Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status Update on Mechanical Prototype in Rome November 6,
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Status ‘Si readout’ TPC at NIKHEF NIKHEFAuke-Pieter Colijn Alessandro Fornaini Harry van der Graaf Peter Kluit Jan Timmermans Jan Visschers Saclay CEA.
Readout of a TPC with the MEDIPIX2 CMOS chip as direct anode Saclay/DapniaP. Colas Y. Giomataris NIKHEFA. Fornaini H. van der Graaf J. Timmermans J. Visschers.
The RASNIK Alignment System. Particle Physics CERN, Geneva, Swiss.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
T.Schneider/LHCb Muon EDR
Timepix-3 test All-ceramic InGrid The focusing TPC
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
An Integrated Single Electron Readout System for the TESLA TPC Ton Boerkamp Alessandro Fornaini Wim Gotink Harry van der Graaf Dimitri John Joop Rovekamp.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
21 April 2004LCWS 2004 Paris1 Readout of a TPC using the Medipix2 CMOS pixel sensor (detection of single electrons on a direct pixel segmented anode) NIKHEF:
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
ATLAS micromegas activities (MAMMA)
you me  when it all started to work  progress made  outlook.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
Micromegas for the ATLAS upgrade (MAMMA) Status report
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas, E.Ferrer-Ribas, Ch.Flouzat, J.Galan, W.Gamache, A.Giganon, P-F.Giraud, P.Graffin,
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
DUNE APA Overview for SBND Synergy Discussion Lee Greenler University of Wisconsin Physical Sciences Lab September 2, 2015.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
BM&N STS ladders assembly in VLHEP
Update on Pavia MM mechanical prototype
nSW Alignment Installation
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
Presentation transcript:

Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose to construct the monolayers such that: -they are sufficiently strong, rigid, stiff, and gas tight that they can be manipulated, transported, fully tested, stored, and approved or rejected; -The thickness (height) of a monolayer has a tight tolerance of 5 μm; -Each monolayer has (X,Y) reference markings to the strips, in up to four corners; -monolayers can consist of more than one AB or CB board, allowing arbitrary larger sizes; -The monolayers can be assembled by all possible means (glueing, external clamping frames, through-going bolts, nylon wire stitching).

Essential construction element: the monolayer Monolayer material minimalisation: only AB, CB, drift spacers and seal strips at edges -Monolayer is glued together and is NOT repairable; -does not deform under gas pressure; -has a precise height (thickness): var < 5 μm; -allows the thinnest possible (low cost, good thickness precision) pcb’s (R&D); -drift spacers in gas (drift) volume: ~100 pcs per m 2 (R&D)) such that: -small dead surface for track detection; -drift spacer induced discharges: should not occur (R&D).

Any table Monolayer assembly step 1 Spacers on Cathode Boards (CBs) -non-precision spacer: -height: 4.70 mm (mold injection) for 5 mm drift gap -dia. 5 mm -optional: hollow cylinder: wall thickness 0.8 mm: allows assembly by layer stitching -Spacer pitch: square pattern, pitch 100 – 200 mm (R&D) -Cathode Boards (CB): single sided (segmented) Cu Thickness tolerances: subject of (R&D) -Tool (template) for rapid positioning of spacers -Apply UV curing glue (check ageing effects(R&D))

DriftSpacer Application Tool Use UV curing glue, cured by UV LEDs (ageing tests R&D) apply 100 spacers on CB in 30 minutes per m 2 Any table UV-LED Spring (cushion) O-ring CB Ref

any table Resistive silk screen printing on Anode Board (AB) Photoresist Avalanche Gap Pillars + DriftSpacer Pedestals AB + photoresist pillars

any table Mesh on Anode Board Mesh-in-frame

Preparation (in design) of the Anode Boards (ABs): AB (0.8 – 1.0 mm) Micromegas Micromegas support (photo resist) Pedestal for spacer dia. 5 mm

