MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team.

Slides:



Advertisements
Similar presentations
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Target Status Report Lara Howlett University of Sheffield.
MICE MICE Target Status P J Smith CM 25 Wed 4 th November 2009.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
MICE Target Electronics & DAQ Update P J Smith University of Sheffield 2 nd December 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
TARGET WORKSHOP – SHEFFIELD HALLAM UNIVERSITY Monday 2 March 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Target alignment with ISIS beam centre.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
CSC 160 Computer Programming for Non-Majors Lecture #7: Variables Revisited Prof. Adam M. Wittenstein
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
(FEA) Analysis P J Smith University of Sheffield 27 th November 2008.
Problem solving in project management
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Mercury Laser Driver Reliability Considerations HAPL Integration Group Earl Ault June 20, 2005 UCRL-POST
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
Year 13 Tutor Training – Reports Reports for Y13 are issued on 11 th February. This training is about your role in helping to ensure that the process is.
CCDs in space: the effects of radiation on Hubble’s Advanced Camera for Surveys (ACS) Max Mutchler, David Golimowski (Space Telescope Science Institute),
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Toby Shoobridge David Benham NERC Space Geodesy Facility Herstmonceux, UK
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
MICE Target Development Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
MICE Target Failure UKNFIC Meeting Adam Dobbs - when and why 4 th July 2008.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
P. J. Smith on behalf of the MICE target team.
Laser Monitoring System On behalf of the Caltech group
MICE CM31 Schedule summary
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Preliminary analysis of PS septum 31 failure August 8th, 2008
Banafsheh Hajinasab Based on presentation by K. Strnisa, Cosylab
Presentation transcript:

MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team

MICE Overview 10/02/2014 Target Mechanism 2 Running on ISIS: Running on ISIS: A summary of running on ISIS. Future Run Plans. Software Updates. Replacement of patch/broken fibres. The Requirement for new fibre runs. Target in R78: Target in R78: The ‘S’ series Runs New Stator Build Conclusions Photos. Stator Inventory. Conclusions

MICE Running on ISIS 10/02/2014 Target Mechanism 3

MICE Summary of Running 10/02/2014 Target Mechanism 4 The last presentation that I believe the target team gave to the collaboration was in June 2012 –Glasgow. I’m not going to give details of every time the target has been run since that date but here are some highlights: The principle runs that I could ascertain from the MICE log are: Autumn ’12 Quite a bit of running on and off. Feb ‘13 Target Activation Run – 4V beamloss. Aug ‘13 PID/TOF Calibration. Oct ‘13 EMR Run. Plus many minor runs for equipment testing/shifter training and to test the target after system changes had been made. And we were due to run: Dec ’13/Jan 14 - Double Dip Rate Running WITH BEAM but this has yet to happen.

MICE Summary of Running 10/02/2014 Target Mechanism 5 Double Actuation Rate. We had a request to run the target at double rate - nominally on ISIS it has been operated at 128/50 seconds. In principle this is not a problem as the target was designed to run at 50/64 Hz (0.78 Hz). The R78 target has always been operated at 0.83Hz at a full shaft displacement of about 48mm. Typically when on ISIS the shaft goes through a displacement of about ~30mm. We have demonstrated that the ISIS target will run at double rate with the frame raised for an extended period of time on several occasions over the last couple of months. We now need to demonstrate this with beam. Running at a higher rate reduces the acceleration so both the target’s timing and the beam bump may require altering slightly to give optimum target performance. The last couple of attempts have been thwarted by technical issues. The next opportunity could be at the end of the User Run – early April?

MICE Summary of Running 10/02/2014 Target Mechanism 6 We are running T2.9 (DLC/Vespel) on ISIS - installed 13 th Sept 2011, and by June 2012 this had completed ~240k pulses. We are still running the same target and this has now completed 520k pulses. This target/bearing combination should have a lifespan of ~1m actuations. (Dependent upon no serious deterioration in target DAQ data.) This change to a double band structure is typical during wear T2.8 - In R78 ran for 1m (500k shown) The start position is one indicative measure of wear. We like to see the full width <1.5mm.

MICE Future Run Plans 10/02/2014 Target Mechanism 7 The question is: How much running of the target do we envisage taking place over the next few months? The answer to this question this will shape what we determine to do with the target on ISIS in the near future – keep or replace? Double dip rate test and beam-bump adjustment (4 2.8k/hr) = 11k actuations Activation Study (8 2.8k/hr) = 23k actuations Monthly Testing – 4 hrs/year = 13k actuations What else?

MICE Software Updates 10/02/2014 Target Mechanism 8 A section of the code for the GUI software has been updated so that the screen now refreshes more frequently. This should prove useful with double actuation rate running. We are monitoring the situation with respect to the performance of the target GUI (aka your feedback!)

