1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Goshen Area Bus Reconfiguration
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Houston Area Dynamic Reactive Project March 11,
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 Local Area Planning Update to TRANSAC – March 11, 2015.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2009 Five-Year Transmission Plan Update
Local Area Planning Update to TRANSAC – December 21, 2016
Local Area Planning Update to TRANSAC – September 15, 2016
Local Area Planning Update to TRANSAC – June 29, 2017
Local Area Planning Update to TRANSAC – March 15, 2017
Local Area Planning Update – TRANSAC
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
City of Lebanon, Missouri Electric Department
Local Area Planning Update to TRANSAC – September 26, 2018
TONBRIDGE POWER GREEN LINE
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Presentation transcript:

1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study

Loss of Missoula #4 to Hamilton Heights 161 kV lines (N-2) –Ranked #4 in current planning cycle. –Convert portions of the 69 kV system from Missoula to Hamilton to 161 kV; Add a 161/69 kV Switchyard at Stevensville. –Stevensville substation site selection complete, construction –Missoula 4 – Stevensville line conversion now scheduled for completion in –Stevensville – Hamilton Heights 69 kV conversion 15+ years out. Update: –The N-2 event that creates this problem has never occurred since second line was completed over 30 years ago. Though possible, likelihood is very remote. –A line conversion project is very expensive, and justifying the expense is very difficult when the event has never occurred. Capital funds could be put to better use mitigating other more likely system deficiencies. –Other NERC compliant mitigation is now under consideration (selective and controlled load shed); line conversion deferred for now, switchyard still go. 2 Mitigation Update for Highest Priority Problem #4

NWE considered uncertainty scenarios regarding high wind generation, loss of thermal plants, or loss of hydro facilities under unusual system conditions, but decided that study work done on these scenarios in the past study cycle were still valid. Also, more recent studies on loss of thermal facilities have been performed and reported at TRANSAC. NWE decided to focus effort on two new scenarios not recently studied, and timely: –Fires in forested/beetle kill areas resulting in loss of multiple facilities in a common corridor. –Accelerated localized growth in Bozeman and Billings areas. 3 Uncertainty Scenarios Update

2015 – One of the worst forest fire seasons on record. –Fortunately, few NWE facilities were affected: –Multiple structures in a 100 kV line north of Three Forks area were lost due to fire…approximately 5 miles of line. –Structures in several 100 kV lines in the Taft area were lost due to fire. –Structures in a 161 kV line north of Missoula were lost due to fire. –All customers remain in service while lines are being rebuilt. NWE considered concurrent outages in forested areas with and without significant beetle kill, and also grassland areas, all with significant transmission line facilities. Sequential loss of all facilities in these areas was considered under heavy summer (fire) conditions. 4 Uncertainty Scenarios Update: Fire Related Outages

Five areas around the system were studied: –A common corridor near Garrison Switchyard. Forested areas include two 500 kV lines, four 230 kV lines, and one 161 kV line (another 161 kV line to the east is outside the forested area). Some are BPA facilities. –A common corridor north of the Anaconda Mill Creek area. Forested areas include two 230 kV lines and two 161 kV lines. Some are BPA facilities. –A common corridor are south of the city of Broadview. Many transmission lines pass through this grassland area, including one 500 kV line, one 230 kV line, and four 100 kV lines in close proximity. Other 500 kV lines further south, not in close proximity, were excluded from this study. –A common corridor east of Thompson Falls. One 500 kV line and two 230 kV lines owned by others, and two 115 kV lines pass through this forested corridor. –A common corridor north of Missoula near Evaro. One 230 kV line (BPA) and two 161 kV lines pass through this forested area. 5 Uncertainty Scenarios Update: Fire Related Outages

Garrison Area Results –Low voltage conditions could be widespread and loss of load due to under voltage is possible in the course of this event, but with operator intervention as lines are lost in sequence, and advance planning/preparation, adverse voltage conditions can be avoided. –Automatic protection schemes should curtail Colstrip area generation for loss of 500 kV facilities. Transfers to the west would be significantly curtailed. –Local generation (Mill Creek, Butte) may be needed to help support area voltages. –All available shunt capacitors in area (Mill Creek, Dillon) may be needed for voltage support. –South bound power transfers to Idaho will need to be curtailed to minimums at Mill Creek. Anaconda Mill Creek Area Results –Same as for Garrison area, except curtailment of Colstrip generation would not be required with the 500 kV system intact. 6 Uncertainty Scenarios Update: Fire Related Outages

