Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
CHAPTER 17 Project Management.
Chapter 17: Learning Objectives
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
pert and cpm ch 9 Learning objectives:
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
18-1Project Management Chapter 18 Project Management.
Project Scheduling: Networks, Duration Estimation, and Critical Path
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Operations Management
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Operations and Supply Chain Management, 8th Edition
Project Management Techniques.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
PROJECT MANAGEMENT PART SIX Chapter Eighteen Project Management.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Lecture 4 Project Management Chapter 17.
Roberta Russell & Bernard W. Taylor, III
Project Management Chapter 17.
Project Management © Wiley 2007.
Project Management Chapter 17.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Operations Management
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Project Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
18-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
17 Project Management Homework; 1b, 4b, 5b, Sup1, Sup2.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Chapter 16 – Project Management
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management Chapter Topics
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PART SIX PROJECT MANAGEMENT Chapter Eighteen Project Management.
17 Project Management.
PROJECT MANAGEMENT WITH CPM/PERT.
17 Project Management.
Project Planning and Budgeting
Stevenson 17 Project Management.
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
Presentation transcript:

Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.

17-2 You should be able to: LO 17.1Describe the project life cycle LO 17.2Discuss the behavioral aspects of projects in terms of project personnel and the project manager LO 17.3Explain the nature and importance of a work breakdown structure in project management LO 17.4Name the six key decisions in project management LO 17.5Give a general description of PERT/CPM techniques LO 17.6Construct simple network diagrams LO 17.7Analyze networks with deterministic times LO 17.8Analyze networks with probabilistic times LO 17.9Describe activity ‘crashing’ and solve typical problems LO 17.10Discuss the advantages of using PERT and potential sources of error LO 17.11Discuss the key steps in risk management

Initiating 2. Planning 3. Executing 4. Monitoring and Controlling 5. Closing LO 17.1

17-4 Behavioral problems can be created or exacerbated by Decentralized decision making Stress of achieving project milestones on time and within budget Surprises The team must be able to function as a unit Interpersonal and coping skills are very important Conflict resolution and negotiation can be an important part of a project manager’s job LO 17.2

17-5 WBS A hierarchical listing of what must be done during a project Establishes a logical framework for identifying the required activities for the project 1. Identify the major elements of the project 2. Identify the major supporting activities for each of the major elements 3. Break down each major supporting activity into a list of the activities that will be needed to accomplish it LO 17.3

17-6 Project success depends upon making key managerial decisions over a sequence of steps: Deciding which projects to implement Selecting the project manager Selecting the project team Planning and designing the project Managing and controlling project resources Deciding if and when a project should be terminated LO 17.4

17-7 PERT (program evaluation and review technique) and CPM (critical path method) are two techniques used to manage large-scale projects By using PERT or CPM Managers can obtain: 1. A graphical display of project activities 2. An estimate of how long the project will take 3. An indication of which activities are most critical to timely project completion 4. An indication of how long any activity can be delayed without delaying the project LO 17.5

17-8 Network diagram Diagram of project activities that shows sequential relationships by use of arrows and nodes Activity on arrow (AOA) Network diagram convention in which arrows designate activities Activity on node (AON) Network convention in which nodes designate activities Activities Project steps that consume resources and/or time Events The starting and finishing of activities LO 17.6

17-9 Finding ES and EF involves a forward pass through the network diagram Early start (ES) The earliest time an activity can start Assumes all preceding activities start as early as possible For nodes with one entering arrow ES = EF of the entering arrow For activities leaving nodes with multiple entering arrows ES = the largest of the largest entering EF Early finish (EF) The earliest time an activity can finish EF = ES + t LO 17.7

17-10 Finding LS and LF involves a backward pass through the network diagram Late Start (LS) The latest time the activity can start and not delay the project The latest starting time for each activity is equal to its latest finishing time minus its expected duration: LS = LF - t Late Finish (LF) The latest time the activity can finish and not delay the project For nodes with one leaving arrow, LF for nodes entering that node equals the LS of the leaving arrow For nodes with multiple leaving arrows, LF for arrows entering node equals the smallest of the leaving arrows LO 17.7

17-11 Slack can be computed one of two ways: Slack = LS – ES Slack = LF – EF Critical path The critical path is indicated by the activities with zero slack LO 17.7

17-12 The beta distribution is generally used to describe the inherent variability in time estimates The probabilistic approach involves three time estimates: Optimistic time, (t o ) The length of time required under optimal conditions Pessimistic time, (t p ) The length of time required under the worst conditions Most likely time, (t m ) The most probable length of time required LO 17.8

17-13 Crashing Shortening activity durations Typically, involves the use of additional funds to support additional personnel or more efficient equipment, and the relaxing of some work specifications The project duration may be shortened by increasing direct expenses, thereby realizing savings in indirect project costs LO 17.9

17-14 Among the most useful features of PERT: 1. It forces the manager to organize and quantify available information and to identify where additional information is needed 2. It provides the a graphic display of the project and its major activities 3. It identifies a. Activities that should be closely watched b. Activities that have slack time LO 17.10

17-15 Good risk management involves Identifying as many risks as possible Analyzing and assessing those risks Working to minimize the probability of their occurrence Establishing contingency plans and budgets for dealing with any that do occur LO 17.11