David Nisbet – LIUWG 17 th July 2008 LIUWG – Options for Powering Phase I David Nisbet Summary of points from LIUWG 7 Existing topology Future topology.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Chapter 4 AC to AC Converters
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
E. Todesco HL-LHC: OUTLOOK ON PROTECTION FOR IR MAGNETS (WP3) E. Todesco CERN, Geneva Switzerland CERN, 23 rd April 2015 MPE meeting.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
Fk. Bordry AB/PO Academic Training - 27th March 2003 Technological Challenges for the LHC Power converters for the LHC Frédérick BORDRY AB-PO ? I(A) t.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
Analog to Digital Converter David Wallace English 314.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
October, 2009 Magnet Electrical Systems Bob Lambiase October, 2009 Internal Review.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
Actual Circuit Total inductance:15.4 H (154x0.1H) Total resistance:1 m  RB output current:13 kA RB output voltage:190 V Main Power Converter RB circuit.
R. van Weelderen, LIUWG, IT upgrade phase I: Status of cryogenic scheme evolution (in work) Outline - Old & new layout - Design constraints.
Faster ramp rates in main LHC magnets Attilio Milanese 7 Oct Thanks to M. Bajko, L. Bottura, P. Fessia, M. Modena, E. Todesco, D. Tommasini, A. Verweij,
Physics 12 Mr. Jean November 13 th, The plan: Video clip of the day Drawing circuits Working with circuit diagrams Basic Ohm’s Law.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Main dipole circuit simulations Behavior and performance analysis PSpice models Simulation results Comparison with QPS data Ongoing activities Emmanuele.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Comparison of magnet designs from a circuit protection point of view Arjan Verweij, CERN, TE-MPE with input from M. Prioli, R. Schmidt, and A. Siemko A.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
R. Ostojic, IRP1 CD Review, 31 July 2008 LHC IR Upgrade Phase I Goals and Constraints 1.Upgrade goals and milestones 2.Upgrade of IR systems: main constraints.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Considerations from machine protection and the ELQA teams
HL-LHC IT STRING and Series test of SC link
D1 and D2 powering and protection
Powering LHC magnets version 30/3/2007.
The HL-LHC Circuits: Global View and Open Questions
State of discussions in preparation for the HL-LHC Circuits Review
Superconducting Circuits, a generic view
Power converters and circuits
Circuits description and requirements
Circuit-protection aspects of different preliminary magnet-design options
Powering the LHC Magnets
Concepts for magnet circuit powering and protection M
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Comparison of magnet designs from a circuit-protection point-of-view
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
Status of studies on FCC magnet circuit architecture and protection
Detailed global view on protection and detection of the circuits
3 issues identified in review
+ many slides from various colleagues (KH, Rudiger, Paul, …)
WP3 Meeting – December the 10th 2015 H. Prin
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Hilumi WP3 meeting, 1 October 2014
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
What electrical component opposes the flow of current in a DC circuit?
Review Bloc 4 and SM18 facilities and upgrade
F.Pasdeloup, H.Prin, L. Williams
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

David Nisbet – LIUWG 17 th July 2008 LIUWG – Options for Powering Phase I David Nisbet Summary of points from LIUWG 7 Existing topology Future topology ideas Overview of possible topologies Summary of options Discussion…

David Nisbet – LIUWG 17 th July 2008 Existing Triplet Q3Q2bQ2aQ1 i1 i2 i3 ifwd3 Inductive coupling Complex

David Nisbet – LIUWG 17 th July a 3 2b MQXC I Q2 = = kA I Q3 = 12.3 kA I Q1 = 12.3 kA 13kA V cv1 - Cost - Easy to control - Volume but - No flexibility (IQ1=IQ2a=IQ2b=IQ3) - Quench protection - String test LIUWG7 – Proposal1

David Nisbet – LIUWG 17 th July kA V cv2b 1 2a 3 2b MQXC I Q2 = = kA I Q3 = 12.3 kA I Q1 = 12.3 kA 13kA V cv1 13kA V cv3 13kA V cv2a - Full flexibility (easy to control ) - Easy for quench protection (no heater, no extraction) - no string test but -Cost ( f[voltage] => distance from DFB) - volume LIUWG7 – Proposal2

