B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
SPS aperture measurements MSWG 26/03/2013 Stéphane Cettour Cavé.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
“Performance of BTVs during the CNGS commissioning” E. Bravin AB/BI NBI th International workshop on Neutrino Beams and Instrumentation 4-9 September.
Requirements for the Interlock System of the Phase1 beam line Janet Schmidt on behalf of CP3.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
H.Schmickler, AB-BDI Chamonix XIV workshop, CERN January 18, Beam Commissioning of LHC instrumentation Chamonix XIV, January 2005 H.Schmickler.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
LHC OP Tools - Applications (1) o2 new timing users, new dynamic destination oPower converters – settings (for base optics):  Parameters, optics, beam.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
STORM Beam Instrumentation First ideas Lars Søby on behalf of the CERN Beam Instrumentation Group.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
R.Bailey, Chamonix XV, February 2006 Staged commissioning plan for protons Hardware commissioning Machine checkout Beam commissioning 43 bunch operation.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Beam Instrumentation Overview Status for initial commissioning & recent results with BBQ & PLL LHC Machine Advisory Committee 7 th December 2006 Rhodri.
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Hardware Commissioning Review BDI Equipment
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Transfer line test: Beam stability measurements
BE-BI Software for LINAC4
LIU–PLI report LIU SPS meeting.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
CNGS Proton Beam: Introduction
Thursday morning – optics correction
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Summary Thursday h21: Stable beams fill #1303.
Thursday Fill 1364 (24 bunch) dumped at 07h
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary Tuesday h23: Machine closed. Precycle started.
HI2011 Commissioning Status
Presentation transcript:

B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN BE-OP-SPS1

Highlights SPS layout Beam instrumentation : Injection Line TT10 SPS Ring  All LSS Transfer lines  TT20 to North Area  TT40 and TT60  TT41  TT66  Ti2 and Ti8 Summary CERN BE-OP-SPS227/05/2014

CERN BE-OP-SPS3 SPS layout

Injection line TT10 4CERN BE-OP-SPS27/05/2014 BPCL:  14 devices  Beam steering / Injection oscillation correction  Critical for machine operation BCT:  TT10.BCTFI and TT2.BCTFI.212 (in CPS side but used by SPS-OP)  Beam structure / Bunch distribution / Gap  Critical for machine operation SEM (OUTIN)  9 BSP - 3 BSG - 1 BSTK  Energy matching / Emittance check / Beam position  Critical for machine performance BTV:  3(+1 in TT2)  Beam position / Beam shape / Transverse blow up  Critical for machine set-up No BLM

SPS Ring 5CERN BE-OP-SPS27/05/2014 BPM:  104 BPH  93 BPV  Beam steering  Critical for machine operation BLM:  216 devices (36 per arc)  Losses check / Machine protection  Critical for machine operation BCT:  BCTFS  Synchronisation for extraction kickers  Critical for machine operation BTV:  BTV and BTV  Beam position / Used in case of difficult start up  Critical for machine set-up BBSR:  BBSR and BBSR  No device (Empty tank); To be replaced by a vacuum chamber

6CERN BE-OP-SPS27/05/2014 SPS Ring BBSR21001 and BTV21003 : Also the case for BBSR61001 and BTV61003 BBSR BBSR BTV21001

7CERN BE-OP-SPS SPS Ring 27/05/2014 BSGV in front of TIDH (Dump) damaged. Replacement ongoing. BPSH.12174, BPSV (Schottky, RF Group) BCTDC (obsolete, to be removed) BPM:  2 BPD - 2 BPCN - 1 BPVC  Beam steering  Injection oscillation correction  Critical for machine operation BLM:  12 devices  Losses check  Critical for machine operation BCT:  BCTFS  Synchronisation for injection kickers  Critical for machine operation BTV:  4 devices (2 of which have a screen on a stepper motor)  Injection setting up  Critical for machine set-up LSS1

8CERN BE-OP-SPS SPS Ring 27/05/2014 BPM:  2 BPCR  3 BPCN  1 BPVC  Damper and feedback  Tune measurement BBQ  Critical for machine performance BLM:  15 devices  Losses check  Machine protection  North extraction surveillance (ZS, MSE, MST)  Critical for machine operation Stepper motor:  13 BBS and 2 BSG  Extraction setting up to North Area  Critical for machine set-up LSS2

9CERN BE-OP-SPS SPS Ring 27/05/2014 BPM:  1 BPNB  2 BPCN  1 BPCR  1 BPVT  Beam steering  Critical for machine operation  Chromaticity measurement (BPCR)  Critical for machine performance BCT:  BCTDC  Page-1 high intensity  Economy mode  Critical for machine operation  BCTFR  Bunch distribution  Beam quality check  Critical for machine performance LSS3

