NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.

Slides:



Advertisements
Similar presentations
GIS Executive Council and Advisory Committee Update November 2010.
Advertisements

1 Measuring ICT4D: ITUs Focus on Household and Individual Market, Economics & Finance Unit Telecommunication Development Bureau.
LONE STAR TECHNOLOGIES, INC. Investor Presentation 2004.
... M A K E S Y O U R N E T W O R K S M A R T E R Welcome to Axis´ Annual General Meeting 2003.
North American Portability Management LLC 1 NAPM LLC MEMBERSHIP INTRODUCTION.
1 FIRST QUARTER 2009 INVESTOR CONFERENCE CALL. 2 Today ’ s Hosts Steve Romano Chairman & Chief Executive Officer Jim Baumgardner President & Chief Operating.
EHMA bofcon Bo Frank Consulting June 2005 European requirements and practice in heat metering by Bo Frank EHMA.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
The Old Rules Just Don’t Fit Anymore: A Panel Discussion on the Proposed Revision of the Telecommunications Act of 1996 John Windhausen, Jr., Past President,
Aviel Tenenbaum Executive Vice President, GS&M ECI Telecom in Brazil Brazil: Technological Innovation & investment Opportunities December 15, 2008 Tel.
METHODOLOGY FOR THE REVIEW/EVALUATION OF POLICY DOCUMENTS By Kwami DADJI, Health Officer HIV/AIDS, TB, Malaria & OID African Union Commission.
1 VimpelCom – September 2004 Company Presentation VIMPELCOM September 2004 Brunswick UBS Annual Conference.
Aker Exploration: Rig for oil Status and Outlook Bård Johansen, President & CEO.
1 Thomas S. Weber Vice President - Financial Strategy RBC Capital Markets North American Technology Conference August 3, 2005.
ProCognis SOX 404 & COSO Implementation Presentation
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
Mid-America Regulatory Conference June 9, 2003 Kenneth Moran FCC-OET Director Defense and Security TSP WPS GETS.
The 22 nd meeting of the INTOSAI Working Group on IT Audit (WGITA) KPI Project Final Report — Key Performance Indicators Methodology for Auditing IT Programs.
NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Book 2.final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.
Washington State Low Income Weatherization Program Evaluation Calendar Year 2011 DRAFT Results Prepared by: Rick Kunkle July 2013.
Measuring and Enhancing Services Trade Data and Information Conference September 14, 2010 U.S. Department of Commerce, Washington, DC Service Statistics.
Qatar Planning Council 1 Best Statistical Information to Support Qatar’s Progress Statistical Capacity Building for Information Society in Qatar.
NRIC Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Final.v /AGR1 NRIC Focus Group One Subcommittee 1 Network Assessment.
This communication does not constitute an offer to sell or the solicitation of an offer to buy any securities or a solicitation of any vote or approval.
Presented to: Presented by: Transportation leadership you can trust. FTC Expressway Authority Cost Savings Study Florida Transportation Commission Expressway.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Forensic DNA Databases: A Global Update Presented by: Tim Schellberg, President GORDON THOMAS HONEYWELL Governmental Affairs Washington, DC (202)
1 Improving Federal Rights-of-Way Management to Spur Broadband Deployment Meredith Attwell Senior Advisor to the Assistant Secretary National Telecommunications.
Gas Market Dynamics – The Ups and Downs March 11, 2009.
VimpelCom Presentation of 3Q 2006 Financial and Operating Results November 30, 2006.
Web-centric BusinessNRIC V – February 27, 2001 NRIC V Council Meeting - February 27, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
U.S. Telecommunications Regulation and Market Developments September 2008.
Svyazinvest in 2002: restructuring continuing November 2002.
1 Report of the Controller and Auditor-General Civil Aviation Authority: Certification and Surveillance Functions CAA Progress Report To Select Committee.