David Nisbet – LIUWG 17 th July a 3 2b 13kA V cv1 V cv2 MQXC I F = = kA I Q3 = 12.3 kA I Q1 = 12.3 kA - Easy to control - Two identical strings but -IQ1 = IQ3 and IQ2a = IQ2b (Possible to add trims on Q1 or Q3? How many % ?) LIUWG7 – Proposal3

David Nisbet – LIUWG 17 th July 2008 Phase I Triplet – LIUWG7 Proposals Several options for powering Optimum choice is a compromise of – Ease of protection – Electrical complexity – Volume – Cost LIUWG7 – Baseline retained was for a single 13kA source with 3x 600A correctors The following slides expand on all the possible options

David Nisbet – LIUWG 17 th July 2008 Magnet and Cryostat Layout? Cold Link to UJ Separate Link for D1? Lead configuration indicative only

David Nisbet – LIUWG 17 th July 2008 Option1 – Individual Powering

David Nisbet – LIUWG 17 th July 2008 Option1 – Individual Powering No bypass diodes No EE Switch / resistor No 4Q trim PCs No coupling Simple… Current Decay Time (I=0A) – R= 300uOhm, L = 52mH, t = ~14 min – Note: ramp down of RB/RQF/RQD = 30min… Control of negative ramp rate – 1Q converters – Particularly limited at low current Volume – Existing Triplet: 10 Racks, 18.6kA installed – Phase 1: 24 Racks, 56kA installed Current Leads: 5x 12kA continuous

David Nisbet – LIUWG 17 th July 2008 Option2 – Main Feed with 1Q Trims

David Nisbet – LIUWG 17 th July 2008 Option2 – Main Feed with 1Q Trims 1x bypass diode No EE Switch / resistor No 4Q trim PCs Volume – Existing Triplet: 10 Racks, 18.6kA installed – Phase 1: 8 Racks, 18kA installed Current Leads: 5x – 2x 12kA continuous – 3x 12kA peak; 2kA continuous Current Decay Time (I=0A) – R= 300uOhm, L = 208mH, t = ~57 min – Note: ramp down of RB/RQF/RQD = 30min… Control of negative ramp rate – 1Q converters – Particularly limited at low current Inductive coupling of 4 systems

David Nisbet – LIUWG 17 th July 2008 Option3 – Main Feed with 1Q Trims and EE

David Nisbet – LIUWG 17 th July 2008 Option3 – Main Feed with 1Q Trims and EE No 4Q trim PCs Volume – Existing Triplet: 10 Racks, 18.6kA installed – Phase 1: 8 Racks, 18kA installed Current Decay Time 4x bypass diode – Leakage current? Precision? Proximity to current leads? Current Leads: 5x – 2x 12kA continuous – 3x 12kA peak; 2kA continuous Control of negative ramp rate – 1Q converters – Particularly limited at low current Inductive coupling of 4 systems

David Nisbet – LIUWG 17 th July 2008 Option4 – Main Feed with 4Q Trims and EE

David Nisbet – LIUWG 17 th July 2008 Option4 – Main Feed with 4Q Trims and EE Volume – Existing Triplet: 10 Racks, 18.6kA installed – Phase 1: 7.5 Racks, 15.8kA installed Current Decay Time Control of negative ramp rate – 4Q converters (but only for trim) 4Q trim PCs – Active bypass protection 4x bypass diode – Leakage current? Precision? Proximity to current leads? Current Leads: 5x – 2x 12kA continuous – 3x 12kA peak; 600A continuous Protection more complex – requires detailed study Inductive coupling of 4 systems

David Nisbet – LIUWG 17 th July 2008 Option5 – Split Powering1

David Nisbet – LIUWG 17 th July 2008 Option5 – Split Powering1 1Q trim PCs Volume – Existing Triplet: 10 Racks, 18.6kA installed – Phase 1 : 14 Racks, 18kA installed – Potential for N+1 trims and 22kA installed in same volume 4x bypass diode – Leakage current? Precision? Proximity to current leads? Protection straightforward Inductive coupling of 2 systems Current Leads: 6x – 4x 12kA continuous – 2x 12kA peak; 2kA continuous Control of negative ramp rate – 1Q converters – Particularly limited at low current Current Decay Time – R= 300uOhm, L = 108mH, t = ~30min – Note: ramp down of RB/RQF/RQD = 30min…

