Remuneration & Monitoring n 1. Introduction n 2. Principal-Agent Theory n 3. Do incentives work? n 4. Empirical evidence.

Slides:



Advertisements
Similar presentations
1.
Advertisements

Managerial Economics & Business Strategy
Industrial Economics (Econ3400) Week 4 August 14, 2008 Room 323, Bldg 3 Semester 2, 2008 Instructor: Dr Shino Takayama.
Optimal Contracts under Adverse Selection
Performance related pay 1. Background 1. Background 2. Effects 2. Effects 3. Empirical evidence 3. Empirical evidence 4. Problems with PRP 4. Problems.
Internal labour markets & promotion ladders Internal labour markets (ILM) Internal labour markets (ILM) Predictions of ILM theory Predictions of ILM theory.
Contracts and Moral Hazards
Hal Varian Intermediate Microeconomics Chapter Thirty-Six
Chapter 9. THE MARKET FOR FACTORS OF PRODUCTION 1. Perfect markets Supply of Labour Demand for labour Distribution of Income when Markets are competitive.
Chapter 37 Asymmetric Information In reality, it is often the case that one of the transacting party has less information than the other. Consider a market.
Moral hazard and contracts
Chapter 14 Markets with Asymmetric Information. Chapter 17Slide 2 Topics to be Discussed Quality Uncertainty and the Market for Lemons Market Signaling.
1 . 2 Uncertainty Dixit: Optimization in Economic Theory (Chapter 9)
Chapter 15: Decisions Under Risk and Uncertainty McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 15 Decisions under Risk and Uncertainty.
14.1 Economic settings in which one side has better information than the other. Buying a Company Firm T is worth $20 a share or $80 (50-50 chances) depending.
Introduction Organizations have a relatively large degree of discretion in deciding how to pay. Each employee’s pay is based upon individual performance,
Recognizing Employee Contributions with Pay
1-1 McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Human Resource Management Gaining a Competitive Advantage Chapter 12 Recognizing.
Interactions of Tax and Nontax Costs n Uncertainty u Symmetric uncertainty u Strategic uncertainty (information asymmetry) F Hidden action (moral hazard)
Economics of Strategy Fifth Edition Slides by: Richard Ponarul, California State University, Chico Copyright  2010 John Wiley  Sons, Inc. Chapter 16.
Management Motivation Theories
QR 38 4/3/07, Uncertainty I. Risk II. Agency problems III. Asymmetric information and perceptions.
Managerial Economics and Organizational Architecture, 5e Managerial Economics and Organizational Architecture, 5e Chapter 15: Incentive Compensation McGraw-Hill/Irwin.
Asymmetric Information
Agency Problems and Incentives Kevin Hinde. Aims In this session we will analyse the meaning of the agency problem within organisations. And note how.
Ch 14 Agency. Principal-Agent Relationship Principal owns an asset Agent works on principal’s behalf to preserve on enhance the value of the asset Problem.
Game Theory “A little knowledge is a dangerous thing. So is a lot.” - Albert Einstein Topic 7 Information.
EXECUTIVE COMPENSATION Sven-Olof Yrjö Collin. Me: Sven-Olof Yrjö Collin - Professor in Business Administration with emphasis on Corporate Governance and.
Principal - Agent Games. Sometimes asymmetric information develops after a contract has been signed In this case, signaling and screening do not help,
Semester 2, Seminar 7 – Contracting & Accounting Information Financial Accounting.
Chapter 37 Asymmetric Information. Information in Competitive Markets In purely competitive markets all agents are fully informed about traded commodities.
Incentives: The Principal – Agent Problem
Prof. Dr. Friedrich Schneider Institut für Volkswirtschaftslehre Recht und Ökonomie (Law and Economics) LVA-Nr.:
Property Rights and Collective Action in Natural Resources with Application to Mexico Lecture 1: Introduction to the political economy of natural resources.
Recognizing Employee Contributions with Pay
© 2006 Pearson Education Canada Inc.9-1 Conflict Resolution Game Theory Agency Theory.
Copyright © 2009 by Pearson Education Canada Chapter 9 An Analysis of Conflict.
12-1 Incentives for Managers and Executives 12-1.
ACCT3003 Issues in Accounting Theory
IRWI N CHAPTER 16 Recognizing Individual Contributions with Pay ©a Times Mirror Higher Education Group, Inc., company, 1997.
Adverse Selection or Moral Hazard Rick’s Iron Skillet on South School changed formats and now offers a lunch buffet. The management has noticed that the.
The Moral Hazard Problem Stefan P. Schleicher University of Graz
This slideshow was written by Ken Chapman, but is substantially based on concepts from Managerial Economics and Organizational Architecture by Brickley.
Seeking Alpha: Excess Risk Taking and Competition for Managerial Talent Acharya, Pagano and Volpin Comment Alan Schwartz.
Economics of Strategy Slide show prepared by Richard PonArul California State University, Chico  John Wiley  Sons, Inc. Chapter 14 Agency and Performance.
© 2010 W. W. Norton & Company, Inc. 37 Asymmetric Information.
Asymmetric Information
Business Ownership and Control
Contracting The incentives of the employer (principal) and employee (agent) are different. A contract is designed to implement an outcome both parties.
Lecture 5 Financial Incentives This lecture is paired with our previous one that discussed employee benefits. Here we focus on the reasons why monetary.
ECO 340: Micro Theory Optimal Contracts Sami Dakhlia U. of Southern Mississippi
Economics 101 – Section 5 Lecture #17 – March 23, 2004 Chapter 7 -The Firms long-run decisions -The Principal-Agent problem Chapter 8 - Perfect Competition.
© 2010 Institute of Information Management National Chiao Tung University Chapter 7 Incentive Mechanism Principle-Agent Problem Production with Teams Competition.
Joe Mahoney University of Illinois at Urbana-Champaign
Frank Cowell: Microeconomics Moral Hazard MICROECONOMICS Principles and Analysis Frank Cowell Almost essential Risk Almost essential Risk Prerequisites.
1 Incentives and Agency Besanko, Dranove, Shanley, and Schaefer Chapters 14 and 15.
The Base Model. Objectives of the chapter Describe the basic elements of the Basic Principal-Agent model Study the contracts that will emerge when information.
Managerial Economics & Business Strategy Chapter 6 The Organization of the Firm.
AGENCY AND PERFORMANCE MEASUREMENT. The Principal/Agent Framework Agency Problem/Agency Conflict : # Principal's objection is to maximize value its receive.
Performance Measures and Incentives
Summary of Learning Objectives
Chapter 15: Decisions Under Risk and Uncertainty
Beyond Pay for Performance
Executive Compensation
Control: Organizational and Economic Approaches
Markets with Asymmetric Information
Performance Measures and Incentives
Chapter 15 Decisions under Risk and Uncertainty
Chapter 15: Decisions Under Risk and Uncertainty
Presentation transcript:

Remuneration & Monitoring n 1. Introduction n 2. Principal-Agent Theory n 3. Do incentives work? n 4. Empirical evidence

1. Background n What is the role of the wage? n (i) Allocation function u In a competitive economy, wages should act as guideposts informing people which occupation to take,…, or how long to stay in school, or when to change jobs… Polachek & Siebert, 1993 n (ii) Social stratification \ cohesion function u custom & practice, fair wages (Marshall, Hicks)

(iii) Management tool n Outcomes (I.e. output) depends on worker effort n Workers have free will u effort & specific skills u effort is a bad, higher wages are a good n Firms wish to maximise effort / skill use n Divergence of interests n Informational asymmetries n Workers act opportunistically

2. Theory Principal-agent problem Shareholders Board of Directors CEO, managers Supervisors, workers Profit Pay, growth

How does the principal ensure that the agent supplies maximum effort? n Designing the optimal contract u a) available information u b) distribution between managers & workers u c) attitudes to risk of principal & agent n 1. Perfect information F effort & other factors affecting output (Q) are observable & measurable F no agency problem F contract: Q = f(e); if Q is produced, worker paid W F no monitoring by principal

2. Symmetric information n Assume F Q = Q(e, ) F is a random (stochastic) variable n reflects state of nature F weather F breakdowns, supply problems F Macroeconomic conditions n = unobservable n Q is therefore stochastic - output is uncertain - See Table 1 n Assume that is known to worker/firm

Table 1 Output when e and vary A) Uncertainty of outcome! B) If is known, a contract specifies e 1 if ave and e 2 otherwise; C) What should W be?

Wages and attitudes to risk n Fixed wage - principal bears the risk n Variable wage - risk sharing n Should the risk be shared? u Depends on attitude to risk e.g. F risk averse managers F risk neutral shareholders F shareholders should bear all the risk. Why?

3. Risk, uncertainty & asymmetric (imperfect) information n (i) is unknown n (ii) the effect of e and on Q cannot be determined n (iii) …but effort is known to the worker n Paying a wage conditional on e may not lead to Q max n Why?

3. Optimal contract - incentive to deliver e 1 n Offer a contract to maximise expected F E{ [(Q(e, ) - w(Q(e, ))]} n Subject to (a) workers optimal level of effort F E{u[e,w(Q(e, ))]} F i.e.incentive compatibility constraint F nb if bad then e 1 may still result in low wage i.e. risky n And (b) the participation constraint

The participation constraint n Utility associated with a contract u* F E{u[e,w(Q(e, ))]} u* n Thus n If workers are risk averse, what type of contract will maximise effort and hence Q? n i.e. output = 3,000 rather than 1,000

Figure 2: Optimal contract for worker A YAYA XAXA Y=X certainty line u0u0 u1u1 High output 1 Low output W=f(Q) Q=f( )

Figure 2: Optimal contract for worker A YAYA XAXA Y=X certainty line u0u0 u1u1 High output Low output W=f(Q) Q=f( ) a b

Figure 2: Optimal contract for worker A YAYA XAXA Y=X certainty line u0u0 High output Low output W=f(Q) Q=f(, e) w0w0

Figure 2: Optimal contract for worker A YAYA XAXA Y=X certainty line u0u0 High output Low output W=f(Q) Q=f(, e) w0w0 a b c

Figure 2: Optimal contract for worker A YAYA XAXA Y=X certainty line u0u0 High output Low output W=f(Q) Q=f(, e) w0w0 a b c u1u1 w1w1

Figure 2: Optimal contract for worker A YAYA XAXA Y=X certainty line u0u0 High output Low output W=f(Q) Q=f(, e) w0w0 a b c u1u1 w1w1 r

Figure 2: Optimal contract for worker A YAYA XAXA Y=X certainty line u0u0 High output Low output W=f(Q) Q=f(, e) w0w0 a b c u1u1 w1w1 r fixedVariable

3. Do incentives work? n Yes, Old Pay versus New Pay n Old pay systems F job evaluated grade-wage structure F pay = f(time, seniority, job characteristics) n New Pay systems F Pay related to firms strategy F Flexible & variable pay systems F Higher pay for workers with more competence i.e. skills & knowledge

Types of incentive scheme n (i) Performance-related pay n (ii) Piece rates: w = f(Q) n (iii) Commission on sales n (iv) Group-based PRP I.e. bonus systems (US = gainsharing) n (v) Profit sharing