Maintenance & Rehabilitation Strategies Lecture 5.

Slides:



Advertisements
Similar presentations
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Advertisements

Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
Life-Cycle Cost Analysis
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Selecting the Right Maintenance Treatment Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
Perpetual Pavements Concept and History Iowa Open House
Pavement Type Selection (Designs, Costs & Bidding) 9 th Annual Concrete Conference for the Maryland Transportation Industry March 24, 2009 Timonium, MD.
Pavement Design CE 453 Lecture 28.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 2 Surface Characteristics.
Ministry of Transportation RISK MANAGEMENT FOR GEOMETRIC DESIGN AASHTO Sub-Committee Design July 2009 Gary Todd, P. Eng. Manager, Design & Contract Standards.
Lecture 12 Lecture 1L PAVEMENT CONDITION INDICES.
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
CVE 506 HIGHWAY AND TRANSPORTATION ENGINEERING II DR O.S ABIOLA Dept. of Civil Engineering University of Agriculture,Abeokuta.
Pavement Analysis and Design
A Urban Highway Infrastructure: Design For Long, Long Life Michael I. Darter, Ph.D, PE Principle Engineer, ARA, Inc. Director, Pavement Research Institute,
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
OPTIMIZATION Lecture 24. Optimization Uses sophisticated mathematical modeling techniques for the analysis Multi-step process Provides improved benefit.
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
Life Cycle Cost Analysis
PERFORMANCE MODELS Lecture 16. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
PRIORITIZATION.
Economic Analysis in Transportation Systems Tapan K. Datta, Ph.D, P.E. CE 7640: Fall 2002.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Benefit Cost Analysis Nathaniel D. Coley Jr
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
1 Ministry of Transport, Public Works and Water Management.
Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Pavement Preservation Preventive Maintenance
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
Carrying Capacity (CC) and LAC
THE WAY FORWARD or WHO SAID RESEARCH WAS EASY ?. Relationship between variables  x Y = (say) roughness after 5 years Poor Good Expectation for acceptable.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Project TX Strategies to Improve and Preserve Flexible Pavement at Intersections UTEP - Soheil Nazarian - Imad Abdallah - Carlos Solis Project Duration.
PERFORMANCE MODELS. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability Describe requirements.
Session 5 Techniques for Determining Pavement/ Treatment Feasibility.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Road Network Evaluation Tools (RONET) Version 2.00 January, 2009 Rodrigo Archondo-Callao.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank.
Chapter 9 Capacity and Level of Service for Highway Segments
TRANSPORTATION ENGINEERING-II
1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
HDM-4: Pavement Deterioration Modeling and Road User Effects
FUZZY APPROACH FOR ESTABLISHING THE PAVEMENT CONDITION QUALITY INDEX Gwo-Hshiung Tzeng Institute of Technology Management and Institute of Traffic and.
0 Freight Activities: Year in Review Dec. 12 th 2015.
Road Investment Decision Framework
Transportation Asset Management PM Peer Exchange Performance Reporting and Target Setting (Section 2): VDOT’s Experience Connie Sorrell Chief of System.
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Caldwell and Wilson (1999) 1. Determine primary rating factor for a road section based on traffic volume and user types 2. Primary rating factor is then.
Multi-Year Programming and Predictive Modelling
Presenters: Sumon Roy1 and Badrul Ahsan1
Pavement condition index calculation
Pavement Design  A pavement consists of a number of layers of different materials 4 Pavement Design Methods –AASHTO Method –The Asphalt Institute Method.
Introduction and Applications
Transportation Engineering
Pavement Preservation
Calculating Dimensions for a Typical Pavement Section using 1993 AASHTO Flexible Pavement Design Guide.
NRRA Pavement Workshop 2019
Presentation transcript:

Maintenance & Rehabilitation Strategies Lecture 5

Serviceability, Structural, Surface and Safety Surface Distress Index (SDI) Present Serviceability Index (PSI) Riding Comfort Index (RCI) Pavement Condition Index (PCI) International Roughness Index (IRI) Pavement Condition Indices

Establishing Criteria A criterion is a specified limit for some measure of pavement behavior, response, performance, and deterioration or operating specific against which comparison of actual measurements or estimates can be completed. Example: the limit of PSI =2. 0 set at a minimum acceptable level for collector highway pavement, then any section with 2.0 or less would be represent a deficiency.

Establishing Criteria Cont. At the network level, criteria can be used to Provide an objective basis for identifying current needs and estimating future needs; Provide consistency between sections and between classes of roads; Have a means for effectively showing current and future accumulations of the work or deficient mileages. At project level, criteria have usually been in terms of specification.

