1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Advertisements

June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
ERCOT Nodal Protocols Telemetry Requirements Proposal
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
Texas Nodal 1 Nodal Telemetry Outreach and Recent Changes to Focused Input Testing (FIT) NATF Sep 29, 2009 Stacy Bridges, ERCOT.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
July 9, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
1 1 TPTF Review of Nodal Program Schedule Readiness to Send Schedule to TAC January 13, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
TPTF Meeting Texas Nodal Program Update Market Readiness Metrics Update Chris Wilkinson PMO.
Lead from the front Texas Nodal 1 Registration and RARF Update to TPTF August 27, 2007.
1 Nodal Single Entry Model (SEM) Go-Live WMS Update May 18, 2009.
EDS 1 Early Delivery Systems Testing Preparation WebEx Meeting Jonathan Pulcini - EDS 1 John Webb - EDS 1 Ken Kasparian - EDS 3 Bill Blevins - EMS Frank.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
January 15, 2008 Monthly Board of Directors Meeting Texas Nodal Market Implementation Program Update Jerry Sullivan.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Network Model Management System (NMMS)
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call May 30, 2008.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call June 20, 2008.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 02, 2007.
1 Readiness Scorecard – May ‘10 NATF Brandon McElfresh Nodal Readiness and Transition May 4, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
1 Market Trials Update NATF May 4, 2010.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Market Redesign Update ERCOT Board of Directors Meeting April 18, 2006 Ron Hinsley Chief Information Officer
Lead from the front Texas Nodal 1 Texas Nodal EDS 4 Early Delivery System Plan TPTF May 22 nd, 2007.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
April 1, 2008 TPTF Texas Nodal Market Implementation Program Update Jerry Sullivan.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
1 Market Trials Real-Time Market / LFC Weekly Update March 26, 2010.
1Texas Nodal NATF Readiness Update Vikki Gates May 4, 2010.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Feb 06, 2009.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Lead from the front Texas Nodal 1 Texas Nodal Registration meeting- RARF Question &Answer Matt Mereness August 9 th, 2007.
1 Market Trials Update NATF January 5, 2010.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
1 Readiness Scorecard – Market Readiness Series Brandon McElfresh Nodal Readiness and Transition January 28, 2010.
The Texas Nodal Market Trip Doggett ERCOT Interim President and Chief Executive Officer Mike Cleary ERCOT Chief Technology Officer Executive Briefing 28.
EDS 2 Early Delivery Systems Approach March 2007.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Market Trials Update NATF March 2,
Texas Nodal Program Current Schedule and Recent Changes
Presentation transcript:

1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007

2Texas Nodal Agenda Market Trials Objectives EDS Phases, Timeline & Definitions Progress to Date Data & Telemetry Verification

3Texas Nodal Objective of market trials The objective of market trials is to confirm through a series of structured and unstructured tests that: “stable and accurate operations of the SCADA, Network Security Analysis, Transmission Constraint Management, SCED, LFC, DAM, RUC, and real time settlement system can be declared” as outlined in the Nodal Transition Plan.

4Texas Nodal Market Trials Phases EDS 1 – Data and Telemetry EDS 2 – State Estimator, Network Security Analysis EDS 3 – Real Time Market Operations EDS 4 – Day Ahead Market Operations

5Texas Nodal EDS - Market Trials Timeline EDS 3 Jul 08 Dec 08 Sep 08Aug 08Mar 08Feb 08Jan 08May 08Jun 08Dec 07Oct 08Nov 08Apr 08 Cycle 1 LMP w Controls ACE DR Testing Compliance 1 hr EECP Comment Period ACE – 2 weeks (5.4.8 (2) Compare existing with new ACE results LMP Market Readiness Criteria MET 12/01/08 Realtime Markets GO LIVE ` 12/08/08 Forward Markets GO LIVE Zonal Markets Shutdown GO/NO GO Nov 07 Market Operations Sandbox & ERCOT UAT Market Trials Start Resource Registration All QSEs – Real Time Parallel Operations AS Qualification 3/31/08 Single Entry Model GO LIVE Reasonable LMPs 24x7 support All available MPs Reasonableness criteria met 6 months Oct 07 EDS 4 Feedback 168 hour test complete 168 Hour Test – 4 weeks to complete; 4 week feedback-fix 168 hour trial Go-Live & Transition Jul 07Sep 07Aug 07 May 07Jun 07 ICCP / Telemetry Validation SE Validation SCED testing cycles, voluntary per QSE scripted for 30 days Thereafter all QSEs participate in real time parallel operations EDS 2 EDS 1 Market Operations Sandbox & ERCOT UAT EDS 4 - Day Ahead Operations Limited 24x7 supportFull 24x7 support Market Operations Functional Testing

