March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
MuCool Test Area RF Workshop Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 15, 2010.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
MICE CM23 Preliminary Agenda Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
WMIG AND LIMPOPO REGIONAL OFFICE LIAISON MEETING Lessons Learnt – Inkomati CMA Establishment and Development 12 December 2006.
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
Agenda - meeting of the GERDA Collaboration Board November 9, Approval of Agenda 2. Approval of minutes of previous Collab Board meeting 3. Update.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MAP Overview Steve Geer Accelerator Physics Center Fermi National Accelerator Laboratory MAP Winter Meeting JLab, February 28, 2011  
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
Research & Technology Implementation TxDOT RTI OFFICE.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM29.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Muon Accelerator Program Overview Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May o VC 17th June o CM27 (RAL)
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
MICE CMPB Alain Blondel 1 Highlights on MICE.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Muon Collider R&D Co-ordination MCTF. INTRODUCTION 2 2 Steve Geer MUTAC REVIEW April 2007 BNL Steve Holmes, March 13 th, 2007: “ … MCOG ask the NFMCC.
Muon Accelerator Program Review Highlights Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
DOE Review Recap Mark Palmer Fermilab August 15, 2014.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Muon Collaboration Meeting Steve Geer MUTAC Review, Jan, 2003 Muon Collaboration WELCOME.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Welcome to (MAP) 2014 winter meeting J.P.Delahaye MAP Collaboration (FNAL, May 31, 2014)1 SLAC: Dec 2-6,
Muon Accelerator Program: Overview & Directions Mark Palmer June 19, 2013.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Fundamental aspects of muon beams submitted to Accelerator R&D panel for GARD funding consideration by J.P.Delahaye/SLAC & Robert D. Ryne/LBNL.
DOE Mini-Review Summary and Management Updates Mark Palmer Fermilab March 15, 2013.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
SLAC contribution to the Muon Accelerator Program (MAP) SLAC2MAP.
August 24-26, 2010MAP ProgMgmt - Zisman 1 August 24-26, Program Management Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
Comments on the February DOE Review
Status of the MICE Construction Project
m+ m- n MAP Overview Steve Geer Accelerator Physics Center
MICE Project in the US: Completion of Efforts
Cost of Service Analysis & Rate Design
Implementing the Transportation/Land Use Connection Program
Final Remarks Michael S. Zisman Center for Beam Physics
LHC External Collimation Review
Review plan of the nature reporting – update 6
Presentation transcript:

March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory (*with S. Geer) MAP Meeting–Jlab March 4, 2011

Outlook and Guidance - Zisman2 Outline Introduction News – management plan – budget process – proposal status – director search Challenges revisited Closing comments Kudos

March 4, 2011Outlook and Guidance - Zisman3 Introduction This marks the first meeting of MAP – good progress in evidence on many fronts – pleased to see many new faces here! Still many ideas being generated – these must be filtered through L1 leaders before proceeding – we will be judged by our (focused) progress “making progress in all directions” will not be viewed favorably by reviewers or DOE

March 4, 2011Outlook and Guidance - Zisman4 News (1) Management plan sent to DOE in December – after approval by Fermilab Director Still awaiting DOE response

March 4, 2011Outlook and Guidance - Zisman5 News (2) Budget process is under way…albeit slowly – Statements of Work (SoWs) now prepared by Directors for each institution milestones (linked to WBS) specified by L1 leaders – SG/MZ reviewing now (ready next week) after our review, SoWs sent to institutional reps (  IB members) for their approval – forms to be signed by MAP Directors and Institutional Reps thereafter, SG/MZ will send formal request to DOE for funding distribution

March 4, 2011Outlook and Guidance - Zisman6 News (3) Proposal status – at review, revised proposal requested November 30, 2010 updated text was prepared and revised budget was being developed – final review report specified revised proposal due date of June 1, 2011 to permit new MAP Director to prepare revisions in time for next DOE review – anticipate next review this summer – all work on proposal stopped at this point

March 4, 2011Outlook and Guidance - Zisman7 News (4) Director search under way – search committee appointed Stuart Henderson (chair) Vladimir Shiltsev Dan Green Bob Palmer Don Hartill – job description prepared for public distribution to be released next week Not clear recruitment time scale compatible with June 1 proposal deadline – SG/MZ seeking guidance on how to proceed

March 4, 2011Outlook and Guidance - Zisman8 Challenges Revisited (1) Handling 4-MW beam – progress made in resolving target radiation issue have initial solution that meets ITER criterion – study of downstream losses getting under way under IDS-NF auspices Souchlas

March 4, 2011Outlook and Guidance - Zisman9 Challenges Revisited (2) Need for high-gradient RF – continuing RF R&D progress at MTA first beam arrived on February 28 – after a long gestation period Johnstone, Bross, Torun

March 4, 2011Outlook and Guidance - Zisman10 Challenges Revisited (3) Need for ionization cooling – MICE magnets getting enhanced attention (Gourlay, Virostek) increased effort for Spectrometer Solenoids – we WILL meet our obligations! – MICE RF cavities all delivered (DeMello, Li, Virostek) – final cooling with 30 T now looks okay

March 4, 2011Outlook and Guidance - Zisman11 Revised Final Cooling Palmer

March 4, 2011Outlook and Guidance - Zisman12 Challenges Revisited (4) MDI/Backgrounds – massively parallel computing (Ryne) offers hope of fully detailed simulations of beam backgrounds compared with 1/100 of bunch today

March 4, 2011Outlook and Guidance - Zisman13 Educational Aspects We learned a new word!

March 4, 2011Outlook and Guidance - Zisman14 Goals We look forward at Telluride to hearing – finalization of target baseline – approaches to handling energy deposition in front end – HPRF results with beam – initial tracking results for “VRCS” – initial design for 3 TeV collider ring

March 4, 2011Outlook and Guidance - Zisman15 Closing Comments We must continue to be focused and disciplined in our R&D activities – agreement of cognizant L1 leader on research activities is a must for MAP-funded work our success depends on being perceived as a program that delivers on its promises We need to advertise our program – please use MAP logo on slides for all talks – look for opportunities to give talks/seminars on MAP work We hope to see you at Telluride – June 27 – July 1, 2011

March 4, 2011Outlook and Guidance - Zisman16 Telluride 2011

March 4, 2011Outlook and Guidance - Zisman17 Kudos Welcome to Muons, Inc. as members of MAP Thanks to Alex Bogacz and Kevin Beard for organizing meeting – thanks also to L1 leaders who assisted in planning stimulating agenda Thanks to excellent administrative staff for the hospitality we all experienced – Cynthia Lockwood, Stephanie Vermeire, Ruth Bizot Next winter meeting at SLAC (date tbd)