Needham 11 th Annual Growth Conference January 6, 2009 NASDAQ: BBOX.
L Q Earnings Conference Call April 30, 2009.
Size Standards Analysis: SBA Methodology Presented to: The Council on Federal Procurement of Architectural & Engineering Services (COFPAES) By: Khem R.
U.S. Cellular 2005 Annual Meeting May 3, John E. Rooney President & Chief Executive Officer.
1 NRIC IV Focus Group 1 Readout Peter G. SpringApril 14, 1999 (Day 261)
April, Investor presentation.
Forensic DNA Databases: A Global Update Presented by: Tim Schellberg, President GORDON THOMAS HONEYWELL Governmental Affairs Washington, DC (202)
ITU Focus Group Digital Financial Services ITU Regional Standardization Forum for Americas (Washington D.C., United States, 21 September 2015) Vijay Mauree,
Electricity, Gas and Water Indexes June Electricity Statistics A survey on generation and distribution of electricity is carried out since 1990.
Wireless Telecommunications Bureau Wireless Telecommunications Overview January 2009.
MAKING THE FOREST SECTOR TRANSPARENT PROJECT (MFSTP) Forest Governance Scorecards in Ghana Presentation At The West Africa Forest Governance Forum 7 th.
Spatial Pattern of PM2.5 over the US PM2.5 FRM Network Analysis for the First Year: July 1999-June 2000 Prepared for EPA OAQPS Richard Scheffe by Rudolf.
North American Network Operations Group (NANOG) October 23, 2000 Washington, DC PJ Aduskevicz AT&T.
Global trends in telecom development Saburo TANAKA Councellor ITU/TSB The original document is elaborated by Dr Tim Kelly, ITU/SPU. It has completed by.
TELUS forward looking statements This session and answers to questions contains forward-looking statements that require assumptions about expected future.
14 April 1999 NRIC IV Agenda: 14 April 1999  Introductions  Opening comments  Frank Ianna -- President, AT&T Network Services  Michael Powell -- FCC.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Working Group 8 – E9-1-1 Best Practices September 23, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
Implementation Status Presented to: Berkeley Site Office Implementer : Minh Huebner January 4, 2007 Office of Management and Budget Circular A-123 (Appendix.
FUCHS PETROLUB / Q Conference Call Dr. Alexander Selent, Vice Chairman and CFO Reiner Schmidt, Member of the Group Management Committee Mannheim,
Working Group on the Value and Benefits Chair´s Report 7th Meeting of the Steering Committee of the INTOSAI Committee on the Knowledge Sharing and Knowledge.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
1 NIIF Summary Report Activities since the NIIF #35 meeting October 18, 2002 Stu Goldman – NIIF Moderator
NRIC IV Focus Group 1 Readout 1 P. S. Sahni Focus Group 1 Chair July 14, 1999 (Day 170)
Lead Agency Viability Assessment Consistent with OPPAGA Report 04-65, DCF contracted with FMHI to assist in the design and implementation of a centralized.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
Telephone and Data Systems, Inc. Annual Meeting of Shareholders May 23, 2002.
MSG Direction Needed for 2016 Timeline January 20 th 2016.
Intracom Telecom | Corporate Presentation Intracom S.A. Telecom Solutions | 19.7 km Markopoulou Ave., GR | t: | f:
© 2014 Utilities Telecom Council State of the Industry “WHY TELECOMMUNICATIONS TECHNOLOGY AND NETWORKS ARE CRITICAL TO THE UTILITY OF THE FUTURE: TECHNICAL,
Global Iron Oxide Consumption 2016 Market Research Report Published on – 31 March, 2016 | Number of pages : 177 Single User Price: $4000 The research methodology.
ICT Indicators Egypt Profile Eng. Hesham Baraka Director of Information Center (NTRA) Dr. Nagwa Elshnawy Director of Strategic Planning ( ITIDA ) Presented.
International Regulatory:
Standard Register First Quarter 2007 Conference Call April 27, 2007.
4th Stakeholder meeting 28 March 2006
Number Administration Oversight Working Group (NAOWG)
Presentation transcript:

