Session 2 Introduction to Pavement Preventive Maintenance Concepts.

Slides:



Advertisements
Similar presentations
Tennessee Department of Transportation ITS Mobility and Operations Summit Performance Measures November 18 – 19, 2009.
Advertisements

From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Life-Cycle Cost Analysis
HB1438 Update & Statewide Capital Planning Initiative Office of State Finance Department of Central Services November 8, 2011.
EVOLVING DEMANDS Highway Usage Increased 29% in the 1990’s Truck Traffic Increased 40% in the 1990’s Truck Traffic Will Increase 3% per year in next 20.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
To Pave or Not to Pave? Making Informed Decisions on When to Upgrade a Gravel Road.
Infrastructure Planning and Funding MID-REGION COUNCIL OF GOVERNMENTS MID-REGION METROPOLITAN PLANNING ORGANIZATION MARCH 19, 2015 NAIOP-NEW MEXICO CHAPTER.
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
The Dalles Pavement Preservation Program Presented by Bill Barrier Transportation Manager City of The Dalles Public Works Department.
A Urban Highway Infrastructure: Design For Long, Long Life Michael I. Darter, Ph.D, PE Principle Engineer, ARA, Inc. Director, Pavement Research Institute,
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
MAP Washington State Public Transportation Symposium August 26, 2013.
Office of Project Development Department of Highways Retreat June 12, 2008.
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
Preventive Maintenance
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Optimal Highway Durability in Cold Regions Jia Yan Washington State University 18 June 2015.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
June 25, 2013 System Preservation Guide. June 25, 2013 Study Purpose and Goals 1.Analyze existing road conditions 2.Comparison of funding versus road.
THE FUTURE OF TRANSPORTATION FUNDING AN ALDOT PERSPECTIVE December 3, 2014.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
Economic Analysis: Applications to Work Zones March 25, 2004.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
National Highway Institute Federal Highway Administration
Pavement Preservation Preventive Maintenance
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Forecasting and Evaluating Network Growth David Levinson Norah Montes de Oca Feng Xie.
Asset Management Maintenance Management System
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Julie Skallman State Aid Division Director & State Aid Engineer.
Minneapolis Regional Chamber of Commerce, Critical Issues Forum Charlie Zelle, Commissioner Minnesota Department of Transportation.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
By Larry Galehouse, Director, National Center for Pavement Preservation and Jim Sorenson, Team Leader, FHWA Office of Asset Management by Larry Galehouse,
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
1 Grant Anticipation Revenue Vehicles (GARVEE) Bond Presented to the California Transportation Commission July 25, 2007.
Highways Investment Strategy May Background 1,100 km of roads One of the lowest spends in the country Consecutive years of severe weather Significant.
Moving Ahead The American Public Speaks on Roadways and Transportation in Communities Federal Highway Administration Industry Briefing March 20, 2001.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
1 Ownership.Trust and respect. Inclusion and support. Sustainability. Innovation. Inspiration and passion. Paul Tysoe Asset Management Engineer Northamptonshire.
Next Steps.  To begin Planning Council discussion about the MPO’s Next Steps. Now that the 2035 Regional Transportation Plan has been updated and adopted,
Community Crossings Matching Grant Fund Program Kathy Eaton-McKalip
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
Road Pavements and New Approaches! IPWEA CONFRENCE David Moloney Director Infrastructure - Southern Grampians Shire.
2017 Education Series – NCHCA/CEO/City of Ottawa February 24, 2017
Boulder Junction Town Road Improvement Project
Boulder Junction Town Road Improvement Project
TIBC Road Maintenance Sub-Committee Meeting
Presentation transcript:

Session 2 Introduction to Pavement Preventive Maintenance Concepts

Learning Objectives 1.Describe the defining characteristics of pavement PM 2.Explain expected benefits 3.Identify obstacles to implementation 4.Describe experiences of several agencies Upon completion of this module, you will be able to:

Defining Characteristics of Pavement PM  Tool for pavement preservation  Planned strategy  Cost effective treatments  Maintains or improves functional condition  Does not increase structural capacity

Philosophy of Preventive Maintenance Applying the right treatment... To the right pavement... At the right time

Does a Preventive Maintenance Program Work? Few agencies have PM programs… why should they?

Expected Benefits from Preventive Maintenance  Improved pavement performance  Greater customer satisfaction  Smoother roads  Fewer construction delays  Long term cost savings/leveling  Increased safety  Others?

Expected Benefits Improved Pavement Performance  Preventive maintenance helps to preserve a pavement and extend its performance  Overall condition of network improves

Expected Benefits Improved Pavement Performance Reactive Maintenance Time or Traffic Pavement Condition Preventive Maintenance

Expected Benefits Greater Customer Satisfaction  Roads exist to serve the traveling public  What is the public’s view of roads?  Are our agencies organized to address the public’s views?

1995 NQI Survey of Users  Moderate level of satisfaction with highway system  Considerable opportunity to improve customer satisfaction  Prefer permanent over temporary repairs  Complete construction in a timely fashion

2001 NPHQ Update  65 % satisfied with their routes (an increase of 15 % since 1995)  6 % increase in dissatisfaction  Heavier traffic flows  Work zone delays

Washington State Survey  Roadway surface maintenance is the highest priority maintenance activity  Public is willing to pay more to:  Achieve desired levels of maintenance  Reduce future costs

Arizona Survey  #1 priority: safety (85 %)  #2 priority: preservation (46 %)  Over 60 % would be willing to pay more taxes to improve maintenance service levels  90 % would be willing to spend more now to save money in the long term

California Survey  Ranking of public priorities  Maintenance response to accidents/disasters  Safety  Pavement conditions  Traffic flow

Minnesota Market Research  Public wants smooth roads, convenience  Customers rate outcomes, not outputs  Customers rate products, not activities  Customer satisfaction requires measuring what is important to the customer

Expected Benefits Long Term Cost Savings/Leveling  Extended time to major rehabilitation, more frequent/less expensive treatments, fewer lane closures all contribute to… Lower life-cycle costs  Smoother roads, fewer delays contribute to… Lower user costs

Expected Benefits Increased Driver/Worker Safety  Better functional characteristics  Better friction  Fewer defects  Smoother roads  Fewer closures (work zones)  Shorter projects

Other expected benefits?

Obstacles to Implementation  Benefits not well documented  Requires initial and annual funding  Public perceptions  Agency management resistance

Obstacles to Implementation Lack of Documented Benefits  Agencies typically use worst-first  Some not familiar with treatments  Most do not use treatments in preventive applications  Long term benefits not well documented  Variations in local conditions: results from other studies acceptable?

Obstacles to Implementation Initial and Annual Funding  Funds still needed for rehabilitation and reconstruction  PM treats a category of pavements previously left alone  Requires dedicated and recurring funding: redirected or new $  Is such funding available?

Obstacles to Implementation Overcoming Public Perception  Public understands worst-first  Public complains about local defects rather than overall improvements  Public attitudes toward agency  Can the public understand treating pavements that look good?

Obstacles to Implementation Agency Management Resistance  Priority of maintenance?  Benefits of maintenance actions?  Policy making and personnel changes?  What information is needed to persuade management?  State internal policy

Positive Agency Experience  California  Michigan  Georgia  New York  Others

California  Decision to reduce the number of lane miles that need rehabilitation  A preventive maintenance strategy was analyzed  Presented to CTC in July 1996  10-year program (SHOPP) submitted in 1998

Program Funding

Category Routine Maint. Preventive Maint. CAPM Rehabilitation Current Funding $70 $50 $75 $300 $495 Projected Increase $53 Funding Steady State $50 $75 $50 $100 $275

Reported Cost Savings  4:1 to 6:1 overall cost benefit with preventive maintenance treatments

Georgia  Began current strategy approximately 25 years ago  Commitment to perform rehabilitation  10 % of road network each year  Network resurfaced every 10 yrs  Do not build any roads they can not maintain

IRI at Treatment

Lessons Learned  Policy has improved conditions  Now at steady-state condition  State must expand its preventive maintenance program  Support from top management is critical  PATIENCE; benefits are not immediate

Michigan  Implemented a Preventive Maintenance Program in 1992 with passage of ISTEA  Pavements  Bridges  Preventive maintenance extends the remaining service life of pavements and bridges

Funding Allocation  Funds distributed to 7 Regions based on need  Regions can distribute funds as needed  1998 distribution  Joint/crack sealing$10 million  Surface seals$19 million  Enhancements$25 million

Project Selection  Regions select projects based on goals assigned by central office  Goal is 95 percent of expressways and 85 percent of trunk highways in good to fair condition in 10 years  Procedure to plan, design, and let projects within 22 weeks

Maturing of the Plan  All projects are delivered in first 6 months of fiscal year  PMS used as network planning tool and to assist in treatment selection  Structural design does not consider preventive maintenance even though extended life is expected

Reported Cost Savings  Initial preventive maintenance costs 14 times less than rehabilitation or reconstruction  $700 million savings from 1992 to 1996  Overall LCCA appears to be 6:1

New York  Established the Dedicated Highway and Bridge Trust Fund  Received money from gas tax  Established system for preservation of state capital assets  Dept. annually prepares 5-year plan for preventive maintenance of highways and bridges

Pavement Condition Trends

Maturing of the Program  Vendor in place paving  Asphalt delivered to site by vendors  Placed and compacted by state forces  Simplified contracts  Simplification of normal process  Limited to 15 pay items, work done in one month, and one final payment  Changes to treatments  Safety appurtenance program

Meeting Agency Objectives  Developing objectives vs. meeting objectives  What are the goals?  Are they being met?  What changes are needed to the program?

Review of Learning Objectives 1.Define pavement preventive maintenance 2.Explain expected benefits 3.Identify obstacles to implementation 4.Describe experiences of several agencies