Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)

Slides:



Advertisements
Similar presentations
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Advertisements

Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
G2P Target installation and Beyond. Schedule Pivot before.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
CRYOGENICS AND POWERING
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Heat load study of cryomodule in STF
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
ON / OFF SD16 CX05 SD11 SD05 CX06 SD12 SD06 CX07 SD13 SD07 CX08 SD27 SD01 CX09 SD15 SD03 SD10 Stable operation Temperature Monitoring and Heater / Pressure.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
S A Griffiths CM42 June 2015 Electrical & Control.
Overview of Instrumentation and data acquisition system of cryogenic sub-systems of SST-1 D. Sonara, R. Panchal, R. Patel, G. Mehsuria,
MICE Absorber and Focus Coil Magnet – Test Results
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
MICE Meeting at RAL, Oct-23, 2005
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
TEMPERATURE SENSOR LOCATIONS
MICE Coupling Coil Update
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Instrumentation
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)

Instrumentation –Senors Silicon Diode and Cernox with the bobbin style termination. Cernox placed at 4K surfaces on the Helium chamber and 2 nd stage of the cryo coolers Silicon Diode placed on all 77K surfaces and at the 1 st stage of the cryo coolers For the 77K shield bore flush mount LR type Silicon Diode sensors have been used. –Heaters Heater pack on the fill line at the lowest point to boil off excess LN2 during pre-cool Heater pack on the bottom surface of the Helium chamber to be used as a pressure raiser. Each heater pack has a Cernox sensor close to act as thermal interlock and feedback. –Voltage taps Internal taps at the internal resistor / diode pack External at the upper and lower points of the HTS leads. –Pressure gauge Fitted at the vent tower and will act in the Pressure / Heater feedback Fitted to the fill line tower to ascertain an thermo-acoustic oscillations

Sensors

Heaters

Voltage Taps

Control Control system designed and assembled by the Daresbury group Pre Cool –Monitoring of all sensors, Pressure and Vacuum –Boil off of the residual LN2 using the heater control He Cool –Monitoring of the sensors, Pressure, He Level sensors, Vacuum, Cryo Cooler compressors and water flow. Operation at temperature –Monitoring of the sensors, Pressure, He Level sensors, Vacuum, Cryo Cooler compressors and water flow. –Control of the He pressure raising circuit. Approximatly 100 mBar over pressure. Energising the magnet and operation. –All monitoring and control of the heaters to maintain the slight over-pressure. –Interaction with the Power supply racks and DAQ / Quench protection system.

Control

ON / OFF SD16 CX05 SD11 SD05 CX06 SD12 SD06 CX07 SD13 SD07 CX08 SD27 SD01 CX09 SD15 SD03 SD10 Stable operation Temperature Monitoring and Heater / Pressure Feedback CX01 CX02 CX12 Level 1 Level 2 Level 3 CC 1CC 2CC 3CC 4SingleCC 5 Pressure SD02 SD08 SD14 Vacuum Vessel Radiation Shield Cold Mass Heater Power SD26 SD25 SD23SD19 Fill Line Heater Power CX11 CX10

CC1CC2CC3CC4CC5 SS Temp Out Temp Out Temp Out Temp Out Temp Out Temp Out Temp In Temp In Temp In Temp In Temp In Temp In Flow Rate High He Pressure Low He Pressure High He Temp Oil Temp High He Pressure Low He Pressure High He Temp Oil Temp High He Pressure Low He Pressure High He Temp Oil Temp High He Pressure Low He Pressure High He Temp Oil Temp High He Pressure Low He Pressure High He Temp Oil Temp External thermocouples for the single stage cooler. Compressor operation monitoring

Set Point Coil Power supplies and Voltage Tap monitoring and Control Matchin g Coil 1 Matchin g Coil 2 End Coil 1Centre CoilEnd Coil 2 Valu e Ramp Rate Voltage VTM1VTM2VTM3VTM4VTM5VTM6VTM8VTM9VTM7VTM1VTM2 Set Point Ramp Rate Voltage Set Point Ramp Rate Voltage Set Point Ramp Rate Voltage Set Point Ramp Rate Voltage VTL2 VTL9VTL10 VTL1VTL4 VTL11VTL12 VTL3VTL6 VTL13VTL14 VTL5VTL8 VTL15VTL16 VTL7 Contactor 3Contactor 2 Contactor 1 Open / Close 3 Diode Drop 8 Diode Drop