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment Report #2 April 14 th, 1999 Federal Communications Commission Washington, D.C. Gerry Roth Vice President GTE Technology Programs This document and the information contained herein is intended, and for all purposes shall be deemed, a Year 2000 statement and a Year 2000 readiness disclosure as those terms are defined under United States federal law

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 2 Executive Summary United States Public Network Status –U.S. Telephone Service providers are on track to complete Year 2000 remediation programs Approximately 90% of the local, and 99% of the long distance switches in the U.S. Public Switched Network are deployed as of March 1999 Mid and small sized local companies trail the larger companies, but appear to be on track for 3rd and 4th quarter 1999 completion –Major carriers predict the Y2K completion and roll-out of all essential systems and products by June 1999 NRIC is estimating 98% by June to allow some margin of error No company is indicating technical difficulty with completion Range of responses is very narrowly distributed around the average International Risk Assessment –From all sources, the perceived risk of compliance has increased since our last report Approximately 75 % of countries sampled have increased risk 191 countries assessed, vs. 84 in December

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 3 Y2K Lifecycle Compliance Status Large Local Exchange Carriers (greater than 92% of U.S. Access Lines) Essential Systems Only

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 4 Y2K Network Compliance Status Large Local Exchange Carriers Essential Systems Only

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 5 Y2K Lifecycle Compliance Comparison Large, Midsize, and Small Local Exchange Carriers December 1998 Actuals Data Source: Large--NRIC Midsize--NRIC/USTA Small--NRIC/FCC Essential Systems Only

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 6 Y2K Network Compliance Comparison Large, Midsize, and Small Local Exchange Carriers December 1998 Actuals Data Source: Large--NRIC Midsize--NRIC/USTA Small--NRIC/FCC Essential Systems Only

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 7 Y2K Lifecycle Compliance Status Major Inter-Exchange Carriers (82% of U.S. Revenue) Essential Systems Only

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 8 Y2K Network Compliance Status Major Inter-Exchange Carriers Essential Systems Only

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 9 International Status

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 10 Change in Risk Perception - December to March Telecommunications Risk Assessment by Country Countries: 84

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 11 International Status by Region Comparison of Perceptions of Risk - December to March SubIndianMiddle EastEasternCentral & AsiaNorthWestern Sahara Sub & Europe South PacificAmerica Europe Africa Continent North Africa (inc. Russia) America(inc. Israel) High Risk 4th Q or Unknown Medium Risk 3rd Q Low Risk 2nd Q or Before The scores blend such that the following score ranges apply: =Low Risk; =Medium Risk; =High Risk; based on uncertainty High Risk Medium Risk Low Risk Countries: 84 Dec. /191 Mar.

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 12 High Medium Low Country Name (Millions of Annual Minutes) Major Interest > 200M Minutes Significant Interest Between 200M - 100M Minutes Level of Risk Countries of Major and Significant Interest to the U.S. (as determined by International Traffic Patterns, sorted by Perceived Risk) Total 1997 Traffic = 29,106 mMitt Countries: 53

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 13 Y2K Risk to U.S. International Traffic To and From Countries with greater than 100mMitt Total Traffic *mMitt: million of Minutes of Intercontinental Telecommunications Traffic mMitt Source: Telegeography, Inc. Countries: 53 Total 1997 Traffic = 29,106 mMitt

NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 14 Review of Year 2000 Recommendations from 14 January 1998 Report Increase Wireless participation from CTIA and FCC data collection –Covered in the FCC report, NRIC will not use in Network assessment Map Key Government Installations to coverage areas (in process) –Using NCS inquiry to USG –NARUC offices to obtain small company status Risk methodology added to plan completeness –Draft definition of “Done” - to be included in round 3 –Individual companies need to indicate results Assess impact with other sectors –Tri-industry group meetings have begun –Electric - Telecommunications - Oil & Gas NRIC working with International Y2K Telecom User Alliance, ITU, FCC, and State Department on international status assessments