric Hansen, P.E. Capital Planning Program CPUC Recycled Water Order Instituting Rulemaking (R ) San Francisco January 20, 2012 Workshop 3: Understanding.
Broward County-wide Master Reuse Plan
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption Hearing May 19, B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Everglades Land Acquisition Project Carol Ann Wehle SFWMD Executive Director.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Energizing Utilities to Embrace Demand Energizing Utilities to Embrace Demand Management South Florida Water Management District Water Summit December.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Rich Haller, P.E. Program Manager, Santa Ana Watershed Project Authority (SAWPA) April 2, 2004 Brine Disposal Strategies in Inland Southern California.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Water Conservation Regulatory Tools: Existing & Planned Marjorie G. Craig, P.E. Director, Water Supply Department South Florida Water Management District.
Everglades Land Acquisition Project Michael Sole - Carol Wehle - Dale Brill.
San Gabriel Valley Water Forum Mike Sullivan Monitoring Section Head, Los Angeles County Sanitation Districts x2801.
League of Cities and Towns August , 2015 Ensuring a Secure Water Future.
Orange County Landscaping and Water Conservation Ordinance Presented to: Orange County Board of County Commissioners June 23, 2009.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
MSSC 2011 Annual Salinity Summit February 17 – 18, 2011 Thirty Years of Success in Implementing Desalination By Roger K. Noack, P.E. HDR Engineering, Inc.
NARUC Presentation July 17, 2007 New York, New York Larry Schumacher President & Chief Executive Officer.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.
Mark Elsner Administrator, Water Supply Development Section Mark Elsner Administrator, Water Supply Development Section WateReuse Florida - Fit For A Purpose.
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY PETALUMA, CA North Bay Watershed Association Conference April 9, 2010.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.
RATE ANALYSIS FY FY 2019 March 6, 2014 CARSON VALLEY WATER UTILITY FUND 326 – DEPARTMENT 864.
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
Began funding reclaimed projects in projects funded 325 projects completed $435M leveraged $1 Billion 970 miles of pipelines 248 MGD reuse capacity.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
PALM BEACH COUNTY WATER UTILITIES DEPARTMENT
JEA’s Initiatives and Capital Improvements Program
Electrical Distribution Design Services
Water Reclamation Plant Feasibility Study Update May 28, 2014
Davie Green Water Project
Policy Principles for the Allocation of Recycled Water
STATEWIDE DROUGHT RESPONSE: IMPACT TO SOUTH ORANGE COUNTY
Citizens’ Academy Overview
Central Florida Water Resources And the Disney Approach
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
City of Sunrise Wastewater Reuse Program
Montgomery County Municipal Utility District No. 8 January 4, 2019
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
TAPPING THE WORLD OF POSSIBILITIES
August 30, 2019 Robert Beltran, PE , BCEE
Presentation transcript:

South County Reclaimed Water Partnership South County Reclaimed Water Partnership Palm Beach County Water Utilities Department Brian Shields, P.E.

Quick Overview of PBCWUD Serves 500,000 PBC residents (unincorporated area) Florida’s 3rd largest water/wastewater utility 6 water treatment plants mgd capacity 4 wastewater treatment plants – 59.5 mgd capacity 1,200 square mile service area 599 full-time employees Over $1.6B in assets 2

3

Raw Wastewater 4

Wetlands Deep Injection Wells - 36MGD SRWRF - 35 MGD Saving Water by Recycling Reuse - 22 MGD 5

SRWRF Reclaimed Maxed Out Atlantic Ave. Clint Moore Rd. Florida’s Turnpike SR - 7 US Jog Rd. Hagen Ranch Rd. Ranch Rd. Woolbright Rd. Linton Blvd. Atlantic Ave. Clint Moore Rd. Boynton Beach Blvd. N Westchester Golf Course Golf Course Sawgrass Lakes Enclave WakodahatcheeWetlands Lakeridge Cascades / Westchester Golf Course San Marco Indian Springs Golf Course Valencia Lakes Valencia Isles Villa Borghese Polo Trace Golf Course & PUD Golf Course & PUD Valencia Falls Falls Avalon Estates Spalding GleneaglesCountryClub Tivoli Reserve Lexington LexingtonClub Green Cay Wetlands GrandHaven Valencia Palms Palms Addison Reserve Tivoli Lakes Canyon Town Center Canyon Lakes Canyon Isles Canyon Springs Ascot Target Comm. The Grove Aberdeen Ponte Vecchio Palm Isles West Appolonia Farms The Oaks of Boca Raton St. Andrews County Club 15.5 MGD of Reclaimed water in Billion Gallons / year 6

Broward County has more Reclaimed Water than Customers A total of 16 potential large reclaimed water users have been identified for this project. Initially 11 are located in PBC. 7

PROPOSED RECLAIMED WATER TRANSMISSION MAIN

WIN - WIN Regional Project Concept Broward County: Legislative requirement to implement reuse by 2018 and eliminate Ocean Outfall by 2025 Legislative requirement to implement reuse by 2018 and eliminate Ocean Outfall by 2025 Limited reclaimed water demand Limited reclaimed water demand Palm Beach County: Heavy demand for reclaimed water in south PBC Heavy demand for reclaimed water in south PBC No reclaimed water currently available south of Clint Moore Rd. No reclaimed water currently available south of Clint Moore Rd. SFWMD : Project will Eliminate Over 20 MGD of groundwater irrigation Project will Eliminate Over 20 MGD of groundwater irrigation Billion gallons per year

Proposed Schedule  BCC Workshop – August 27, 2013 BCC directed staff to negotiate Agreement with Broward County  Broward County will execute Inter-local Agreement – April, 2014  Palm Beach County will execute Inter-local Agreement – June, 2014  Begin design of distribution system – Mid 2014  Construction of first phase – Mid MGD ADF by 2016 & 10 MGD ADF by 2023

Thank you! Thank You!