Jim RuffAntennas & Feeds CDR 2/17/05 1 EVLA Feed Cone Current Status Feed Circle Layout Structural Design Feed Mounting Feed Heaters Cost.

Slides:



Advertisements
Similar presentations
H. Dinwiddie EVLA Feed CDR 2/17/05 1 Fabrication and Mass Production Plans for Laminated Feeds L-Band S-Band.
Advertisements

Battery PDB Controller GPS Data Recorder Antenna Cam Lower Stage Harness Upper portLower port Upper port Lower Stage Harness Sensors Cam Avionics Layout.
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Magellan – Venus1:48 scale Score all fold lines and cut out the parts. The actual Magellan spacecraft was virtually all white – some model parts are blacked.
CERAMIC FIBER RADIANT HEATERS Each panel is 1.5 ft. x 3.5 ft. in size covering about 5 ft 2 The panels can be arranged in any manner to achieve the heating.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Corvette Assembly Process Trim-Frame-Engine Dress NCRS National Convention July 20, 2011 John Hinckley.
Russ Rucinski, FNAL, Oct. 8, MICE Cryostat Status 1.Prototype cryostat A. Status & Plans B. Parts C. Operating data (supplemental) 2.Four final cryostats.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 >1 m 2 metallic mirror technology AIM find a suitable technology for large reflecting.
E. Szpindor, J. Ruff Advisory Committee Briefing June 10-11, Antennas and Feeds.
AuthorMeeting Title Date 1 EVLA Systems PDR Receivers/Feeds Daniel (Mert) MertelyEVLA System PDR:Receivers/Feeds 28 November, 2001.
9-2C Volume of Cylinders and Cones What is the difference in volume between cylinders and cones with the same area bases and same height? How do you find.
Louisiana Solar Energy Society PV BASICS. Louisiana Solar Energy Society Three Types of Solar: 1.Photovoltaic (PV and PVL) 2.Solar Thermal 3.Solar Pool.
R. HaywardEVLA Feeds CDR - System Requirements 17 Feb EVLA Feeds CDR System Requirements.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Paul HardenEVLA LO-IF CDR May 17, IF Subsystem Specs & Measured Test Data.
Jim RuffAntennas & Feeds PDR 2/12/02 1 Antennas & Feeds Mechanical Design Feed Cone Feed Mounting Horn Fabrication.
Design Progress Allen Ellis 18-September
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
EVLA Corr Racks/Cables etc. B. Carlson EVLA Correlator F2F Meeting Dec , 2007.
Dan MertelyEVLA Feeds CDR 17 February RFI Concerns Relating to EVLA Feeds Dan Mertely.
Hollis DinwiddieEVLA Front-End CDR – Feed Circle & Rx Mounting April 24, EVLA Front-End CDR Feed Circle & Receiver Mounting.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
What’s new about AMISR? First incoherent scatter radar built by NSF First U. S. incoherent scatter radar built for basic research First phased-array, solid-state.
R. HaywardEVLA Feeds CDR – Feed Radomes 17 Feb EVLA Feeds CDR Feed Radomes.
Q, Ka, K, Ku & X-Band Receivers
The Circle. Examples (1) – (5) Determine the center and radius of the circle having the given equation. Identify four points of the circle.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Front Structure Load and Weld Station
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
CETC54 contributions Neil Roddis Apr 15, SPDO In Shijiazhuang Covering the area of 2 sq.km. Founded in 1952 Over 5000 employees (543 senior engineers,
Date of download: 7/10/2016 Copyright © 2016 SPIE. All rights reserved. Orthogonal rotation of a regular tetrahedron with x-ray sources at its four vertices.
Date of download: 10/2/2017 Copyright © ASME. All rights reserved.
C-Band Feed Design and Prototype Tests
Scott Wakely University of Vengeance
nSW Alignment Installation
EVLA Front-End CDR – EVLA Front-End Schedule
Area of Shapes.
CTOF Installation.
HPL DG d=1.4mm/e= mm.
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
Eric building the fin mount.
Managing Human Resources and Labor Relations.
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
GLAST Large Area Telescope:
Charge to the Review Panel
RPC SYSTEM LAYOUT and DIMENSIONS
EVLA Racks Bins and Modules PDR
EVLA Advisory Committee Meeting System Status
Bacterial community dissimilarity, as measured by weighted UniFrac, a quantitative measurement (a), and unweighted UniFrac, a qualitative measurement (b),
X-, Ku-, S-Band Feed Design
Engine Mount Assembly Rockets.
Thing / Person:____________________ Dates:_________________
Similarities Differences
SmartFit™ Dual Monitor Arm
Advanced Two Chapter 8 Volume and Similar Solids
Presentation transcript:

Jim RuffAntennas & Feeds CDR 2/17/05 1 EVLA Feed Cone Current Status Feed Circle Layout Structural Design Feed Mounting Feed Heaters Cost

Jim RuffAntennas & Feeds CDR 2/17/05 2 Current Status Four built to date. –One mock-up. –Three installed. (Antennas 13, 14 & 16) Extrusions and Base Plates ordered for all. Panels Ordered for all.

Jim RuffAntennas & Feeds CDR 2/17/05 3 Antenna 13 Feed Cone

Jim RuffAntennas & Feeds CDR 2/17/05 4 Feed Circle

Jim RuffAntennas & Feeds CDR 2/17/05 5 Feed Circle ‘Rolled Out’

Jim RuffAntennas & Feeds CDR 2/17/05 6 Feed Cone Structure

Jim RuffAntennas & Feeds CDR 2/17/05 7 Feed Cone Being Installed in A13

Jim RuffAntennas & Feeds CDR 2/17/05 8 K-Band Feed Mount C, X, and Ku Similar

Jim RuffAntennas & Feeds CDR 2/17/05 9 Ka-Band Feed Mount Q-Band Similar

Jim RuffAntennas & Feeds CDR 2/17/05 10 A14 Feed Cone and A13 Feed Mounts

Jim RuffAntennas & Feeds CDR 2/17/05 11 Feed Heaters

Jim RuffAntennas & Feeds CDR 2/17/05 12 Feed Cone Cost Actual Production Feed Cone Costs. (Not included: Feed mounts, Feed Cone Floor, Skirt, ‘Combo Strips’, Feed Heaters, etc.) $5550 Laminated Panels $275 Extrusions $1050Base Plates $1125 Consumables $8000 Total Assembly & Installation labor ~ 4 man-months