1 I n t e g r i t y - S e r v i c e - E x c e l l e n c e AFMC Sustainment Transformation Mr. Edward C. Koenig, III Mr. Tom Wells Mr. Edward C. Koenig,

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Department of Defense Supply Chain Material Management Regulation DOD R 23 May 2003 Office of the Deputy Undersecretary of Defense for Logistics.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
MIS ENTERPRISE SYSTEMS In Tech We trust Dell in Action What is SCM
This Briefing is: UNCLASSIFIED Headquarters Air Combat Command David Glowacki, Col, USAF Chief, Contracting Division HQ Air Combat Command Installation.
DoD Logistics Balanced Scorecard Overview
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
2 Mr. Pat Rhode, Chief, Procurement Transformation Division, US Air Force Date: August 5, 2008 Time: 10:45 – 11:45 AF Strategic Sourcing Initiatives.
BENEFITS OF SUCCESSFUL IT MODERNIZATION
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Air Force Partnering with Industry May 2004 Developing, Fielding, and Sustaining America’s Aerospace Force Air Force Materiel Command.
Strategic Supplier Alliances Strategic Materiel Sourcing Paul E. Botts, Col, USAF Mr. Stephen Rodocker, GS-15 DSCC-Procurement Group August 2003.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
Program Management Overview (An Introduction)
1 Chapter 3 Organizing The Purchasing Function IDIS 424 Spring 2004.
A Framework for Marketing Management
The Acquisition Gateway
ENTERPRISE SYSTEMS CHAPTER 11 Hossein BIDGOLI MIS In Tech We trust What is SCM Dell in Action Saleforce.com CRM What is ERP? Apple first day.
Relationship Marketing
Core Performance Measures FY 2015
Trade Management Sourcing & Optimising Strategies Module 8.
MARKETING STRATEGY O.C. FERRELL • MICHAEL D. HARTLINE
Supplier Selection & Evaluation
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Core Performance Measures FY 2005
Managing Procurement and Sourcing Getting What You Need.
Supply Chain Management Common Learning Block I Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the.
Maximizing Return On Assets BackgroundBackground The Client is a global provider of equipment for home and commercial applications. Facing both a shrinking.
Foundations of information systems
Carl Holmes Christy Lee Vendor Information SAP is headquarters is in Walldorf, Germany. Largest computer software company in the world. 47,804 employees.
1 Pipeline Measurement Process Review Committee Kickoff Session Paul Blackwell Office of the Deputy Assistant Secretary of Defense for Supply Chain Integration.
1102 Contract Specialist as a Business Manager Debbie Bartlett Defense Acquisition University.
Procurement’s Impact on Logistics Business Marketing 880 Spring 1999 Bernard J. LaLonde Steven Robeano.
Logistics and supply chain strategy planning
Sourcing Decisions.
Oriflame Purchasing Management Workshop Module 4 – Project Team Development Oriflame Vision & Strategy Supplier Interfaces The Business Model Supply Vision.
DOE/CSCC/ICPT/SCMC/PERT Joint Meeting Overview Agenda Discussion and Group Introductions February 7-8, 2012 Office of Management Office of Procurement.
Your Financial Work Defense Finance and Accounting Service DFAS Transformation Update March 2003.
1 Air Force Materiel Command Brig Gen Erv Lessel Deputy Director Plans and Programs HQ AFMC 3 Mar 04.
Kathleen Donahue Damodar Rao Gummadapu Aspiring High. Above and Beyond, Our Journey to “Be the Best” Business Process Intelligence.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Performance Based Logistics
Supply Chain Doctors SCM Fundamentals Introduction Planning Sourcing Making Warehousing Transporting Sharpening the Saw.
CHAPTER 4: Procurement.
CHAPTER 2 Supply Chain Management. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 2-2 Supply Chain Management.
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Strategic Management of Suppliers: Maintaining Efficient Manufacturing Operations.
Team Development Slide 1 © The Delos Partnership 2005 Supplier Relationship Management Module 4 – Project Team Development Vision & Strategy Supplier Interfaces.
Chapter 20 Strategy in Purchasing and Supply Management.
1 NCMA HOT TOPICS Performance Based Logistics NCMA HOT TOPICS Performance Based Logistics Air Force Materiel Command Major Jim Valley HQ AFMC/A4KC 27 Jan.
Chapter 2 Operations Strategy Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Strategy Formulation 1. Define primary task 2. Assess.
2 Developing Marketing Strategies and Plans
Supply Chain Management Purchasing/Inventory/Materials.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
Joani Scott. What to Expect Introduction Group Discussion SRM to Obtaining Superior Value Wrap Up / ?’s / Evaluation.
Main Function of SCM (Part I)
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
Leading DLA's Aviation Supply & Demand Chain Defense Supply Center Richmond Base Realignment And Closure (BRAC) Depot Level Reparable (DLR) Update Ms.
Connecting Prognostics to the Supply Chain Greg H. Parlier, PhD, PE Presented by Tom McLaughlin Valu-Lytics, Inc November 3, 2015.
Supply Chain Management
MAXIMISING VALUE FOR MONEY SUBJECT TO COST CONTAINMENT
UNIT –V SUPPLY CHAIN MANAGEMENT
BU Commercial Director
PURCHASING AND SUPPLY MANAGEMENT
Procurement’s Impact on Logistics.
GEOP 4355 Supply Networks: Supplier management
Tire Industry Symposium
Defense Logistics: Integrated and Efficient
Presentation transcript:

