LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 Luigi Mansani

Slides:



Advertisements
Similar presentations
A case history of CFD support to Accelerator Driven System plant
Advertisements

LEADER Task 3.3 ALFRED - Primary Cover Gas System (PCGS) L. Mansani, M. Bruzzone, V. Pierantoni Karlsruhe, November 20 th, 2012.
Copyright © 2012 SCKCEN WP1: Reference design objectives and specifications Didier De Bruyn (SCKCEN), Presented by Alessandro Alemberti (ANS) 1 7th LEADER.
Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design FA_ ppt Task 2.4 – Mechanical Design & Drawings of LFR and ETDR Fuel Assemblies (mech. Design)
Didier De Bruyn & Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA), Massimo Sarotto (ENEA) & Evaldas Bubelis (KIT) ICAPP’12.
Nuclear Power Turkey Point Power Plant Process. Turkey Point Power Plant Built on 12, 700 acres in Homestead Opened in 1972 Cost to build both reactors.
EUROTRANS – DM1 RELAP5 Model Evaluation with SIMMER-III Code and Preliminary Transient Analysis for EFIT Reactor WP5.1 Progress Meeting KTH / Stockholm,
LEADER Project: Task 5.4 Analysis of Representative DBC Events of the ETDR with RELAP5 G. Bandini - ENEA/Bologna LEADER 5 th WP5 Meeting JRC-IET, Petten,
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design C&S_Rods_ ppt Task Primary system conceptual design of ALFRED Control rods & Safety.
EUROTRANS WP 1.5 Meeting FZK – Karlsruhe, November 27-28, 2008 FPN-FISNUC / Bologna EUROTRANS – DM1 EFIT Transients Analysis with RELAP5, SIMMER-III and.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
EUROTRANS – DM1 Preliminary Transient Analysis for EFIT with RELAP5 and RELAP/PARCS Codes WP5.1 Progress Meeting Empresarios Agrupados - Madrid, November.
EUROTRANS: WP1.5 Technical meeting, Karlsruhe, November 27 – 28, XT-ADS DHR Conceptual Design L. Mansani
EUROTRANS: WP1.5 Technical meeting, Bologna, May 28-29, L. Mansani WP1.2 EFIT and XP-ADS Data.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Forschungszentrum Karlsruhe Technik und Umwelt IRS /FzK W.M.SchikorrEUROTRANS WP1.5 Safety Meeting : Karlsruhe, Nov 27-28, EFIT-Pb Transient Analysis.
Sea Fukushima Dai-Ichi: Status before the Earthquake Units 1, 2, and 3 operate at full power. Steam produced by water boiling in the reactor vessel flows.
NUCLEAR SAFETY Barbora Svobodová Angličtina-odborná II.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
ALFRED and ELFR system design
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
[T6.4] Assessment of damping pressure wave inside SG Technical meeting – KIT - Karlsruhe, 22/11/2012 A. Del Nevo, A. Ciampichetti Presented by Mariano.
Thermal hydraulic analysis of ALFRED by RELAP5 code & by SIMMER code G. Barone, N. Forgione, A. Pesetti, R. Lo Frano CIRTEN Consorzio Interuniversitario.
EUROPEAN LEAD FAST REACTOR The LEADER project aims to define an European Lead Fast Reactor configuration for an industrial-sized (600 MWe, the ELFR) reactor,
Thermal Hydraulic Simulation of a SuperCritical-Water-Cooled Reactor Core Using Flownex F.A.Mngomezulu, P.G.Rousseau, V.Naicker School of Mechanical and.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
LEADER, Task 5.5 ETDR Transient Analyses with SPECTRA Code LEADER Project JRC, Petten, February 26, 2013 M.M. Stempniewicz NRG-22694/
Analyses of representative DEC events of the ETDR
LEADER Project Overview
General Assembly 2 - JERICO - 1 Patrick Farcy I Ifremer I Financial Management WP11 Jerico GA I Oslo I Norway.
D29 - Roadmap for LFR development Davide Mattioli ENEA UTFISSM-PRONOC LEADER (Lead-cooled European Advanced DEmonstration Reactor) WP 1 - Task 1.1 Amsterdam.
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