David Nisbet – LIUWG 17 th July 2008 Option6 – Split Powering2

David Nisbet – LIUWG 17 th July 2008 Option6 – Split Powering2 Current Decay Time 1Q trim PCs Volume – Existing Triplet: 10 Racks, 18.6kA installed – Phase 1 : 14 Racks, 18kA installed – Potential for N+1 trims and 22kA installed in same volume 4x bypass diode – Leakage current? Precision? Proximity to current leads? Protection straightforward Inductive coupling of 2 systems Current Leads: 6x – 4x 12kA continuous – 2x 12kA peak; 2kA continuous Layout of DFB for protection and leads Control of negative ramp rate – 1Q converters – Particularly limited at low current Current Decay Time – R= 300uOhm, L = 108mH, t = ~30min – Note: ramp down of RB/RQF/RQD = 30min… Internal connection from Q1 to Q3

David Nisbet – LIUWG 17 th July 2008 Option7 – Split Powering1 with EE

David Nisbet – LIUWG 17 th July 2008 Option7 – Split Powering1 with EE Current Decay Time 1Q trim PCs Volume – Existing Triplet: 10 Racks, 18.6kA installed – Phase 1 : 14 Racks, 18kA installed – Potential for N+1 trims and 22kA installed in same volume 4x bypass diode – Leakage current? Precision? Proximity to current leads? Protection straightforward Coupling – Inductive coupling of 2 systems – Resistive coupling of 2 systems through switch resistance Current Leads: 6x – 4x 12kA continuous – 2x 12kA peak; 2kA continuous Two 12kA EE systems required – but at half energy of single system Control of negative ramp rate – 1Q converters – Particularly limited at low current

David Nisbet – LIUWG 17 th July 2008 D1 and Corrector Powering Volume – Existing Correctors: 6 Racks, 5.04kA installed – Phase 1 Correctors + D1 : 8 Racks, 12.64kA installed Existing LHC designs can be used – Existing correctors: 8x [±600A, ±10V] – Phase 1 Correctors: 4x [±600A, ±10V] – Hopefully re-use existing 4Q 600A correctors

David Nisbet – LIUWG 17 th July 2008 Summary Table OptionDescription 1 PO*** Individual Powering – 4x 12kA 1Q Individual PCs – 24 Racks, 5x 12kA current leads 2Main feed with 1Q Trims – {1 x 10kA, 3 x 2kA} PCs – 8 Racks, {2x 12kA + 3x 12kA peak} current leads – Inductive coupling 3Main feed with 1Q Trims and EE – {1 x 10kA, 3 x 2kA} PCs, 1x 12kA 208mH EE, Warm bypass diodes – 8 Racks, {2x 12kA + 3x 12kA peak} current leads – Inductive coupling 4Main feed with 4Q Trims and EE – {1 x 12kA, 3 x ±600A} PCs, 1x 12kA 208mH EE, Warm bypass thyristors – 7.5 Racks, {2x 12kA + 3x 12kA peak} current leads – Inductive coupling, complex protection

David Nisbet – LIUWG 17 th July 2008 Summary Table (contd) OptionDescription 5 PO** Split Powering1 – {2 x 12kA, 2 x 2kA} PCs, Warm bypass diodes – 14 Racks, [4x 12kA + 2x 12kA peak} current leads – Inductive coupling 6Split Powering2 – {2 x 12kA, 2 x 2kA} PCs, Warm bypass diodes – 14 Racks, [4x 12kA + 2x 12kA peak} current leads – Inductive coupling, internal wiring from Q1 to Q3 7Split Powering1 with EE – {2 x 12kA, 2 x 2kA} PCs, 1 x 12kA 104mH EE, Warm bypass diodes – 14 Racks, [4x 12kA + 2x 12kA peak} current leads – Inductive and resistive coupling

David Nisbet – LIUWG 17 th July 2008 Conclusion Powering Preferences Individual Powering is preferred choice (Option 1) – Can powering be made from the surface (long cold link)? – Perhaps volume and cost constraints – No issues with radiation and access; installation in advance… Second choice is for Split Powering1 Is an Energy Extraction system really necessary, or can we rely on Heaters?