1 I n t e g r i t y - S e r v i c e - E x c e l l e n c e AFMC Sustainment Transformation Mr. Edward C. Koenig, III Mr. Tom Wells Mr. Edward C. Koenig, III Deputy Director for Supply Directorate of Logistics and Sustainment and Mr. Tom Wells Director, HQ AFMC Contracting

2 Logistics Transformation Air Expeditionary Force Agile Combat Support Maintenance/Sustainment 100% on time delivery  flowdays 25%  costs 10% Zero defects 50%  in sourcing cycle time 20%  in supply material availability 20%  in material purchase and repair costs Adaptive & Responsive Radical change Integrated Adaptive & Responsive Radical change Integrated Rapid Deployment Sustainability Rapid Deployment Sustainability “…We view transformation as one of our principle missions…from headquarters down to depots and our acquisition of major systems and the conduct of operations.” AF Secretary Roche 20%  in aircraft availability 10%  in O&S cost

3 Sustainment Performance Total AF MICAP HoursSMAG & DMAG NOR Total AF Aircraft On-Time DeliveryTotal AF Aircraft Availability War-winning capabilities…On Time, On Cost

4 Net Sales $5.76 Billion 1.7M Items Delivered $1.37B 760K Items Delivered $3.2B 25 ALC Supply Chain Management Organizations Organic & Contract Depots DEPOT AFMC Supply Business Area (FY03) AIR FORCE TRANSCOM FMS $3.3B Repair Orders $1.4B Buy Orders 157,000 Line Items Manufacturers Source: FY03 sales data came from Keystone. ARMY/NAVY AF Supply System

5 Organic & Contract Depots PSCM Value Proposition Manufacturers Source: FY03 sales data came from Keystone. Streamlined Order Agreements Strategic Partnerships Jointly Forecasted Production & Deliveries Jointly Forecasted Requirements Lower Unit Prices Fewer Contracts Optimized Supply Base Eliminate NVA Transactions & Cycle Time Optimize Inventory Levels Lower Supply Chain Cost Demand Reduction Lower Inventory Levels AF Supply System

6 Commodity Schema Development Steps Collaborative Approach Conducted enterprise spend analysis for MSD and Support Equipment Sep 03 Oct 03 ESG Approval of FSC Based Grouping Nov 03 Benchmarking to validate Schema Nov 03 Dec 04 Reworked Groupings With ALCs Final ESG review Nov 03 ESG Approval of Selection Criteria Jan 04 ESG Commodity Schema Approval 5 Feb 04 Alternatives for grouping MSD and Support Equipment items ESG Review of Proposed Commodity Groups Feb 04

7 # Contract Actions # Contracts Stock #s # of CAGEs TOTALS3349 Lead ALC Oklahoma City Warner-Robins Oklahoma City Ogden Warner-Robins Commodity Group Aircraft Accessories Aircraft Engines Aircraft Structural Communications Electronics Instruments Landing Gear Secondary Power Systems Support Equipment Commodity Councils Lead ALC OC W-R OC OO W-R

