1 Case Study: Performance-oriented budgeting in Slovenia – Achievements so far and obstacles encountered Mateja Bizilj Ministry of Finance, Slovenia Tbilisi,

Slides:



Advertisements
Similar presentations
MTEF BUDGET PROCESS – A TOOL FOR MAINSTREAMING MDGS
Advertisements

Improving Budgetary Outcomes
1 Mateja Bizilj PEMPAL BCOP KEY CONCEPTS AND APPROACHES TO PROGRAMS AND PERFORMANCE Tbilisi, June 28, 2007.
KYRGYZ REPUBLIC Programmatic Public Expenditure Review Monitoring and Evaluation The MOF/Donor Workshop on PPER Bishkek, September 26, 2005.
Challenging the Budget Creating Incentives for Results Rwandas Experience Elias Baingana - Budget Director.
Ch Financial Control PIFC in Iceland
Financial Reforms and Accountability in Albania Presented by Dr. Sherefedin Shehu MP, Budget & Finance Committee, Albania International Symposium on the.
ICGFM 19th Annual Conference & Training; May 2005 Miami, Florida (USA) Public Sector in Bosnia and Herzegovina ENHANCEMENT OF INTERNAL CONTROL SYSTEMS.
PUBLIC SECTOR INTERNAL AUDIT IN THE REPUBLIC OF LITHUANIA Mr. Jonas Vaitkevičius Head of Internal Audit and Financial Control Methodology and Monitoring.
Liberia – Duke University Program PFM reform strategy Duncan Last Public Financial Management Division March 4, 2011.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Report presented by Working Group 1 on the capacity development plan to implement CDM in Viet Nam Task 1 : 1.1. Duration: to January Expected.
PAD190 PRINCIPLES OF PUBLIC ADMINISTRATION
DEVELOPMENT OF THE NATIONAL INVENTORY SYSTEM IN THE REPUBLIC OF BELARUS Belarus has signed UNFCCC in June, 1992 Ratified in May, 2000.
The Current State and Future Development of Ukrainian Rural Development Policy Rural Development Department, Ukrainian Ministry of Agrarian Policy, June16,
Establishment and Development of the Internal Audit System for the Public Sector in Kyrgyz Republic INTERNAL AUDIT COMMUNITY OF PRACTICE ISTANBUL
0 Kestutis Rekerta Strategic Planning Division, Government Office of Lithuania World Bank Workshop, Bratislava, September 6, 2006 STRATEGIC PLANNING IN.
1 Ministry of Education Budget Execution March 28, 2010 As of.
1 Budgeting in Greece Presentation at the annual meeting of Senior Budget Officials, Vienna, June 2008 Ian Hawkesworth, Budgeting and Public Expenditures.
The Issues of Budgetary Reform Unit 3. PFM Reform – Change Management Module 3.2. Preparing and managing a reform programme.
L&R Social Research The Implementation of Gender Budgeting in Austria Lessons Learned from Existing Initiatives Peter Prenner & Claudia Sorger L&R Social.
Republic of Slovenia Ministry of Finance Ministry of Finance Budget Supervision Office of the Republic of Slovenia 1 Miran Gostiša Ljubljana, 27th January.
STATE TREASORY DEVELOPMENT STRATEGY Ministry of Finance Republic of Croatia.
Governmental Financial Reporting Public Sector Accounting Reform in Slovakia Peter Ivánek Ministry of Finance of the Slovak Republic PEMPAL Treasury CoP.
The Role of Parliament in the budget process. Overview Actors in the budget process Stages in the budget process Budgeting for the medium term.
Open Budget Initiative 2006 Slovenia dr. Mitja Čok.
The Budget Process A simplified and generalized summary of budgeting in the public sector. Political Dynamics Actors in the budget process Stages in the.
Fiscal Policy Audit – National Audit Office of Finland Hannu Rajamäki Director for Performance Audit NAO of Finland.
PLAN AND BUDGET COMMITTEE AND THE OVERALL BUDGET PROCESS Yüksel KARADENİZ Legislative Expert.
Reforming civil service in the Baltic States: the Case of Lithuania Jurgita Siugzdiniene, PhD Department of Public Administration, Kaunas University of.
Medium Term Budgeting Ilonda Stepanova Director Budget Department Ministry of Finance April 8, 2008.
CHAPTER V Health Information. Updates on new legislation (1)  Decision No.1605/2010/QĐ-TTg approving the National Program for Application of information.
Dr. GÁBOR PÓSCH State Audit Office Hungary Rural Credit Guarantee Schemes Budapest, January STATE GUARANTEES IN HUNGARY.
1 Performance elements in budget and reporting process - Norway 5TH ANNUAL MEETING OF OECD SENIOR BUDGET OFFICIALS NETWORK ON PERFORMANCE&RESULTS – 28.
1 AN INTRODUCTION TO THE DEPARTMENT BUDGET MANAGEMENT REFORM OF CENTRAL GOVERNMENT Guifeng LIN Deputy Director-General, Department of Budget, Ministry.
Towards the Creation of the Economic Census in Japan Shozo INAMI Statistical Research and Training Institute Ministry of Internal Affairs and Communications.
1 Budget review Croatia Second meeting of Senior Budget Officials from Central, Eastern, and South-Eastern European Countries Ljubljana February.
Survey Results PEMPAL Budget Community of Practice Tbilisi, Georgia.
National Information Communication Technologies Strategy Vasif Khalafov “National strategy” working group - Web -
Collaborative Africa Budget Reform Seminar Budget Reform in Mauritius
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial control Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial Control Bilateral screening:
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
REPUBLIC OF BULGARIA MINISTRY OF FINANCE CURRENT CHALLENGES IN BUDGET REFORM SOFIAMR. LYUBOMIR DATZOV 03 DECEMBER 2004DEPUTY MINISTER
1 STRATEGIC PLANNING AND BUDGET PRIORITISATION IN CROATIA Francois-Roger Cazala, Rimantas Veckys SIGMA - Lithuanian Ministry of Finance.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
Financial Management and Control in the Dutch Public Sector Prague, March 24, 2016 Manfred van Kesteren.
REPUBLIKA SLOVENIJA MINISTRSTVO ZA FINANCE 1 PLANNING WAGE BILL EXPENDITURES Saša Jazbec, Director General / Budget Directorate Ministry of Finance Ljubljana,
M O N T E N E G R O Negotiating Team for Accession of Montenegro to the European Union Working Group for Chapter 18 – Statistics Bilateral screening: Chapter.
Kishinev 2016 MINISTRY OF FINANCE OF THE REPUBLIC OF TAJIKISTAN.
Quality assessment of internal audit activities performed on a periodical basis Nikolina Bibić, Ministry of Finance, Central Harmonization Unit Republic.
OVER VIEW OF PUBLIC FINANCE REFORMS IN ETHIOPIA
Treasury of the Republic of Kazakhstan
SUPREME AUDIT OFFICE OF POLAND
strengthening the elements of governance in Tajikistan
Budget Monitoring and Evaluation
Public Sector Accounting and Reporting Reform
THE STATE TREASURY OF THE REPUBLIC OF CROATIA
GOOD PRACTICES AND REFORM OF PUBLIC ADMINISTRATION
“Support for reforms in budget and finance policy fields”
Kari Kiesiläinen Heikki Liljeroos
PEMPAL, Moscow, October 2016 Natalia Pilets Deputy Head,
Medium-Term Expenditure Framework: Lessons
The role of the Passport Indicators in Monitoring PFM Strategy
Developments And Achievements In Implementing Public Internal Financial Control (PIFC) Reform In Armenia EDGAR MKRTCHYAN, PhD Chairman of Executive Committee.
Sybi Hida ALBANIA February, 2005
Sybi Hida ALBANIA February, 2005
Institutions of Budget Execution: Rules and Roles
Ministry of National Economy of The Republic of Kazakhstan
Presentation transcript:

1 Case Study: Performance-oriented budgeting in Slovenia – Achievements so far and obstacles encountered Mateja Bizilj Ministry of Finance, Slovenia Tbilisi, June

2 Background The economic classification, harmonized with GFS 1986, was introduced in year 1999 for the state budget and local budgets. In year 2000, the unified economic classification was introduced for the whole general government sector. The basic unit of budget planning and execution was the budget item which presents a mix of economic and program classifications. The structure of budget was the following:

3 BUDGET ITEM ECONOMIC CLASSIFICATION

4 Introduction of program classification We started to establish program classification in First pilot ministry was Ministry of Economy. Starting point for design of program classification:  COFOG functional classification,  Swedish model (twinning with Swedish Ministry of Finance),  connection of program classification with committees in parliament.

5 Before introduction of program classification we introduced groups of budget items. This approach was used only for year Groups of budget items: 1 – Management and administration 2 – Financing of public services 3 – Programs 4 – Public Debt Management, Interest, Reserves Each budget item was classified in one of these four groups of budget items.

6 After half a year work with the Ministry of Economy, ministry lost interest in program budgeting and did not want to cooperate with Budget Department anymore. New initiative: January we started again with the following pilot ministries:  Ministry of Education and Sport  Ministry of Transport and Communications  Ministry of Agriculture, Forestry and Food  Ministry of Environment and Spatial planning  Ministry of Finance We used bottom-up approach with pilot ministries.