LEADER/ELECTRA Safety Workshop: Petten February 2013 IRSN presentation on its document “ Overview of Generation IV (Gen-IV) reactor designs Safety.
LEADER WP3: Conceptual Design Status L. Mansani
ALFRED System Configuration Luigi Mansani
Development of a RELAP5-3D thermal-hydraulic model for a Gas Cooled Fast Reactor D. Castelliti, C. Parisi, G. M. Galassi, N. Cerullo (San Piero A Grado.
ALFRED and ELFR design overview Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European LFR Industrial Plant.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Safety Analysis Results of the DEC Transients of ALFRED LEADER Lead-cooled European Advanced DEmonstration Reactor G. Bandini (ENEA), E. Bubelis, M. Schikorr.
1 Kaspar Kööp, Marti Jeltsov Division of Nuclear Power Safety Royal Institute of Technology (KTH) Stockholm, Sweden LEADER 4 th WP5 MEETING, Karlsruhe.
Please insert a figure in the master transparency. KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association.
Nuclear Power. Fission Uranium-235 Plutonium-239 Neutron 10n10n 10n10n 10n10n Strontium-90 Xenon-144.
LEADER meeting WP2 – Task 2.5 DPA, dose and activation calculations D. Gugiu (INR) – C. Petrovich (ENEA) Karlsruhe, November 21 st 2012.
WP1: Reference design objectives and specifications Didier De Bruyn SCKCEN Fourth PCC meeting FP7 LEADER Bologna, 27 October.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
LEADER Project Analysis of Representative DBC Events of the ETDR with RELAP5 and CATHARE Giacomino Bandini - ENEA/Bologna Genevieve Geffraye – CEA/Grenoble.
LEADER WP3 Conceptual Design Status KIT Campus North, Karlsruhe, Luigi Mansani
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
LEADER Work Package 2 Status of activities Giacomo Grasso on behalf of Carlo Artioli – Work Package 2 leader UTFISSM-PRONOC ENEA LEADER PCC meeting Bologna,
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
Modeling a Steam Generator (SG)
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Task 2.1: Review of ELSY and Conceptual design & neutronic characterization of the ELFR Industrial Plant Kamil Tuček on behalf of Task 2.1 contributors.
KIT TOWN OFFICE OSTENDORFHAUS Karlsruhe, 21 st November 2012 CIRTEN Consorzio universitario per la ricerca tecnologica nucleare Antonio Cammi, Stefano.
LEADER achievements and next steps 4 th GB MEETING of the LEADER project Genova May 10 th 2013 Alessandro Alemberti
“Design and safety analysis of Alfred” G. Forasassi President of CIRTEN CIRTEN Interuniversity Consortium for Technological Nuclear Research 3 rd LEADER.
IHM/ KIT/ Campus Nord 1 | Georg Müller | LEADER Bologna November 17, 2010 LEADER WP6 AGENDA Bologna, November 17th, 2010 ENEA, Aula Magna 14.00Agenda (G.
Ta’Juan Dutrieuille November 4, 2009 Period 1
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
NRG Contribution to LEADER WP1.1 Status LEADER Petten, Netherlands Ferry Roelofs
1DEN/CAD/DTN/DIR Genova 2010 April 22nd LEADER WP6 Task 6.3 Assessment, validation and adaptation of oxygen control and purification strategy (CEA-5, ENEA-1,
Tacis 1.14/91 on life-time evaluation TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R1.14/91,
November 19th 2010, Bologna LEADER 1 1st LEADER PCC MEETING WP4 PLANT OPERATION, INSTRUMENTATION, CONTROL AND PROTECTION SYSTEM DESIGN.
Nuclear Battery Battery.  Reactor –Core Metallic fuel core (U-10%Zr) –Reactivity control Movable reflectors –Shutdown system Shutdown rod and reflectors.
Progress Meeting 20 Nov 2012, Karlsruhe LEADER 1LEADER1 WP1 REFERENCE DESIGN OBJETIVES AND SPECIFICATION (SCK-CEN)
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Generator Operation. Video of Generator synchronizing.
Pressurized Water Reactor
Presentation transcript:

LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Luigi Mansani

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, WP3 Tasks Task Reference plant configuration of a LFR (ANSALDO, CIRTEN, EA, JRC-IE, SRS) Task SG damping pressure waves system design (MERIVUS, CIRTEN, ENEA) Task Primary system conceptual design of the ETDR (SCKCEN, ANSALDO, EA, SRS) Task Secondary system conceptual design of the ETDR (EA, ANSALDO) Task DHR system conceptual design of the ETDR (ANSALDO, SCKCEN) Task Plant layout of the ETDR (EA, ANSALDO) Task Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump (MERIVUS)

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Task 3.1 Status  Design changes of the ELSY configuration identified  ELFR configuration defined and used as a reference for ALFRED  Contractual deliverable D03 “Review and justification of the main design options of the LFR reference plant” issued  The following Mechanical Drawings have been issued:  LEADER 31 DMBX 024 Rev. 0 Reactor Block General Assembly  LEADER 31 DMBX 025 Rev. 0 Fuel assembly outline  LEADER 31 DMBX 026 Rev. 0 Inner vessel outline  LEADER 31 DMBX 008 Rev. 0 Core lower grid outline  LEADER 31 DMBX 009 Rev. 0 Core upper grid outline  LEADER 31 DMBX 027 Rev. 0 Reactor vessel outline  LEADER 31 DMBX 028 Rev. 0 Reactor cover outline  LEADER 31 DMBX 029 Rev. 0 Steam generator outline  LEADER 31 DMBX 030Rev. 0 Vessel support outline  LEADER 31 DMBX 023 Rev. 0 DHR deep cooler outline  Technical DOC T51 has been included and merged in D03  Contractual deliverable D31 ELFR Summary Report to be issued at M36

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Task 3.1: ELFR - Reactor Configuration

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Task3.2: Status of the activity  Task Accomplished  T52 - Conceptual design of the SG damping pressure wave system and test mock-up has been issued

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Task 3.3: Status  Design changes of the ELSY configuration identified  ALFRED configuration (  300 MWth) defined  The following Mechanical Drawings have been issued:  LEADER 33 DMBX 013 Rev 0 Reactor Block General Assembly  LEADER 33 DMMX 014 Rev 0 Fuel assembly outline  LEADER 33 DMMX 015 Rev 0 Inner vessel outline  LEADER 33 DMMX 016 Rev 0 Core lower grid outline  LEADER 33 DMMX 017 Rev 0 Core upper grid outline  LEADER 33 DMMX 018 Rev 0 Reactor vessel outline  LEADER 33 DMMX 019 Rev 0 Reactor cover outline  LEADER 33 DMMX 020_001 Rev 0 Steam generator outline  LEADER 33 DMMX 020_002 Rev 0 Steam generator outline  LEADER 33 DMMX 021 Rev 0 Vessel support outline  LEADER 35 DMBX 036 Rev 0 Isolation Condenser outline  Technical document T57 drafted  Contractual deliverable D32 (Summary Report) and Technical document T66 /Main components thermo-mechanical sizing) to be issued at M36

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Task 3.3: ALFRED - Reactor Configuration

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Task 3.4: Status of the activity  Task Accomplished  Contractual deliverable DEL09 “Secondary cooling concepts & feasibility study of heat recovery of the ETDR” issued

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe,  Task Accomplished  Contractual deliverable DEL10 “Conceptual design of the DHR system of the ETDR (ALFRED)” issued Task 3.5: Status of the activity

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe,  Technical document T53 “Seismic Response Spectra of the Reactor building of the ETDR (ALFRED) to be issued at M18  Contractual deliverable D13 “Plant layout and description of the containment system of the ETDR (ALFRED)” to be issued M30 Task 3.6: Status of the activity

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe,  The new partner M.E.Rivus is now officially in the project  New task “Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump” in-kind to MERivus has been added to the project  Contractual deliverable D39 “Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump” to be issued at M36 Task 3.7: Status of the activity

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Del/DocTitleTaskResponsibleDate D03 Review and justification of the main design options of the LFR reference plant 3.1ANSALDOIssued D09 Secondary cooling concepts & feasibility study of heat recovery of the ETDR 3.4EAIssued D10 Conceptual design of the DHR system of the ETDR 3.5ANSALDOIssued D13 Plant layout and description of the containment system of the ETDR 3.6EAM30 D31 Reactor Design Summary Report of the reference LFR, further development recommendations 3.1ANSALDOM36 D32 Reactor Design Summary Report of the ETDR, further development recommendations 3.3SCKCENM36 D39 Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump 3.7MERIVUSM36 T51 Description, functional sizing and drawings of the main components of the LFR plant 3.1ANSALDO Included in D3 T52 Conceptual design of the SG dumping pressure wave system and test mock- up 3.2MERIVUSIssued T53 Seismic Response Spectra of the Reactor building of the ETDR 3.6EAM18 T57 Description, functional sizing and drawings of the main components of the ETDR 3.3SCKCEN Drafted M24 T66 Main components thermo-mechanical sizing of the ETDR 3.3SCKCENM36 WP3 Deliverables & Technical Documents

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, WP3 Milestone & Planning MilestoneTitleTaskDateVerification M01LFR updated reference configuration3.1IssuedReport – T01 M04ETDR reference configuration3.3 Drafted M24 Report – D09, T57 M11 Reactor Design Summary Report of the reference LFR and the ETDR AllM36Report – D31, D32 November 2012 Completed

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Thank you for your attention