High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
PAL/POSTECH 제 2 회 한국 국제선형충돌가속기 워크숍 Waveguide System for Linear Collider Woon-Ha Hwang Linac Division Pohang Accelerator Laboratory 2005,12,28.
Superconducting Spoke Resonator Cavities and Cryomodules
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
ILC Marx Modulator Development Program G.E. Leyh, Stanford Linear Accelerator Center.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
European Spallation Source RF Systems Dave McGinnis RF Group Leader ESS Accelerator Division SLHiPP-1 Meeting 9-December-2011.
RF Power R&D David Wildman May10, 2005 Slides “borrowed” from: G. W. Foster, A. Moretti, D. Sun, I. Terechkine, D.Wildman,& D. Wolff.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
An Assessment on Klystron Modulator Topologies for the ESS Project Carlos A. Martins (*), Karin Rathsman(**) (*) – Laval University, Dept. Electrical and.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
1 LCWS10 in Beijing DRFS Development (S. Fukuda) 27/03/2010 DRFS Development KEK S. Fukuda Introduction : DRFS R&D Plan Talks concerning with DRFS in LCWS10.
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Klystron Modulator for Proton Driver
ANL-FNAL Collaboration on High Intensity Neutrino Source Activities G. Apollinari Introduction Collaboration Activities ‘05-’07 Achievements ’07-’10 Plans.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Status of KEK STF-HLRF S. Fukuda KEK. October 1 HLRF KOM S.Fukuda 2 Stuffs of HLRF&LLRF(RF group in KEK Linac team) Leader S. Fukuda Modulator M. Akemoto,
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Power Supply System for DRFS
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
Alexander Aleksandrov Oak Ridge National Laboratory
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Development of The Klystrons for J-PARC Project
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Jan 12, 2005G.W.Foster - Proton Driver General Meeting Proton Driver General Meeting Kick-off Presentation G. W. Foster PD General Weekly Meeting Jan 12,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
Current Proton Driver Activities in the Accelerator Division Accelerator Physics and Technology Seminar Bob Webber February 2, 2006.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
650 MHz Solid State RF Power development at RRCAT
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
ESS Linac Upgrade Dave McGinnis Chief Engineer / Accelerator Division May 27, 2014.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Areal RF Station A. Vardanyan
RF cell Anders Sunesson RF group leader
Chris Adolphsen Sergei Nagaitsev
Klystron Power Supplies for ILC
CEPC RF Power Sources System
RF systems introduction
RF introduction Anders Sunesson RF group leader
Presentation transcript:

High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006

Fermilab 2 Outline Genera description of Fermilab High Intensity Neutrino Source (HINS) Linac Description of (HINS) linac R&D Study. Conclusions.

Fermilab MHz Klystron – Toshiba E3740 FERMI 115kV Pulse Transformer Modulator Capacitor / Switch / Bouncer Charging Supply RFQ MEBT RF Distribution Waveguide with Dir Couplers Ferrite Tuners Single Klystron Feeds RT and SCRF Linac to E > 90 MeV HINS 325 MHz Front END

Fermilab 4 M 325 MHz RF System Pulse Transformer & Oil Tank IGBT Switch & Bouncer CAP BANK 10 kV 110 kV Charging Supply 300kW MODULATOR: FNAL/TTF Reconfigurable for 1,2 or 3 msec beam pulse Single Fermi Klystron 325MHz 2.5 MW WR2300 Distribution Waveguide TOSHIBA E3740A IQMIQM E IQMIQM B IQMIQM T IQMIQM R F Q IQMIQM Cables to Tunnel Fast Ferrite Isolated I/Q Modulators RF Couplers S IQMIQM S IQMIQM R IQMIQM S IQMIQM S IQMIQM R IQMIQM 400kW 20 kW D IQMIQM S IQMIQM R IQMIQM D IQMIQM S IQMIQM R IQMIQM 120 kW 10kV H- Medium Energy Beam Transport Copper Cavities Radio Frequency Quadrupole RT Copper Single-Spoke Resonators Cryomodule #2 Double-Spoke Resonators 20 kW There will be more power distribution splits than shown

Fermilab 5 Simplified Layout of the RF Fan-out for 8 GeV HINS Linac This is simplified Layout of the high power RF distribution system The 325 MHz high power line is as shown except it will have 3 power splitter for Powering 3 directional coupler Arms and the RFQ. The 1300 MHz high power line because the base line klystron has two 5 MW power o utput Lines will have two 5 MW branches with several power splitters in each powering directional coupler arms. Directional Couplers Ding Sun’s Talk

Fermilab 6 Key: Klystron--, Hybrid--, Load--, Cavity-- Penetrations Linac Tunnel Linac Gallery One 325 MHz Klystron Driving 58 Cavities and RFQ H HH RFQ Rm temp Super C Super C

Fermilab 7 Status of Required Components Vendor quotes have been received for the required hybrid power splitters. Vendor quotes have been received for the string of directional couplers required to provide RF power to the cavities. In-house studies of directional coupler strings using HFSS is underway.

Fermilab 8 Directional Coupling Factors along the 325 MHz section of the HINS Linac The chart shows that the Superconducting cavity coupling factors remain constant with changes in beam loading (Blue and Yellow curves). The red and black curves show the coupling factor change with beam loading with beam loading changes.

Fermilab 9 HINS 325 MHz Klystron Toshiba E3740AFermi 325 MHz 2.5 MW Specification s: Beam V= 98 kV Beam I= 51 A Perveance=1.75uP Gain= 47 dB Efficiency=50 % Modulating Anode grounded to make a diode tube.

Fermilab MHz kltsron in Meson Building on its wheels.

Fermilab MHz Components Circulator Modern Photo-multiplier for Arc detection Miscellaneous required RF Components: Bends, Couplers, Bellows, straight pieces,etc.

Fermilab 12 LAYOUT OF Test and HINS Area LL RF Input Klystron Circulator Load Switch Waveguide components, bends, straights, couplers, etc., to Experimental test area Waveguide Components to HINS Area,

Fermilab 13 Bouncer Modulator Circuit

Fermilab 14 Bouncer Modulator Waveforms Switch connects main capacitor bank to transformer during pulse. Transformer steps up voltage to 120kV/130A (12:1) Main capacitor bank discharges by 20% during pulse “Bouncer” circuit compensates for cap bank droop. Main Capacitor and Bouncer Capacitor Voltage Klystron Voltage and Expanded Klystron Voltage

Fermilab 15 Pulse Transformer 4 ms Pulse Length for HINS

Fermilab 16 System Control Forward/Reflected Power Photo Detector Video Pulse Klystron Protection Interlock Boards

Fermilab 17 HINS and SMFT Interlocks

Fermilab 18 Conclusions All of the components for the 325 MHz klystron output RF power testing are on-hand. First RF power testing of 325 MHz klystron is scheduled for July of this year. Major Components of the modulator are on hand and testing of major assemblies is underway. Design of the of the equipment and safety interlocks has been completed. Construction and assembly and testing of the boards are underway. Conceptual design of the low level RF system has started in collaboration with LBL. Adaptations of In-house, Desy and SNS prototype control boards are under study.