10CERN BE-OP-SPS SPS Ring 27/05/2014 BPM:  3 BPCE - 1 BPCL – 1 BPL - 1 BPLT - 1 BPMBV  Beam steering  Extraction setting up to TT40  Critical for machine operation BLM:  7 devices  Losses check  Machine protection  Critical for machine operation BCT:  BCTDC  Page-1 low intensity  Economy mode  BCTFS  Synchronisation for extraction kickers  Critical for machine operation LSS4

11CERN BE-OP-SPS LSS4 (SPS Ring) 27/05/2014 BWS:  2 Rotational (1 only V plane) and their filters (Stepper motor)  Emittance measurement  Aperture measurement  Cross check wirescan in LSS5  Critical for machine performance (especially for LHC beam) BTV:  2 BTVE (Screen on a stepper motor)  1 BTV  Extraction setting up  Critical for machine set-up

12CERN BE-OP-SPS SPS Ring 27/05/2014 BPM:  2 BPMBH – 4 BPMBV  Beam steering  Monitoring for experiments  Critical for machine operation BLM:  4 devices:  Losses check for experiment (UA9)  Critical for machine operation BCT:  BCTDC and BCTDC  Measurement of high intensity for primary ion beam interlock  Critical for personal protection BWS:  1 Rotational / 2 Linear and their filters (Stepper motor)  Emittance measurement  Aperture measurement  Cross check wirescan in LSS4  Critical for machine performance (especially for LHC beam) LSS5

13CERN BE-OP-SPS LSS5 (SPS Ring) 27/05/2014 BTV + BMO (Stepper motor):  1 device  Screen matching (Injection energy matching)  Critical for machine performance BBLR:  4 devices  Beam beam long range  Development instrument BIPM:  1 BIPMH – 1 BIPMV  Profile by residual gas ionisation  Development instrument BRS:  2 devices  Synchrotron light  Development instrument

14CERN BE-OP-SPS SPS Ring 27/05/2014 BPM:  3 BPCE – 2 BPCN  Beam steering  Extraction to TT60  Critical for machine operation BLM:  13 devices  Losses check  Machine protection  Critical for machine operation BTV:  4 BTVE (Screen on a stepper motor)  Extraction setting up  Critical for machine set-up LSS6

15CERN BE-OP-SPS27/05/2014 Transfer lines TT20 to North Area BLM:  20 devices  Transfer losses / losses at splitting / Machine protection  Critical for machine operation SEM (OUTIN):  19 BSP – 11 BSG – 6 BSI  Beam steering / Intensity measurement  Critical for machine operation Stepper motor:  34 BBS (Mini scanner) – 2 BSI – 6 BSM – 2 BSG – 2 BTV screens  Setting up to North Area  Critical for machine set-up BTV:  10 devices  Setting up to North Area  Critical for machine set-up

16CERN BE-OP-SPS Transfer lines 27/05/2014 BPM:  4 BPKG in TT40 – 5 BPCK in TT60  Beam steering  Critical for machine operation BLM:  6 devices in TT40 – 8 devices in TT60  Losses check  Machine protection  Critical for machine operation BCT:  1 BCTFI in each line  Beam presence  Injection Quality Check  Critical for machine operation BTV:  3 devices in each line  Beam transfer setting up  Screen matching  Critical for machine set-up TT40 and TT60 TT41: CNGS over. Configuration to be discussed for AWAKE

17CERN BE-OP-SPS Transfer lines 27/05/2014 BPM:  6 devices – 1 BPKG  Beam steering  Critical for machine operation BLM:  12 devices  Losses check  Machine protection  Critical for machine operation BCT:  1 BCTFI  Beam presence  Beam quality check  Critical for machine operation TT66

18CERN BE-OP-SPS Transfer lines 27/05/2014 BPMI:  53 devices in Ti devices in Ti8  Beam steering  Critical for machine operation BLMI:  39 devices in Ti devices in Ti8  Losses check  Machine protection  Critical for machine operation BCT:  1 BCTFI in each line  Beam presence  Injection Quality Check  Critical for machine operation BTVI:  9 devices in each line  Beam transfer setting up  Screen matching  Critical for machine set-up Ti2 and Ti8

Summary 19CERN BE-OP-SPS27/05/2014 Critical for machine operation:  Almost all BPMs  All BLMs  Almost all BCTs  All SEMs (OUTIN) in TT20  Beam steering every day Critical for machine performance:  BPMs for tune and chromaticity measurement  BCTFR  All SEM (OUTIN) in TT10  Wirescanners  BTVs for screen matching Critical for machine set-up:  BTVs for extraction setting up  Mini scanners Development instrument:  BBLR  BIPM  BRS To be removed:  BCTDC  BBSR and BBSR (Tank)

Acknowledgment 20CERN BE-OP-SPS27/05/2014 I would like to thank L. Jensen and K. Cornelis for their useful guidance

21CERN BE-OP-SPS27/05/2014 Thank you very much for your attention