Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
European Cooperative Network for Research, Diagnosis and Therapy of Parkinson´s Disease EuroPa Plenary Meeting WORK PACKAGE 3 WORK PACKAGE 3 - Patient.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
We need a common denominator to add these fractions.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
PP Test Review Sections 6-1 to 6-6
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Performance of units These slides complement the article How journal rankings can suppress interdisciplinary research. A comparison between innovation.
We are learning how to read the 24 hour clock
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Test B, 100 Subtraction Facts
: 3 00.
5 minutes.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
Week 1.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Duct numbering for EE- Wolfgang Funk - CERN CMS 12/05/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
Presentation transcript:

Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1

Wolfgang Funk - CERN CMS 30/07/2004 Duct 05.A Duct 05.B LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 3*4.3X2 (27) signal 1*9 (64) LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) B ret OF 15*4.3X2 (129) HV 4*14 (616) Sniff 1*6 (29) P F P ret LV 10*12.2 (1169) CO 1*14 con (154) Signal 1*10 (79) CO 1*14 is (314mm**2) CO 1*14 con (154) N2 1*8 (51) sn N2 Sum: (1960) Sum: (1860) Similar to Duct 03.B Similar to Duct 03.A View towards I.P. for EE+ View from I.P. for EE- Duct 06.B Duct 06.A 2 Note that the EE HV cables are only the indicated size where there is no space problem. The mantle is cut off elsewhere (curves) and saves almost 60% of cross section.

Wolfgang Funk - CERN CMS 30/07/2004 Duct 04.A Duct 04.B LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 5*4.3X2 (45) signal 1*9 (64) LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) signal 2*9 (128) P F Pret HV 4*14 (616) CO 1*14 is (314) OF 15*4.3X2 (129) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) P F Sum: (2149) Sum: (1987) Similar to Duct 02.A Similar to Duct 02.B Duct 07.B Duct 07.A 3

Wolfgang Funk - CERN CMS 30/07/2004 Duct 03.A Duct 03.B LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 5*4.3X2 (45) signal 1*9 (64) LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 3*4.3X2 (27) Signal 1*9 (64) OF 15*4.3X2 (129) HV 2*14 (308) LV 10*12.2 (1169) CO 1*14 con (154) Signal 1*10 (79) CO 4*10 is (804mm**2) CO 1*14 is (314) CO 1*12 is (255) CO 1*14 con (154) OES R P F Pret BF OES F FES F Sum: (1969) Sum: (2549) Similar to Duct 05.B Similar to Duct 05.A Duct 08.B Duct 08.A 4

Wolfgang Funk - CERN CMS 30/07/2004 Duct 02.A Duct 02.B LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) PE 1*3.6 (10) LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) OF 4*4.3X2 (36) signal 2*9 (128) P F Pret LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) CO 2*14 is (628) Laser 1*10 (79) OF 15*4.3X2 (129) Co 1*14 (154) P F MEM 24*2.2 (92) MEM 4*1.5X2 (12) MEM 6*2X10 (120) Note: additional cables between MEM and balconies: Hybrid (5V,2.5V Ving, sensing for all) 2*12.3 (238), OF 2*4.3X2 (18) MEM cables (MEM 24*2.2 (92), MEM 4*1.5X2 (12) and MEM 6*2X10 (120) )are only between MEM and Dees Sum: (2340) Sum: (2403) Sum: (2122) Similar to Duct 04.B Similar to Duct 04.A DCS 1*11 (95) DCS 1*7.2 (41) DCS 1*5.8 (26) Duct 09.B Duct 09.A 5 P F ret B Note: PE is only in in 9A-/2B+ for ES and not in 18A-/11B+

Wolfgang Funk - CERN CMS 30/07/2004 Duct 01.A CO 1*71 (3960) Duct 10.B 6

Wolfgang Funk - CERN CMS 30/07/2004 Duct 01.B CO 1*71 (3960) Duct 10.A 7

Wolfgang Funk - CERN CMS 30/07/2004 Duct 18.B LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) P F Pret LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) Sum: (2122) Similar to Duct 16.B Duct 11.A Duct 18.A CO 2*14 is (628) Co 1*14 (154) P F HV 4*14 (616) OF 15*4.3X2 (129) Sum: (2652) Similar to Duct 16.A Duct 11.B 8 P F LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) OF 5*4.3X2 (45) signal 2*9 (128) DCS 1*11 (95) DCS 1*7.2 (41) DCS 1*5.8 (26) ret B