8 Commodity Council Roles Commodity Expert Engineering and technical expert TDA + Engineer Commodity Standardization Commodity Council Director Executes CC Mgt Formulates Accountable for CAMP Accountable for Goals Commodity Council Deputy Director Manages council Coordinates the matrix support team Responsible for assembling the CAMP Goals and Stds POC Commodity Sub-Council Manager Manages commodity sub-group Formulates strategies for sub-group Sourcing Supply Analyst Conducts spend and strategy analysis Develops/manages Supplier Scorecards Procurement Manager Develops contract and sourcing strategy Executes contract Data Specialist Performs data analysis Ensures quality and availability of data Business Requirements Analyst Customer Relations POC Interpret customer needs Market Intelligence Analyst Research, analyze and interpret market research Builds knowledge repository Commodity Supply Chain Analyst Commodity SC Strategic Planning Continuous Process Improvement POC Materiel Governance Board Co-Chairs : AFMC/PK & LG ALC/PKs and CSW Director Governance Policy Set overall CC objectives and goals Approve CC strategies, plans and measurements Evaluate on-going CC performance

9 Commodity Councils Launched MGB reviewed initial CAMPs: LG Sole Source – approved LG Competitive – approved with comments SE Honeywell – approved with comments SE Oscilloscopes – approved MGB reviewed initial CAMPs: LG Sole Source – approved LG Competitive – approved with comments SE Honeywell – approved with comments SE Oscilloscopes – approved Completed Commodity Council Position Descriptions & Core Docs Completed Commodity Council Position Descriptions & Core Docs Accomplishments: Wave 1 Stand-up - Aircraft Accessories, Landing Gear, Support Equipment Wave 2 Stand-up - Instruments, Power Systems, Electronics/Communications Material Governance Board stood up - Initial commodity strategies validated Commodity council implementation & support strategy developed Contracts In Place Wave 1 Wave 2 Wave 3A (Engines) Strategies Defined Contracts in Place Strategy DevelopmentContracts In Place / Monitor LaunchStrategy DevelopmentContracts In Place Strategy Development Launch Future Launch Council Launched Wave 3B (Aircraft Structures) Strategy DevelopmentLaunch

10 Strategy Development

11 Commodity Council Eight-Step Process How will our strategies be different? Short answer: Depends on analysis 8 Step process a framework Notional Examples Strategy Development and Execution

12 Strategy Optimization (Notional) Current Environment –Large Supply Base 2000 Vendors/ 7,200 Items 75% of vendors supply three or fewer items –No long-term agreements Current Market Assessment –Competitive Market –Many vendors –Small Business Opportunities Future Strategy –Competitive long-term contracts –Consolidate sourcing for similar items –Increase small business spend –Incentives to reduce lead-time Supply Base Current Environment – 150+ configurations – Individual orders –Three primary suppliers, but few Long-term contracts –Steady forecasted demand –Related requirements purchased separately Market Assessment –Commercial product –Requirements satisfied by three configurations Future Strategy –Utilize three configurations for standardization –Long-term contracts w/competitively selected suppliers Configuration

13 Demand Reduction (Notional) Current Environment –150 items, contract repair spend totaling $25M - $30M forecasted –Mean-time between failures (MTBF) is decreasing –No root cause for the trend identified –Customers demanding better reliability Current Market Assessment –Limited Sources, many sole source –Many items repaired by OEM Future Strategy –Cooperative effort between suppliers and customers to determine root causes –Pursue Long-term performance-based agreements to incentivize MTBF improvement Execute/Monitor Strategy

14 Consolidated Contract Strategy (Notional) Current Environment –OEM has 30 selling units under corporate umbrella –Provides 1200 stock numbers across 8 commodity groups –600 contracts and $600M in total spend with AFMC –Known source for 500 forecasted stock numbers, $200M spend –Averaging 130 days ALT and 250 days PLT Current Market Assessment –Supplier interested in corporate-level contracts –Supplier aligned in four principle market segments Future Strategy –Align contracts with commodity and market requirements –Consolidate requirements to fewer long-term strategic contracts Execute/Monitor Strategy –Collaborative forecasting and incentives to reduce lead time

15 Expected Outcomes Benefits to the Warfighter –More responsive to mission demands –Lower cost products –On time deliveries –Fewer items in depots, more at the field units –High quality products Benefits to the Air Force –Easier to execute purchasing arrangements –Reduced cycle times –Less transaction “thrash” –Lower Unit Prices –Accountable to AF Corporate Structure Benefits to Suppliers –More predictable, longer-term business –Strategic, focused relationship with AFMC –Fewer, higher-value contracts –Lower overhead costs