Jerry Blazey May 31, 2007 LCWS07 1 SiD: Hadron Calorimetry Jerry Blazey Northern Illinois University LCWS07-Hamburg May 31, 2007.

Slides:



Advertisements
Similar presentations
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Advertisements

31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
Fiberless Coupled Tiles for a High Granularity Scintillator-SiPM Calorimeter Rick Salcido Northern Illinois University November 14, 2009 Prairie Section.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Andy White U.Texas at Arlington (for J.Yu, C.Han, J.Li, D.Jenkins, J.Smith, K.Parmer, A.Nozawa, V.Kaushik) 10/18/04 IEEE/NSS Digital Hadron Calorimetry.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
GEM Digital Hadron Calorimetry
Towards an RPC-based HCAL Design Stephen R. Magill Argonne National Laboratory Digital HCAL for an E-Flow Calorimeter Use of RPCs for DHCAL RPC Design.
Andy White University of Texas at Arlington For GEM DHCAL Group ESTB Workshop SLAC 2012 Introduction KPiX Readout FTBF Beam Test Setup Beam Test Analysis.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
José Repond Argonne National Laboratory Status of the DHCAL Project SiD Collaboration Week January 12 – 14, 2015 SLAC.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Recent DHCAL Developments José Repond and Lei Xia Argonne National Laboratory Linear Collider Workshop 2013 University of Tokyo November 11 – 15, 2013.
Tests of a Digital Hadron Calorimeter José Repond Argonne National Laboratory CALICE Collaboration Meeting March 10 – 12, 2010 University of Texas at Arlington.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Update on DHCAL and RPC progress Lei Xia ANL - HEP.
May 31, 2007CALICE DHCAL J. Yu 1 Gas DHCAL R&D May 31, 2007 WWS CAL R&D Review, DESY Jae Yu University of Texas at Arlington For CALICE DHCAL Groups Introduction.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Lei Xia ANL – HEP. Physics prototype: proof of principle Linearity CALICE SiW ECAL.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
1 Progress from José Repond Argonne National Laboratory LCWS 2007, DESY, May 30 – June 3, 2007 Emphasis on test beam results.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Digital Hadron Calorimetry for the International Linear Collider Using Gas Electron Multiplier Technology Andy White University of Texas at Arlington (for.
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Future DHCAL Activities José Repond Argonne National Laboratory CALICE Meeting, CERN, May 19 – 21, 2011.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Andy White University of Texas at Arlington For GEM DHCAL Group CALOR 2012 Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test Analysis.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Thick-GEM sampling element for DHCAL: First beam tests & more
SiD R&D Plan and Opportunities for New Collaborators
CEPC 数字强子量能器读出电子学预研进展
A Digital Hadron Calorimeter Resistive Plate Chambers
Recent DHCAL Developments
SiD Calorimeter R&D Collaboration
Construction and Testing of a Digital Hadron Calorimeter Prototype
(My personal) CALICE Report
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
GEM-based Digital Hadron Calorimetry for SiD
Rick Salcido Northern Illinois University For CALICE Collaboration
Tests of a Digital Hadron Calorimeter
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

Jerry Blazey May 31, 2007 LCWS07 1 SiD: Hadron Calorimetry Jerry Blazey Northern Illinois University LCWS07-Hamburg May 31, 2007

Jerry Blazey May 31, 2007 LCWS07 2 HCAL Considerations Guiding PrinciplesGuiding Principles –Optimized for PFA –Small radius to improve resolution, control costs BaselineBaseline –Gap size <~10mm –Barrel: mm SS absorbers  4  o –Two endcaps –Resistive Plate Chambers Major questions:Major questions: –Absorber: SS or W? –Segmentation: 1cm 2 through 9cm 2 ? –Sampling needed beyond magnet? –Active medium?

Jerry Blazey May 31, 2007 LCWS07 3 More on PFA Requirements Tracking:Tracking: –Efficiently allow tracking of charged particles through volume. Jet Resolution:Jet Resolution: –Sufficient depth such that any loss in the coil or energy measured with degraded resolution (relative to the HCal) in the outer detectors does not significantly impact jet energy resolutions. –Sufficient cell size allows true and efficient separation and association of closely spaced energy clusters with the correct tracks. –Sufficient sampling so as not to significantly degrade the jet energy resolution via the sampling term. Simulations are essential, especially for understanding design parameters and technology capabilities, these efforts are covered in the next talk by John JarosSimulations are essential, especially for understanding design parameters and technology capabilities, these efforts are covered in the next talk by John Jaros

Jerry Blazey May 31, 2007 LCWS07 4 Readout Technologies Under Consideration Gaseous Readout: fine segmentation, straightforward assembly, inexpensiveGaseous Readout: fine segmentation, straightforward assembly, inexpensive –Resistive Plate Counters –Gaseous Electron Multipliers & Micromegas Scintillator Readout: high sampling fraction, well understoodScintillator Readout: high sampling fraction, well understood –Solid state photomultipliers (MPPC, SiPM, MRS…) Basic approachBasic approach –Demonstrations –Simulations Leading to Large Prototypes

Jerry Blazey May 31, 2007 LCWS07 5 R&D Well Matched to CALICE TechnologyTechnology –Gain large scale, long-term experience with Now Scin/solids readoutNow Scin/solids readout Next gaseous detectorsNext gaseous detectors –Identify critical operational issues Physics:Physics: –Structure of hadron showers –Validation of simulation –Development of particle flow algorithms Running at CERN and FNAL 2006 – 2008Running at CERN and FNAL 2006 – 2008 Numerous CALICE talks this weekNumerous CALICE talks this week Tail Catcher ECAL HCAL Electronic Racks Beam

Jerry Blazey May 31, 2007 LCWS07 6 Resistive Plate Chambers RPCRPC –Single Gap –Coated glass as resistive plates –Avalanche mode Small pads ~1cm 2Small pads ~1cm 2 –Reduce confusion between tracks and clusters –1 bit resolution preserves single particle resolution Resistive paint Mylar 1.2mm gas gap Mylar Aluminum foil 1.1mm glass - HV Signal padsAnalog Digital (0.5x0.5) Digital (2.5x2.5) Digital (3.0x3.0) E(GeV)  /E Pion Resolution Non-projective SiD SiD Members: Argonne National Laboratory

Jerry Blazey May 31, 2007 LCWS07 7 Prototype RPC Results Parameter space thoroughly explored:Parameter space thoroughly explored: –One or two gas gaps –One or two glass plates –High or low resistivity coatings –Streamer and avalanche mode –Gas mixtures –Voltage –Stability Performance metrics investigated with sources, cosmic rays, and beam:Performance metrics investigated with sources, cosmic rays, and beam: –MIP detection efficiency vs Multiplicity –Noise rate –Rate capability Digital/Cosmics Measurement RPC Russia RPC US Signal characterization yesyes HV dependence yesyes Single pad efficiencies yesyes Geometrical efficiency yesyes Tests with different gases yesyes Mechanical properties ?yes Multi-pad efficiencies yesyes Hit multiplicities yesyes Noise rates yesyes Rate capability yesyes Tests in 5 T field yesno Tests in particle beams yesyes Long term tests ongoingongoing Design of larger chamber ongoingongoing SiD Members: Argonne National Laboratory

Jerry Blazey May 31, 2007 LCWS07 8 RPC Slice Test Ten chamber, 2500 channel “test slice” in development for June 2007 FNAL beamTen chamber, 2500 channel “test slice” in development for June 2007 FNAL beam –New chamber design –Cosmic ray and test beam stacks assembled –Ten RPCs with complete (RPC and GEM) readout chain: 64 channel pad boards64 channel pad boards FE boards and DCAL ASICFE boards and DCAL ASIC Data concentrators and collectorsData concentrators and collectors Timing and trigger units.Timing and trigger units. –Prototype and production underway Preliminary work for a 400k channel 1m 3 prototypePreliminary work for a 400k channel 1m 3 prototype HV Mylar Signal Pad(s) Fishing line Channel Resistive paint Gl ue Gas volume Signal path Glass Just commissioned!

Jerry Blazey May 31, 2007 LCWS07 9 Gas Electron Multipliers -2100V ∆V ~400V 0V Foil separates drift and amplification gapFoil separates drift and amplification gap PCB for anode ~1x1cm 2 pixel readout possiblePCB for anode ~1x1cm 2 pixel readout possible Uniform, MIP efficient, and fast.Uniform, MIP efficient, and fast. Digital performance encouragingDigital performance encouraging SiD Members: University of Texas-Arlington, Washington

Jerry Blazey May 31, 2007 LCWS07 10 Prototype GEM Results Small prototype tests similar to those for RPCSmall prototype tests similar to those for RPC –MIP efficiency ~95% –Multiplicity 1.3 Focus has been on production of chambers with large foilsFocus has been on production of chambers with large foils Test beam efforts first in Korea and just recently at Fermilab (March-April)Test beam efforts first in Korea and just recently at Fermilab (March-April) Efficiency and cross- talk measurement analysis underway (CALICE talk)Efficiency and cross- talk measurement analysis underway (CALICE talk)

Jerry Blazey May 31, 2007 LCWS07 11 GEM Plans Participating in slice effort (2007)Participating in slice effort (2007) Testing ASIC designs as wellTesting ASIC designs as well –Fermilab DHAL –SLAC KPiX InvestigatingInvestigating –3M-company 30cmx1m foils (2007, beam 2008) –Thick GEMS (2008) And preparing for 1m 3 prototypeAnd preparing for 1m 3 prototype SiD Members: University of Texas-Arlington, Washington

Jerry Blazey May 31, 2007 LCWS07 12Micromegas Similar to GEMsSimilar to GEMs Fine mesh separates 3mm drift and 0.1mm amplification gapsFine mesh separates 3mm drift and 0.1mm amplification gaps Can produce planes in a single lamination process – “bulk micromegas” used for T2K prototypes.Can produce planes in a single lamination process – “bulk micromegas” used for T2K prototypes. SiD Members: LAPP-Annecy

Jerry Blazey May 31, 2007 LCWS07 13 Micromega Plans First phase:First phase: –Design and production of small “bulk: prototypes –Three 6x16 pad planes built. –Study with sources and cosmic rays. Second Phase:Second Phase: –80x320 mm 2 PCB with integrated electronics under design. –Sixteen planes will be combined into a 640x640 mm 2 detector –Beam tests and studies SiD Members: LAPP-Annecy

Jerry Blazey May 31, 2007 LCWS07 14 Scintillator/Solid State Scintillator, typicallyScintillator, typically –0.5mm thick –~3x3 cm 2 Configurations based on tiles & stripsConfigurations based on tiles & strips Sensors: Many vendors…Sensors: Many vendors… wavelength shifting fibre plastic scintillator MPPC 3x3cm² 5x100cm² SiD Members: Northern Illinois University, University of Colorado

Jerry Blazey May 31, 2007 LCWS07 15 Scintillator/MPPC Results Stable/Efficient –TCMT Fine Section MIPs –<2%variation –>95% eff. Linearity –AHCAL –Within 1-2% Containment –AHCAL+ECAL +TCMT –20 GeV Pion

Jerry Blazey May 31, 2007 LCWS )Understand/Optimize Direct Coupling 2)Construction of integrated Scin/sensor/readout PCBs 3)2007 test beam PositionCPTA(+/-15%)HamamatsuCenter100% 16.8+/-2.5 PE Edge92% 19.3+/-3.0 PE Corner71% Not Measured Center(no grease) Not Measured 10.8/-1.5 PE Scin/MPPC Direct Coupling & Plans SiD Members: Northern Illinois University, University of Colorado

Jerry Blazey May 31, 2007 LCWS07 17 SiD HCAL Steps Forward June, 2007 (LCWS07) ReportsJune, 2007 (LCWS07) Reports –Gaseous: GEM/RPC Slice Test –Scintillator/MPPC: CALICE analysis & direct coupling investigations Late 2007 Review:Late 2007 Review: –Evaluate technology options –PFA Simulations report –Completion 1 st generic engineering study –Decision on next prototype step for EDR Full stack or ILC prototypeFull stack or ILC prototype Mid-2008 Review:Mid-2008 Review: –Technology choice or choices for CDR –Review progress of prototype projects

Jerry Blazey May 31, 2007 LCWS07 18 Performance CriteriaTechnology IssuesCost MIP efficiency/padMaturity and historyDevelopment costs Hit multiplicity/padReliabilityAssembly and test costs Uniformity of response across active element Component availabilityActive layer % of total Ease of calibrationActive layer thicknessTotal HCal cost Track/cluster separabilitySmallest element size Response to neutronsEase of assembly, testing, installation, commissioning PFA jet resolution at Z-pole, 200 Gev, 500 GeV Recovery time after i) hits & ii) significant beam event Rate of discharge (gas) Ageing affects Sensitivity to magnetic field Technical risk

Jerry Blazey May 31, 2007 LCWS07 19 Closing Comments SiD has made progress with baseline HCAL using RPCs.SiD has made progress with baseline HCAL using RPCs. Has intentionally left the door open for other possibilities including GEMs & Micromegas & Scin/Solid State Sensors.Has intentionally left the door open for other possibilities including GEMs & Micromegas & Scin/Solid State Sensors. Members are contributing to world-wide R&D efforts, particularly in the framework provided by the highly successful CALICE collaboration.Members are contributing to world-wide R&D efforts, particularly in the framework provided by the highly successful CALICE collaboration. Interplay between concepts and R&D efforts will yield more capable detectors.Interplay between concepts and R&D efforts will yield more capable detectors.