Review Group 0221 Session 4: 28 th October 2008. 2 Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
144A – Calculation of Value at Risk (VAR) Simon Trivella – 24 th May 2007 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Global Poverty Action Fund Community Partnership Window Funding Seminar January 2014 Global Poverty Action Fund Community Partnership Window Funding Seminar.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Overview of Credit Risk Management practices in banksMarketing Report 1 st Half 2009 Overview of Credit Risk Management practices – The banking perspective.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Transfer & Trades Special Transmission Workstream
Review Group 0221: User Commitment Best Practise guidelines for Gas and Electricity Network Operators Credit Cover (2005)
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Transfers and Trades Transmission Workstream
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Review Group 221: 23 January Analysis of the impacts of the proposal on Users.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Interactions with the implementation of RIIO-T1
Credit Arrangements – Independent Assessments
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
CAP089/090/091 Working Group Report
Review Care Act 2014 This overview forms part of the suite of learning materials that have been developed to support the implementation of part one of.
Transmission Workgroup June 7th 2012
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Modification 501 slides for Workgroup
Proposed Transitional Gas Exit Arrangements
Further Credit Modification Proposals
Transmission Workstream – 6th July 2005
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Modification 0043 – Limitation on offering for sale unsold capacity
Review Group Action November 2008.
Entry Capacity Transfers - Constrained Period
Gemini Contingency Guidelines
Evolution of Expenditure Controls
Presentation transcript:

Review Group 0221 Session 4: 28 th October 2008

2 Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these requirements and how should this be assessed?” ie: by incremental capacity only; all new capacity bookings, including obligated; all new and existing capacity holdings based on a credit risk assessment; or a combination of the above Who/How would such a credit assessment be completed and what would be the route for appeal?  Agenda item 4.3 Question: Should any revision to security arrangements be applied to previous auction allocations that are yet to reach the capacity release date?

3 Who/What capacity holders should be captured by these requirements and how should this be assessed?  The Authority delivered its decision to reject CUSC Amendment CAP131 on 13 th October.  The decision paid particular attention to the issue of undue discrimination between new & existing generators where undue discrimination consists of treating relevantly similar parties differently or relevantly different parties in the same way without objective justification.  In this case the Authority did not consider that sound reasons for the apparent discrimination between new and existing generators had been demonstrated.  In this context does the Group consider that the decision assists in answering this question i.e. does this suggest that bullet point 3 is the most appropriate?  If not, what are the objective differences between parties and types of capacity?

4 Who/How would such a credit assessment be completed and what would be the route for appeal?  UNC Section V: Security required is based on = VAR – Unsecured Credit Limit VAR = Aggregate amount invoiced but unpaid (excluding EB Charges) + 20 * daily average rate invoiced in previous month. Unsecured credit limits are based on ‘Best Practice Guidelines for Gas and Electricity Network Operator Credit Cover’ and include the following elements. Method Unsecured Credit Limit (Maximum = 2% of RAV) Approved Credit Rating e.g. Moody’s or S&P Moody’s Assessment = Aaa/Aa Unsecured Credit Limit = (100% * 2% * RAV) = ~£60M = 15% or ~£9M) Independent Security Assessment e.g. Dun & Bradstreet Independent Assessment Score = 10 Unsecured Credit Limit = (20% * 2% * RAV) =~£12M Payment HistoryPayment History over 5 years Unsecured Credit Limit = (2% * 2% * RAV) =~£1.2M

5 Who/How would such a credit assessment be completed and what would be the route for appeal? Credit Assessment  There already exists a number of measures which could be used to develop a methodology to assess security requirements at, or around, the QSEC auction time. Are there any other measures which could be included in the assessment?  What issues need to be addressed if this assessment is to be carried out at or around this time?  Proxy for VAR ahead of invoice period. e.g. value of auction bids.  What should the security requirement cover? e.g. auction bid values (4 yrs, 8yrs or other) over period from Capacity Allocation to Release Obligation?  Potential reassessment of levels of unsecured credit i.e. is it currently too high/low?  Who should make the initial assessment? If its near to or within the Incremental Capacity Allocation Proposal process could this be part of the Authority’s assessment?  How should ongoing assessment of security requirement be carried out? Role for National Grid/Xoserve?  Appeals against initial assessment could be to Authority but for appeals arising after the initial period is there a role for National Grid/Xoserve similar to current dispute processes?

6 4.3 Question: Should any revision to security arrangements be applied to previous auction allocations that are yet to reach the capacity release date? Existing CapacityIncremental Capacity All pending capacity obtained via future QSEC / AMSEC auctions Apply to pending incremental capacity triggered in future QSEC auctions (a). All pending capacity obtained via future RMSEC / DSEC auctions Apply to pending incremental capacity with a release date after implementation of proposals but triggered in an earlier QSEC auction (b). All current and pending capacity obtained via previous QSEC / AMSEC or short-term auctions Apply to current incremental capacity with a release date before implementation of proposals but where the QSEC auction bids that triggered release extend after the date of implementation (c). QSEC auction (option c) Changes implemented QSEC auction (option a) QSEC auction (option b) Capacity release option b Incremental Capacity – Relevant QSEC auctions for various implementation options Capacity release option c Time Options available for re-allocation of financial risk in respect of entry capacity could include: