M1M3 Status & Near Future Milestones C.Araujo/ J. Sebag 1.

Slides:



Advertisements
Similar presentations
James Webb Space Telescope Optical Telescope Element (OTE) Mirror Coatings Ritva. A. Keski-Kuha, Charles W. Bowers, Manuel A. Quijada NASA/Goddard Space.
Advertisements

Millenium Telescope. Initial Meeting.. Format Part 1 - Planning Part 2 - Sample Designs Part 3 - Discussion/what happens next.
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
A Stress Analysis of Sputter Coating on the LSST Primary-Tertiary Mirror Substrate temperature and strain during sputter deposition of aluminum on cast.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master The Dome Project Bill Gressler Telescope.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guideline for Design, Installation,
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Monday Morning J. Sebag T&S Systems Engineer. Close Past… 2 M1M3 acceptance and transportation to storage Reviews and RFPs (Dome, Software, Coating Plant,
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
SLS Optics Limited Manufacturer of Quality Optical Components ISO 9001:2000.
Sandrine Thomas (T&S Project Scientist) & Telescope and Site Team.
Start Counter Construction Update Eric Pooser 08/21/2014.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Telescope Integration and Tests Tuesday Afternoon.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
TRENTON Casing Filler Presentation
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Your Trade Show Display Solution!. ◦ Plan-O-Grams ◦ Products ◦ Assortments ◦ Trade Shows ◦ Presentations ◦ Sales Opportunities.
Magellan F/5 secondary updates. Magellan F/5 secondary  Mirror polishing finished late 2007  Final figure “better than MMT”
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
1 Shield and Fold Mirror Dimensions Michael Sholl 3 February 2005 MODIFIED by Robin Lafever 23 Feb 2005.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
CLAS12 Drift Chamber Prototyping
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
IAEA Sources of Radiation Nuclear Fuel Cycle – Fuel Fabrication Day 4 – Lecture 7 1.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status 01_09_2010 machine alignment check by laser level control device machine set up after.
Report to the SSC Jan 10, Report to the SSC-Jan 10/02Page 2 Key Dates Nov 13-14/01Preship Review Jan 4/02Final review before disassembly Jan 7Start.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
F/5 telescope work Secondary mirror polishing (SOML) Secondary mount support controls Active optics controls Flat field screen & lamps Telescope baffles.
LCGT Meeting Laser & Mirror 12 December, Laser Ordered fiber amplifiers made by Nufern will be shipped on 16 th December. After the amplifiers arrive.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Lessons from CLIO Masatake Ohashi (ICRR, The University of TOKYO) and CLIO collaborators GWADW2012 Hawaii 2012/5/16.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The reading is 7.38 mm. The reading is 7.72 mm.
Av-Tech Industries- Quality, Service and Precision Kitting
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
1 Mulch Lane Bridgeton Mo
Light Bulb Changing Procedure
Bill Raynor Naval Research Lab
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Spectrometer Solenoid Fabrication Status and Schedule
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
TRENTON Casing Filler Presentation
Coating Failure at a Gas Compressor Facility
The Richard F. Caris Mirror Lab
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Camera timeline planning
Presentation transcript:

M1M3 Status & Near Future Milestones C.Araujo/ J. Sebag 1

2 Acceptance test Acceptance Test Plan Final Report

3 M1M3 Protected coating

4 Mirror Transport May 20 

5 M1M3 Mirror Storage in Tucson Plan to visit/inspect mirror every months May July Arrival at Storage Facility Final Placement of the mirror container Last Inspection at Storage Facility

6 Near Future Activities / Milestones…

M1M3 Status 7 Plan to visit every 1.5 – 2 months Transport Box SOML Hard points & support fixtures attached to mirror Acceptance SOML Transport to Storage Million Air Cell Assembly Integration Visit/Inspection Preparation Final Test at Mirror Lab Mirror at storage place

Preparation for M1M3 Interferometric Test 8 Before Shipping of the M1M3 mirror to Chile, the M1M3 mirror cell assembly (mirror+cell+mirror support system) will be tested in 2017 at Richard F. Caris Mirror Lab (ex. SOML) with the same interferometric testing configuration used during mirror polishing. Mirror Lab Test Tower Configuration M1M3 mirror Interferometers M1M3 Cell M1M3 cell M1M3 Mirror Support System M1M3 mirror

9 M1M3 Baffle M1M3 boundary 50 mm wide 5 m diameter Material samples Acktar Protostar Genesee Scientific Protectokote Requirements Stray light control Removable (?) Washable (?) Tests on borosilicate samples How to install it

10