7 Planned approach: 1.Detailed examination of all activities and projects of the ministry 2.Classification of these activities according to functional classification 3.Establish the mission of the Ministry 4.Establish the set of programs that fit the mission of the ministry 5.Define the objectives of each program

8 Planned Approach 6. Describe each program 7. Associate activities and projects to each program 8. Review all activities and projects which do not fit into one program 9. Establish target outputs for each activity and project 10. Establish inputs required for each activity and project (financial and physical 11. Prepare a draft budget layout for the agreed program structure

9 We found out that this approach is too time consuming. Finally, MoF defined expenditure areas and main programs. Line ministries were obliged to define subprograms. The consequence of program classification was decreasing of number of line ministries. In May 2000, we issued a Decree on functional-program classification for the expenses of the state budget. Budget for 2001 was prepared using new classification.

10 Characteristics of program classification: We defined 23 expenditure areas and 95 main programs. Expenditure areas and main programs were published in the Official Gazette. Subprograms were published in budget circular. Expenditure area and main program can be implemented by more line ministries (multi-ministerial). A subprogram can be implemented by only one line ministry. Administrative expenditures (salaries …) are gathered in administration subprograms.

11 EXPENDITURE AREA MAIN PROGRAMS SUBPROGRAMS ACTIVITES PROJECTS Structure of program classification: Activities and projects were not (yet) introduced as part of program classification. Two-digit code Four-digit code Eight-digit code

12 Example: 11 AGRICULTURE, FORESTRY AND FISHERIES 1102 Agriculture and food quality reform Market stabilization Measures (market-price policy) Agricultural-environment programs Restructuring agriculture and food industry Rural development

– Business development stimulation Structure of subprogram: Expenditure area Main programLine ministry Serial number of subprogram

14 Structure of budget: PROGRAM CLASSIFICATION BUDGET ITEM ECONOMIC CLASSIFICATION

15 Problems at introducing program classification: Line ministries wanted to establish subprograms which would reflect economic and not program classification (for example: investments into hospitals etc.). Line ministries wanted the program classification by institutions (each line ministry would have its own main program or expenditure area). MoF wanted the Government to approve the list of coordinators (responsible for performance) of expenditure areas and main programs. This is important where more line ministries are implementing the program. The list of coordinators was never approved.

16 EXPLANATION 2001EXPLANATION 2007 EXPENDITURE AREA Description of expenditure area, mission of line ministry Key targets of expenditure area (from the documents of long term development planning / Annual targets and indicators to measure the achievement of targets / Documents of long term development planning MAIN PROGRAM Description of main program Long term targets of main program Annual targets and indicators to measure the achievement of targets / List of subprograms and line ministries inside the main program Structure of explanation of the budget:

17 EXPLANATION 2001EXPLANATION 2007 SUBPROGRAM Description of subprogram Long term targets of subprogramLong term targets of subprogram and indicators to measure the achievement of targets Legal basis Annual targets and indicators to measure the achievement of targets BUDGET ITEM Description of activities inside the budget item List of projects inside the budget item Starting-point for the proposal of appropriations PROJECT Purpose and targets of the project State of the project and planned development in next budgetary period Structure of explanation in final account is the same!

18 Court of Audit From year 2003 on,the Court of Audit, in the framework of auditing the final account of the state budget, estimates planning and reporting on targets and indicators for selected subprograms. The findings of the Court of Auditors:  planned targets and indicators are not concrete or clearly defined,  indicators have no expected value,  hierarchy of targets is not comprehensive ( heterogeneous subprograms),  the most critical points of performance budgeting are definition of targets, measurement of targets and reporting about results.

19 In 2004, Court of Audit made an estimation of the correctness and efficiency of implementation of 18 selected subprograms. The estimation was made in the following:  correct and efficient planning,  correct and efficient implementation,  correct, appropriate and sufficient reporting on achieved objectives and results. Source of data: Court of Audit, presentation by Mira Bitenc

20 Development from year 2004 on In year 2005, the Government established working group for the development of performance budgeting, with defined tasks until the end of year MoF had discussions with Ministry of Education and Sport, Ministry of Labor, Family and Social Affairs, Ministry of Agriculture, Forestry and Food and Ministry of Environment and Spatial Planning, to improve performance information. Some changes in the program classification were made. MoF prepared new instructions for defining objectives and indicators. In year 2005, MoF organized brief training for line ministries. The program classification was introduced for local governments.

21 Current situation Discussions with selected ministries stopped. Line ministries seem unwilling to cooperate in detailed discussions on how to strengthen the performance orientation. Sometimes program classification is not the best for classifying projects. We do not use the performance information in the budget preparation process at all. The work of working group stopped.

22 Future direction Explicit engagement of the Cabinet in the continuation of the reform. To prepare a realistic action plan. To motivate the line ministries and MoF staff to strengthen work on performance budgeting. To develop the IT support needed for monitoring indicators.