6Texas Nodal EDS Market Trials Definition Schedule Request comments on Market Trials Approach by 12/13/06 Return for approval on January 25th Begin EDS detailed planning providing opportunities for comments as follows: –Review Transition Plan Traceability MatrixTBD –EDS 1 to 4 Detailed Plan – Drafts for commentTBD –EDS 1 Detailed Plan – Final SignoffTBD –EDS 2 Detailed Plan – Final SignoffTBD –EDS 3 Detailed Plan – Final Signoff3/30/2007 –EDS 3 Market Trials Handbook – Final Signoff6/29/2007 –EDS 4 Detailed Plan – Final Signoff9/28/2007 –EDS 4 Market Trials Handbook – Final Signoff12/31/2007

7Texas Nodal EDS Detailed Planning EDSDescriptionTransition Plan Requirement Operations / SoSAMarket Trials tasksMP Interventions Notes 1Telemetry & ICCP Validation 5.4.1(2) ERCOT shall develop procedures for setup and data implementation requirements applicable to TSP’s and QSE’s. ERCOT shall with the assistance of TSP’s and QSE’s: (a) Verify that all data and telemetry requirements Specified in the nodal Protocols Section 3.10, Network Operations Modeling and Telemetry, Have been met and that all Data submittals are complete and represent an accurate model of the ERCOT System; - S.UC1.OP6: Update QSE Provider Information (EMS Operation) - S.UC1.OP7: Use Revised Data (EMS Operation) - S.UC1.OP8: Use Telemetry Data (EMS Operation) - S.UC2.OP1: Update RT Generation/Transmission Data (EMS Operation) - S.UC2.OP2: Update Transmission Ratings (EMS Operation) ICCP information TO the field (external): - S.UC2.OP4: Send Base Points - M.UC12.OP1: Clear RT Market (I know Base Points are communicated to QSE’s via ICCP, will need to check which other ones do) All telemetry (SCADA/ICCP) points checked out (programmatically or manually) 100 % Status Report at the end of this activity must indicate that 100 % of all points have been tested and verified Require Professional Engineers Seal from Entities to assure accuracy of data. Can be required from QSE’s/TSP’s due to issues of public safety and public interest Alarm Functionality Revalidated SCADA/ICCP enhancement to detect Forced Outage of equipment Real Time Weather Telemetry revalidated Dynamic Rating telemetry Validate all Transmission Element Limits and Constraints Check TSP’s calculation Transmission Element Ratings that are likely to be active in SCED Telemetry Criteria Developed (protocol ) Define and implement business processes to repair errors – Preliminary MP Interface Specs – Final Interface Specs This is a joint ERCOT and Market Participant task. Will require a EDS type functionality from TSP/QSE QSE/TSP personnel can SIMULATE analog/digital changes on their EDS and ERCOT EDS will be able to accomplish point-to-point check out with ERCOT operators Explore programmatic way to validate – this approach can be used later for periodic verification. 2Network Model Validation SE Solution 3Real-time Market Operations 4Day ahead Market Operations Define Transition Plan Traceability Matrix

8Texas Nodal Data and Telemetry Verification Transition Plan Detail: –5.4.1(2a) ERCOT shall develop procedures for setup and data implementation requirements applicable to TSPs and QSEs. ERCOT shall with the assistance of TSPs and QSEs: Verify that all data and telemetry requirements specified in the nodal Protocols Section 3.10, Network Operations Modeling and Telemetry, have been met and that all data submittals are complete and represent an accurate model of the ERCOT System Why? –Reasonable and accurate LMPs require accurate telemetry and model data. –ERCOT needs to demonstrate the continual accuracy of both the telemetry and network model data How can this be achieved? –Demonstrate compliance with Telemetry Criteria –Demonstrate compliance with SE Criteria –Verify end to end communication and mapping of SCADA data Are there other approaches?

9Texas Nodal NMT – Network Operations Modeling & Telemetry – Project Model Data Issues Progress by MP – as of 12/22/2006 Note 1: Blank indicates MPs that ERCOT has not contacted to date Note 2: NMT inherited ~400 legacy model issues

10Texas Nodal Transducer (kWh) RTU Analog Status Accumulator Equipment Statuses Scaling TSP & QSE EMS SCADA ICCP ERCOT SCADA Phone Lines ICCP Link One-line Displays Mapping to network model ERCOT Quality codes PT CT QSE/TSP data accuracy assurance points ERCOT data accuracy assurance points A C B D E F G HIK M L SCADA Telemetry Schematic SegmentCertification RequirementNotes A to HTo be certified by MPs H to ITo be certified by TBD (3rd Party ?) I to NTo be certified by ERCOT J Quality codes posted by TSP N ERCOT EDS scope  Draft appropriate attestation so that accuracy and mapping from A to H can be verified by MPs without unnecessary verification rework.  Draft appropriate attestation so that accuracy and mapping from I to N can be verified by ERCOT within unnecessary verification rework

11Texas Nodal Questions?