Examples

Establishing Criteria Cont. In general, all performance measures (individual index or combine ones) described so far plus Traffic delay Vehicle operation cost

Factors Affecting Criteria Limits Type and functional class of facility (rural or urban, freeway, arterial, collector, or local). This is the main factor. Size of pavement network and type of agency (federal, state, local). Resources, budgets and policies of the agency.

Effects of Changing Criteria 1)Advance or delay the needs years; equally to decrease or increase the amount of deficient mileage. 2)Changing the criteria can affect the list of feasible rehabilitation actions. 3)Lowering the minimum acceptable values for PSI/SDI would be to increase the amount and cost of corrective maintenance required, traffic disturbances and vehicle operating costs.

Examples (not recommendations)

Prediction Models for Pavement Deterioration Purely mechanistic: based on some primary behaviors such as stress, strain or defalcation. Mechanistic empirical: related to deterioration such as distress or roughness. Regression: related to one or more independent variables like subgrade strength, axle load applications and pavement layer thickness. Subjective: using transition process models.

Classification of Predication Models

Determining Needs The action year can be advanced, which may be desirable for certain section such as those carrying high traffic volumes: Economic benefits. Could be the feasible action years by changing the minimum acceptable level for the measures of pavement deterioration

Needs Year and Action

Decision Making in R&M Decision making in R&M is to select a feasible R&M alternative from a set of available alternatives for a specific type of deficiency. First step is to clearly identify a feasible set of R&M alternatives for each type of deficiency, based on costs, physical restraints and condition of the existing pavement.

R&M alternatives used in Ontario

R&M Categories Preventive: such as chip seals, crack sealing, thin overlays, usually at levels of pavement deterioration considerably above the acceptable limits Corrective: such as hot- and cold-mix patching, usually at levels of deterioration near or even below the acceptable limits Emergency: is often related to safety and time, with cost not being a primary consideration.

Categories of Pavement Maintenance

Examples wwatch?v=yy1tWWHvV-w wwatch?v=yy1tWWHvV-w

State of the Art of R&M Service life for each R&M has been estimated by many transportation agencies. This is heavily engineering experience based. Actual deterioration models in terms of many performance measures remain to be developed for most of the R&M alternatives

Methods for Decision Making in R&M The process used to select feasible rehabilitation alternatives from a set of available alternatives can range from simple judgment to a decision tree of expert systems approach which considers several combinations of factors. Judgmental systems (practical experience). Knowledge-based expert systems (consider various combinations of factors) Deterioration model

Example of Judgmental systems

Example of Decision Tree (Matrix Form)

Example of Decision Tree (Expert Systems)

Cost Benefit Analysis R&M costs include: 1) Cost of the actual work (material, transport, placement, labor, etc.) Straight forward calculations. Many agencies have manuals for carrying out the necessary calculations. Future rehabilitation alternatives can be estimated in terms of costs discounted back to the present or using the following equation: Present worth= future cost x present worth factor (PWF) Where: PWF = 1 / (1 + i) n n= number of years to the rehabilitation implementation i= discount rate

Cost Benefit Analysis Cont. 2) Vehicle operating costs (VOC) Vehicle operating costs are the costs associated with owning, operating, and maintaining a vehicle and include fuel consumption, oil and lubrication, tire wear, repair and maintenance, depreciation, and license and insurance The differences in VOC occurring between a rehabilitation action and no rehabilitation can be considered a measure of the relative difference in benefits.

Example: Relative benefits and costs for rehabilitation (overlay)

Cost Benefit Analysis Cont. 3 ) Cost of user delay The costs associated with highway users’ time. User delay costs help quantify costs associated with slow downs due to construction and maintenance activities and denial-of-use. User delay costs are the most difficult and most debated life-cycle cost to exactly calculate because they involve assigning a dollar value to individuals’ delay time. Very few agencies consider user delay costs directly. One of the reasons to not consider user delay cost is that these are not a part of the agency’s budget.

Example: User delay costs

Cost Benefit Analysis Cont. 4) Accident cost (not used in cost calculation) The costs associated with highway accidents. Generally crash costs are categorized into fatality, non-fatal injury and property damage only Federal Highway Administration (FHWA) report “Crash Cost” Fatality (K) = $4,008,900/fatal crash Injury (A/B/C) = $82, 600/ injury crash Disabling Injury (A) = $216,000/disabling injury crash Evident Injury (B) = $79,000/evident injury crash Possible Injury (C) = $44,900/possible injury crash PDO (O) = $7,400/PDO crash

Cost Benefit Analysis Cont. 5) Environmental damage (not used in cost calculation) These costs include traffic noise, as well as the pollution created and energy expended in the construction and upkeep of a pavement facility.

The Different components of Road User Costs

References df df analysis/ analysis/ HIGHWAY SAFETY MANUAL wwatch?v=yy1tWWHvV-w wwatch?v=yy1tWWHvV-w