Policy: IWRM policy. a) List of stakeholders 1.Minister of Water and Environment 2.Minister of Agriculture & livestock 3.Minister of energy & mineral.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
Slide 1 Insert your own content. Slide 2 Insert your own content.
Chapter 10 Natural Monopoly and the Economics of Regulation.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 of 17 Information Strategy The Features of an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy The.
For APNOMS Managing Pervasive Computing and Ubiquitous Communications Challenges Ahead Graham Chen.
1 MDG Needs Assessment Process in Tajikistan Temur Basilia MDG Team Leader UNDP Tajikistan July 2005.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
Chapters 1 & 2 Theorem & Postulate Review Answers
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
European Commission - Directorate General for Agriculture EU rural development policy
REALISING BOSNIA AND HERZEGOVINAS EUROPEAN POTENTIAL: FROM WAR ECONOMY TO CREDITWORTHINESS AND SUSTAINABILITY MACRO AND FISCAL FRAMEWORK Ljerka Marić,
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
EGYPT Integration: Enforcement of IWRM (Integrated Water Resource Management) STAKEHOLDERS: Farmers/peasants Parliamentarians General Association of Water.
ZMQS ZMQS
Treasure Map By: Gage Gwin Haven Beagle START. Step 1 23 tiles south CONTINUE.
SUSTAINABLE WATER MANAGEMENT Walter Z. Tang Valdu Suurkask Fall, 2009 EKV8360 3,0 EAP Department of Environmental Engineering.
Water Demand Management Role Play Regional Training of Trainers Workshop National Water Resources Institute, Kaduna, Nigeria 6 – 10 December 2004 West.
5Min 5-4 1) Evaluate 3 × (4 + 7) – 5 × 4. 2) Evaluate × 5 3) Evaluate 13 squared. 4) Evaluate 9 cubed. Warm Up.
ABC Technology Project
O X Click on Number next to person for a question.
© S Haughton more than 3?
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Human Resources Division Information Systems The Human Resources staff is implementing several new applications and redesigning existing information systems.
Twenty Questions Subject: Twenty Questions
Take from Ten First Subtraction Strategy -9 Click on a number below to go directly to that type of subtraction problems
THE ROLE OF AUC IN DEVELOPMENT OF GEOTHERMAL ENERGY IN EAST AFRICAN COUNTRIES Regional Geothermal Working Group Meeting September 2011, Kampala,
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
1 Rural Secretariat Innovation and Collaboration: Learning and Changing Together October 27, 2009 Goose Bay.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Limits (Algebraic) Calculus Fall, What can we do with limits?
Properties of Exponents
Chapter 5 Test Review Sections 5-1 through 5-4.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Analysis of engineering system by means of graph representation.
Week 1.
We will resume in: 25 Minutes.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
1 Unit 1 Kinematics Chapter 1 Day
O X Click on Number next to person for a question.
Sudan Stakeholders Farmers and Peasants Ministry of Irrigation Parliamentarians Ministry of Agriculture & Forestry Ministry of Environment CSOs and NGOs.
How Cells Obtain Energy from Food
National Policy and Strategy for Agriculture, Forestry and Fisheries 15 March, 2004.
National Legislation and Coordination Mechanisms SRI LANKA P. M. Jayatilaka Banda Director Department of Meteorology Colombo, SRI LANKA.
Welcome Ethiopia teams visit to WASSAN, Hyderabad 14 th to 16 th March ‘13.
Progress in current activities Palestine
Presentation transcript:

Policy: IWRM policy

a) List of stakeholders 1.Minister of Water and Environment 2.Minister of Agriculture & livestock 3.Minister of energy & mineral resources 4.Directorate of water Development 5.Donors 6.Communities (fisher folks) 7.Private sector (industrialists) 8.National forestry Authority 9.National Environment Management Authority 10.Local Governments 11.CSOs 12.NBI/NBD 13.Minister of health 14.Urban Water Supply 15.Water for Production 16.Rural water supply 17.Fisheries Department

b) Position map POSITION Level of influence OpposedNeutralSupportive High NEMA Private Sector/Investors DWD Minister of water and Environment Medium Minister of Energy and mineral development. Fisher folks, Farming communities on the watersheds Urban water supply Dept Rural water supply Dept National Water and Sewerage Corporation Water for production Donors CSOs NBI/NTEAP Fisheries Dept National Forestry Authority

Contd OpposedNeutralSupportive LowMinister of HealthCSOs Local governments Wetlands Inspection Division Water Policy Committee

c) Interest of stakeholders Opposed Unregulated access and use of water resources Supportive Sustainable Water resources management to benefit all sectors

d)Type of policy engagement InformationConsultationPartnershipBargaining InitiationDWD Water policy committee NFA Min of Energy Fisher folks/ farming Communities on the watershed Private sector MiN OF HEALTH DWD Nema Local govts Donors Urban /Rural water supply Min of Energy DWD WID NW&SC Water for production dept Donors NBI/NTEAP NFA Fisher folks Min of Energy Communities Planningall Implementationall

Contd InformationConsultationPartnershipBargaining Initiation Planning Implementation Monitoring &Evaluation all