Wolfgang Funk - CERN CMS 30/07/2004 Duct 17.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 3*4.3X2 (27) Signal 1*9 (64) LV 10*12.2 (1169) CO 1*14 con (154) Signal 1*10 (79) P F Pret Sum: (1969) Similar to Duct 15.A Duct 12.B Duct 17.B LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 5*4.3X2 (45) signal 1*9 (64) CO 4*10 is (804mm**2) CO 1*14 is (314) CO 1*12 con (113) CO 1*14 con (154) OES R BF OES F Sum: (2407) Similar to Duct 15.B Duct 12.A FES R 9 OF 15*4.3X2 (129) HV 2*14 (308)

Wolfgang Funk - CERN CMS 30/07/2004 Duct 16.A LV1 8*7.4 (344) LV2 8*6.1 ( 240) HV 2*15.3 (368) signal 2*9 (128) P F Sum: (2139) Similar to Duct 18.A Duct 13.B Duct 16.B LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 5*4.3X2 (45) signal 1*9 (64) P F Pret LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) Sum: (1987) Similar to Duct 18.B Duct 13.A 10 HV 4*14 (616) CO 1*14 is (314) OF 15*4.3X2 (129)

Wolfgang Funk - CERN CMS 30/07/2004 Duct 15.A LV1 4*7.4 (172) LV2 4*6.1 (120) OF 2*4.3X2 (18) signal 2*9 (128) 14/23 P ret LV 10*12.2 (1169) CO 1*14 con (154) Signal 1*10 (79) Sum: (1840) Similar to Duct 17.A Duct 14.B Duct 15.B LV1 2*7.4 (86) LV2 2*6.1 (60) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) B ret HV 6*14 (924) OF 15*4.3X2 (129) Sniff 1*6 (29) P F CO 1*14 is (314mm**2) CO 1*14 con (154) N2 1*8 (51) sn N2 Sum: (2126) Similar to Duct 17.B Duct 14.A N2/sniff 1*12 (113) N2 Note: ES N2 pipe is input on one Dee and output on other Dee (same diameter) 11 Note: in 14B-/15A+ for ES only LV2 2*6.1 and not 4! whereas in 5B-/6A+ LV2 4*6.1 existent Note: in the ducts 14B-/15A+/5B-/6A+ ES LV1 and ES LV2 all cables run to counting room since used for heating

History Wolfgang Funk - CERN CMS 30/07/ Move ES services out of 10B-/10A- into 9A-/11B- (no space in ducts with ES pipes). 2.Move PF from 7A- to 9A- and from 13B- to 11B- to avoid crossing of cooling pipe over ring flange bean. 3.Move half of OF from 6B-/8B-/13B-/11B- to 7A-/9A-/14A-/12A- to have less crossings. 4.Move half of HV from 7A-/9A-/14A-/12A- to 6B-/8B-/13B-/11B- to have less crossings. 5.Change of DCS scheme: no DCS cable anymore in 7B-/13A-, but 3 DCS cables in 9B- /11A-, no overall cross section increase. New version 14/7/03 to avoid crossing of services at EE patch panel area according to Justins proposal of patch panel design of spring 03: New version 6/8/03 to increase LV cable sets to 20/Quadrant (before 18/Quadrant) because of new EE-mechatronics design of Tony: 1.2 more LV EE cables each in ducts 7B-,9B-,11A-,13A-. New version 11/8/03 to increase space in ducts for ES cooling pipes. 1.Move EE backplate return pipes from 10B-/10A- into 9A-/11B-.

History(2) Wolfgang Funk - CERN CMS 30/07/ Remove one OF from of 9A-. 2.Remove separate LV cables for controls 14A- (are part of standard LV system) New version 23/9/03 to adapt latest version of ES services: New version 03/12/03 to adapt latest version of EE/ES services: 1.One ES unit contains now only one signal- (control) cable instead of 2 with exception of duct 14B-. 2.One ES LV unit contains now of 4*7.4 and 4*6.1 instead of 6*7.4 3.MEM services adopted to new information 4.EE HV 2*13 mantles/Dee (each has 13/12 coax) replaces single coaxes, changed some positions to equalize filling factors. New version 2/03/04 to adapt latest version of EE/ES services: 1.In 14B- ES now only 2 LV 6.1mm instead of 4 (but not other Dee (5B-), where are still 4) 2.In 14A- ES only 2 LV 6.1mm and 2 LV 7.4mm instead of 4 each before 3.Only 4 signal cables/Quadrant for EE instead of 6 before 4.One more optical fiber in all ducts where there was a fiber for ES (spare)

History(3) Wolfgang Funk - CERN CMS 30/07/ less OF spares/ Dee than before. 2. Implement 1 OF spare per double MEM 3. Implement 1 protection conductor per ES disk New version 30/7/04 to adapt latest version of ES/EE services: