Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,

Slides:



Advertisements
Similar presentations
Ferrite outgassing results G
Advertisements

ENEN RF-induced heating on TCTP ferrite: comparison between different support materials F. Carra, A. Bertarelli, A. Dallocchio, M. Garlasche’,
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
Aluminum bellows for experiments
Engineering Department ENEN 16/08/2013 LR - BBC Pre-Study 1 STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY RESULTS G. MAITREJEAN, L. GENTINI.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Engineering Department ENEN Screwed solutions for the new tertiary collimator jaw assembly Federico Carra (CERN EN/MME) Geneva, 4 th September th.
A. Bertarelli, A. DallocchioLHC Collimation Phase II – Conceptual Review 02/04/2009 Phase II Collimators at CERN: design status and proposals LHC Collimation.
1.3GHz Input Coupler for ILC
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
News and hot topics Impedance meeting 14/04/2014.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting L. GENTINI.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Vacuum for DTL G.Vandoni on behalf of the TE/VSC Linac4 team 13 September, 2011G.Vandoni, TE-VSC1 Acknowledgements M.Malabaila, J.Hansen, A.Mongelluzzo,
Engineering Department ENEN Consequences and Possible Cause of Elevated Collimator Temperatures Collimation Working Group L. Mettler, F. Carra,
HRMT14 – Post Irradiation F. Carra on behalf of the HRMT14 team 189 th Collimation Working Group – 20 April, 2015.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
SPS High Energy LSS5 Thermal contact & cooling aspects
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
LCWS11 WG4 Fully featured accelerating structure engineering design
Crab Cavity Technical Coordination meeting:
Teleconference ACS – FREIA 31th May 2017
L. Gentini, A. Bertarelli, F. Carra
TCSPM Prototype Coating feasibility
Status of HRMT23 Activities F. Carra, E. Berthomé, G
Cryostat procurement, status and plan, QA/QC
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Review on collimator movement with stepping motors
Challenges of vacuum chambers with adjustable gap for SC undulators
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
2th EuCard Col/Mat WP Meeting
Superconducting RF Crab Cavities
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Review on collimator movement with stepping motors
Planning Quality control - Manufacturing logbook Photos Conclusions
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-0 and RC-1
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Presentation transcript:

Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini, P. Francon, P. Moyret On behalf of the TCTP/TCSP design, prototyping and manufacturing team

Engineering Department ENEN  MME deliverable  Status of sub-assemblies production:  Movable table  Vacuum tank  Jaw assembly  RF system  BPM cables  Future planning Outlook 24 June 2013A. Dallocchio – EN-MME2

Engineering Department ENEN Deliverables 24 June 2013A. Dallocchio – EN-MME3 Tank Jaw assemblyMovable table  EN/MME to provide EN/STI with 3 TCSP collimators (2 + 1 spare) inside a welded tank (same deliverable as CERCA during Phase I production); STI to prepare collimators for installation.

Engineering Department ENEN Movable table 24 June 2013A. Dallocchio – EN-MME4  All tables (6x) available and assembled  Several Tests performed on a (7 th ) prototype table on test-bench:  1 st complete Lifecycle endurance test (15’000 standard -135˚  Torque measurement every 5k cycles  Back-driving tests in all orientations without motors  3 months inactivity  2 nd complete Lifecycle endurance test (15’000 standard -135˚  Torque measurement every 5k cycles  Back-driving tests in all orientations without motors  Surface analysis of bearing shafts after 2 lifecycle tests, EDMS Tests passed !!!

Engineering Department ENEN Vacuum tank 24 June 2013A. Dallocchio – EN-MME5  All tanks (3x) assembled and available; cover to be welded after jaw installation.  Leak tests performed to assess the vacuum tightness of weldings and bellows.  Pressure tests performed on vacuum tank cooling circuits as prescribed on manufacturing drawings (30 bars pressure test). Tests passed !!!

Engineering Department ENEN Jaw assembly 24 June 2013A. Dallocchio – EN-MME6  All jaws (6x) assembled  Components cleaned following prescribed procedures as specified on drawings:  Cooling pipes, EMDS n EMDS n  Stainless steel, EDMS n EDMS n  Glidcop, EDMS n EDMS n  Copper-Beryllium RF contacts, EDMS n EDMS n  CFC Jaws recovered from Phase I production, re- machined to fit TCSP taperings (Firing procedure 1000˚C performed again)  Metrology measurements validate flatness requirements on all TCSP jaws, EDMS n EDMS n  Outgassing test performed on one TCSP jaw without ferrite. Document under preparation by G. Cattenoz.  BPM positioning with respect to active jaw surface within 0.05 mm of tolerance (as specified on drawings)  Pressure tests of cooling pipes 50 bar (20 minutes) Tests passed TE-VSC to formally confirm Tests passed TE-VSC to formally confirm

Engineering Department ENEN Jaw assembly – conductance tests 24 June 2013A. Dallocchio – EN-MME7  Conductance tests performed by I. Leitao in order to assess quality of jaw brazing.  Acceptance value 7000 W/m 2 /K (average value over jaw length).  All the 6 jaws are accepted. Conductance tests of TCSP jaws – courtesy of I. Leitao Tests passed !!!

Engineering Department ENEN RF system 24 June 2013A. Dallocchio – EN-MME8  Thermal treatment procedure developed by TE/VSC and EN/MME: 1000 ˚C, 48h in air + 48h under vacuum; EDMS document  Firing of 5 ferrite batches already performed (for 3 TCSP + 1 TCTP proto + 1 TCSM proto)  Material for ferrite housing and EM shielding: 316 LN (no CrO coating)  Maximum temperature accepted on ferrite: 100 ˚C (imposed by UHV requirements)  BE/ABP team to confirm the RF-induced losses in operation (end of June?)  RF contacts for end transitions same as Phase I RF system conform to UHV requirements BE/ABP inputs to be confirmed RF system conform to UHV requirements BE/ABP inputs to be confirmed

Engineering Department ENEN BPM cables 24 June 2013A. Dallocchio – EN-MME9  First BPM batch received in 2010; leak tight cables (4 out of 6) used for endurance test on table test bench, to be then re-used for TCSM prototype  16 pre-series TCTP cables received in July 2012 available for 1 proto and 3 series units  Delivery of TCSP cables still pending; expected by 28 th June  Outgassing test strategy for TCSP: 8 cables in one test run; (initial strategy: 4 cables in one test run, to be increased in case of positive results on the first batches)

Engineering Department ENEN Action list to complete TCSP assembly 24 June 2013A. Dallocchio – EN-MME10 1.BPM cables reception I.Measurements of the height of shafts shoulder for the positioning of the jaw into the tank (done) II.BPM cables electrical tests (C. Boccard) III.BPM cables outgassing tests (G. Cattenoz) 2.Collimator assembling I.BPM cables assembling on jaws II.Assembling of RF contacts on the top and bottom of the tank III.Assembling of jaws inside the tank and connection of BPM and T cables on the flanges; assembling of flanges + seals 3.Measurements and tests on assembled collimator I.Regulation of end stops and micro switches on 3D machine II.Control of position and flatness tolerances of jaws inside the tank III.Torque test IV.BPM test with antenna (C. Boccard) 4.Further actions before tank closure: 1.Welding of vacuum caps on the axes 2.Positioning of tank cover 3.Torque test before tank welding 5.Tank cover EB welding 6.Tests after welding: I.Leak test II.Outgassing test 7.Delivery to EN/STI; RF contacts in the transitions + limit switch to be assembled by STI

Engineering Department ENEN Time schedule 24 June 2013A. Dallocchio – EN-MME11  Delivery of BPM cables by end of June?  After cables reception, at least 10 days needed for electrical + outgassing tests  MME activities (listed in previous slide) take about 4 weeks per collimator  Assembly period right in the middle of summer holidays for most key players!  6 weeks needed by STI to prepare each TCSP for installation  Optimization of the planning will be performed once BPM cables delivery is confirmed

Engineering Department ENEN