Broadview Area Results –Low voltage in Roundup area systems may occur under heavy load conditions, in particular on the area 50 and 69 kV systems normally supported by the 100 kV system in this area. –Curtailment of load in the area would likely be required until facilities are restored to service. Thompson Falls Area Results –No problems are encountered for generation or loads served from the NWE 115 kV system. –Loss of 230 and 500 kV transmission lines owned by others could result in altered scheduling or curtailment of hydro generation owned by others. Missoula Evaro Area Results –No new system problems encountered. Loss of one 161 kV line could cause minor overload on transformers on second 161 kV line under heavy load conditions, mitigated with small generation curtailment. Mitigation is scheduled for small overload on area BPA line. 7 Uncertainty Scenarios Update: Fire Related Outages

Fire Scenario Summary –None of these extreme events caused cascading outages. –Some events could result in low voltages or small transformer overloads, but with proper preparation and response nearly all problems can be mitigated. –Worst case scenarios may require some curtailment of load or generation in an area. 8 Uncertainty Scenarios Update: Fire Related Outages

NWE has noted accelerated growth in the Billings and Bozeman areas. –New connects and load additions have returned to pre-recession levels in these areas, and load is growing more rapidly than other areas in the system. –Loss of the Corette generation facility in the Billings area could limit our ability to serve new load as well. Using 2019 Heavy Summer and Heavy Winter cases: –Load was grown to forecasted 2029 levels in the Bozeman and Billings metropolitan areas, accelerating anticipated growth by approximately 10 years. –System Normal and Contingency case power flows were performed to determine sensitivity to accelerated growth in these areas. 9 Uncertainty Scenarios Update: Accelerated Local Growth

Results: –As expected, heavy summer conditions governed the Billings area studies, while heavy winter conditions governed the Bozeman area studies. –Under system normal conditions, no voltage or thermal problems were observed, no new problems, good news. –Under outage conditions, very little change in voltages was noted comparing the accelerated growth cases to the normal cases. A few new minor voltage problems in outlying areas were observed in the accelerated growth cases. –Under outage conditions, no new thermal problems were observed, but some known problems became worse, all involving transformer overloads. 10 Uncertainty Scenarios Update: Accelerated Local Growth

Results continued: –230 kV line faults in the Billings area illustrate an increase in overloads on Steamplant and Rimrock auto transformers by 10 – 15%. All such overloads remain below the emergency/trip ratings of the transformers. –161 and 50 kV line faults in the Bozeman area illustrate an increase in overloads on the Trident Auto transformer, up to 120% thermal under heavy winter conditions. In all cases for line faults, loading is less than the emergency/trip rating (and up to 125% is permitted in winter conditions). –Loss of a 230/100 kV autotransformer at Steamplant could increase an overload on the remaining transformer by approximately 15% (but less than emergency/trip levels) and overload the autotransformers at Rimrock beyond their emergency ratings under heavy summer conditions, up to 128%. Though less likely, this contingency requires further consideration for accelerated mitigation. 11 Uncertainty Scenarios Update: Accelerated Local Growth

Results continued: –Bus faults at Clyde Park or East Gallatin could load Trident Auto to over 160% of its thermal rating under heavy winter conditions with accelerated growth. Because this transformer has a very small thermal rating (16 MVA), small changes in system load can result in large % loading changes in this autobank. Though less likely, this contingency requires further consideration for accelerated mitigation. Mitigation is planned with the addition of Belgrade West 161/50 kV substation and the rebuild of the East Gallatin 161 kV bus, and Trident Auto would be removed. Uncertainty analysis is “Informational” and not the primary driver for mitigation. –Results of this analysis may influence timing of planned mitigation however. 12 Uncertainty Scenarios Update: Accelerated Local Growth

VAR Margin Study –NWE is working with a consultant, to get a fresh opinion on this important study. –Unfortunately study results are not yet available, but will be included in “the book” when complete. VAR Margin Assessment 13

Public Meetings have been scheduled as follows: –Billings: Thursday October 8 th at 7 PM at the NWE Billings Service Center –Missoula: Wednesday October 14 th at 7 PM at the NWE Missoula Service Center –All are welcome to attend Public Meetings 14

Quarter 8 Complete VAR Margin Assessment Send out Draft of “The Book” for stakeholder review Conduct Public Meetings – Billings and Missoula Finalize “The Book” and close out the 2014/2015 Local Area Planning Cycle Next Steps 15

Questions? 16

17