Granite flat table Construction of monolayers CB + spacers + edge gas seals AB + pillars + pedestals Bridge: assembly of straight edges + CB board suckers

Granite flat table Construction of monolayers Gauge blocks: define thickness monolayer (σ < 5 μm) Gas seals at edges: undersized, glue sealed

Mesh fixation in plane Plane Edge Seal Edge dyke DriftSpacerPedestal DriftSpacer Epoxy Glue AB board CB board

The effect of thickness variations in the AB and CB pcb’s Muon ABCB COG of primary ionisation charge We measure the COG of the primary charge of the muon track in the gas-filled drift volume. This point is displaced in Z and read-out by the strips. As a consequence, the COG (Z) of the drift volume causes an error dZ. sin (α) in ‘R’. Since the distance between the outside planes of the AB and CB boards is precise, the thickness variation of both boards comes in: equal variation (i.e. both too thick by the same amount) cancels the error in the gas layer COG. dZ α

Strategy for tolerance on Z (COG) of drift volume -a solid MonteCarlo simulation including diffusion (significant at large drift distance) with dR/dZ as a function of the radial distance as result; -a systematical study of the thickness variations of commercial pcb’s in terms of thickness, batch, position on board (edges, corners) -Selection of boards: combining selected AB and CB boards for chamber sections -at large radial distance.

Two tools are required for the production of monolayers: Tool 1: granite table with thick vacuum sucker sections to permit doubling pieces; Tool 2: bridge to keep top plane of (assembly of) CB boards in plane within 5 μm.

Granite flat table Tool 1: granite table with sucking fixators Large monolayers (combination of 2 or more ABs): Glue strip ends together with (permanent) aux. joint plate (doubling piece) interconnect (wire bond) strips The pattern of the sucking pad’s leaves space for the doubling pieces The sucking pads have a precise height (thickness) ~ 3 μm (mesh + Si rubber) sucking pad AB CB doubling piece

Tool 2: bridge to keep top plane of CB boards in plane within 5 μm Carbon fiber frame The Bridge is an assembly of straight edges with spacing equal to the pitch of the drift spacers (~ 100 mm).

Granite flat table Fix sucking pads (= Y ref) at bottom of straight edge by means of flat table. Elimination of non-flatness of granite table! Sucking pads

Granite flat table straight edges Pitch equals drift spacer pitch lifting mount

Granite flat table Construction of bi-layers (doublets) Assembly of: -two monolayers -spacer: -could be (interconnected) bi-spacers (same X,Y position as in monolayer) -could be (machined) honeycomb -could be polyester wire (1.000 mm dia). -Height verification after assembly CB AB CB

(X,Y) alignment of Anode Boards (AB’s): Idea of Saclay: Rasnik code in Cu at upper and lower edges

Granite flat table Construction of quadlayers Assembly of: -two duallayers -quad spacer: -could be interconnected spacers -could be (machined) honeycomb -could be plastic wire Height verification after assembly

Spacer (stiffback, cross plate, longbeam, InPlane Rasnik systems) Quad layer Granite flat table Construction of chamber stations Assembly of: -two quadlayers -spacer: -made from G10 plates, bars, profiles -has 3 or more external temporally references: only precise in length (height). -includes Rasnik InPlane system (2 cams, 4 diff. plates, 4 light sources) readout during construction (calibration: ‘straight’ values).

USB Pixel CMOS chip (taken out 10 $ webcam) Diffraction Plate lasers (out of pointer!)Readout USB webcam: any processor

Quad layer Granite flat table Construction of chamber stations: fixing the 2 nd quad layer Quad layer Spacer (stiffback, cross plate, longbeam, InPlane Rasnik systems)

Granite flat table Alignment of Micromegas PCB (AB): - Integrate Rasnik mask in Cu of all ABs: -Record (X,Y) positions in each corner (4x) by means of 4 cam’s -adjust (X,Y) position of each corner by means of (X,Y) actuator at each corner, at each monolayer -Also Z values can be measured (quality control)! Cam Actuator