MICE 10/02/2014 Target Mechanism 9 The optical cables that run between the controller and the target were installed late early 2008 – so they have been in for 5-6 years. The cables did not follow the prescribed route and consequently there was a significant excess of cable that was left stored underneath the dipole just behind the target. Patch cables were deliberately added to the end of the route as those lengths of cable were perceived to be at higher risk from both radiation and mechanical damage. (1→2) Excess fibres stored underneath the dipole behind the target. This is not what it was planned to look like! Optical Fibres 2 1

MICE 10/02/2014 Target Mechanism 10 During 2013 was the first time that we noted a gradual but significant degradation in the amplitude of the return signals from the optical fibres. This was closely monitored during running and the electronics gain adjusted prior to each shift. It was clear that this issue needed resolving as we were running out of headroom on the amplifier gains. As a consequence of the signal drop off we replaced the patch fibres between the optics block and the main fibres during November One of the fibres needed to be replaced a month later due to mechanical damage. Semi -regular replacement of these fibres was envisaged when the target was installed – hence the location of the patch panels, so this has worked well. But it raises the question over whether any damage is being done to the excess of fibre that is currently being stored underneath the ISIS beamline. Some indication of higher activation in SP7 area but data on this is intermittent. Optic Fibre Patch Cable Replacement

MICE 10/02/2014 Target Mechanism 11 Before we did the replacement: Values – Laser Power A = 48, mW Laser Power B = 43, mW Laser Power I = 48,319 – 1.00mW We replaced the fibre and did not change the controller gain, but adjusted the lasers to get close to the previous values. Laser Power A = 47, mW Laser Power B = 43, mW Laser Power I = 47, mW So an estimate of the % improvement in light yield: A = 227%, B=200%, I = 370% Optic Fibre Patch Cable Replacement

MICE 10/02/2014 Target Mechanism 12 Optic Fibre Patch Cable Replacement Loopback Test results: Still Running. Loopback is at the end of the long fibre runs and does not include patch cables at synch end. The cause in the drop of the signal over time is unclear. Not necessarily rad damage but justifies the need to monitor signals. 0 = ISIS Off + MICE Off 2 = ISIS running 3 = ISIS + MICE running

MICE 10/02/2014 Target Mechanism 13 Requirement for New Fibres: There are two concerns: 1)The excess of fibres at the end of the 07’ install are vulnerable and are at risk of damage – both mechanical and radiation. 2) We only have one known good spare channel for the target system. The target is a critical system for MICE and losing fibres to the target just before a run could mean a significant delay to the experiment. We feel that there is: 1)A critical case for re-installing the fibres as per the original plan – the plan deviated significantly in the synch. 2)That there should be twice as many fibres laid as are required to give a significant number of spare channels in case of accidental damage to the fibres. We need both funds and manpower to manage the re-install. Optic Fibre Cable Replacement

MICE Target in R78 10/02/2014 Target Mechanism 14

MICE Target in R78 - History 10/02/2014 Target Mechanism 15 S1.1, 25/9/2012 to 6/11/ M actuations. Things looked OK up to ~500K, after which the performance dropped of suddenly. We saw a rapid decrease in acceleration and a large increase in the number of capture corrections. Towards the end of the test we saw an increase in 10s gaps, presumably caused by sticking during capture corrections. Therefore we increased hold current. S1.1r2, 14/11/2012 to 17/11/ k. We saw that loose magnets were possibly the cause and cleaned the mechanism. The acceleration rapidly decreased and the starting position returned to the width observed in the previous test (within around 8K of starting the test). We ran for a total of 80k, but there was significant sticking / friction which caused a very large number of gaps > 10s and resulted in regular errors. S1.2, 05/12/2012 to 12/02/ M. First successful test. Saw good performance, saw steady broadening of starting position, and a sudden change to double banded acceleration, which was expected from the increase in start position. Everything was fairly stable right up to the end of the test. S1.3, 1/03/2013 to 28/03/ M, using 3 phase 77V. Again saw good performance throughout test. Acceleration was around 850m/s/s and starting position width was fairly steady at just over 1mm.

MICE The S1.4 ‘Mega’-Run 10/02/2014 Target Mechanism 16 Starting position for the target remained consistent throughout the run. Acceleration broadens slightly but it looks consistent. (Perhaps it even improves with age like a good wine!) S1.4 ran from April 2013 to Dec There were a couple of stops for visual inspections, and a few shutdowns due to software updates, power outages etc. We would have happily continued running this target beyond 10m actuations but we needed to continue with other tests. The target was disassembled and inspected in Jan Ed experimenting with voltage/coil timings

MICE The S1.4 ‘Mega’-Run 10/02/2014 Target Mechanism million actuations. Very Clean. No migration of any dust below the mechanism. Important milestone and if repeatable has implications for operations. Most dust had adhered to shaft here

MICE S1.5 Run 10/02/2014 Target Mechanism 18 On the basis of the success with 1.4 we refurbished the target and set it running again in late Jan However, from the DAQ data it was clear that something is not quite right with this run. Stopped at 750K. We disassembled the target on 19/02/2014 to take a look but nothing obvious was found. The target was refitted with new bearings and is now running again. Too early to draw any conclusions. Spikey broad acceleration should not be observed in first 50k. Coupled with errors in FPGA DAQ output this requires attention.

MICE New Stator Build – S2 10/02/2014 Target Mechanism 19 Next Steps: Field Mapping -> Permanent Casing -> Potting.

MICE Stator Inventory 10/02/2014 Target Mechanism 20 1)T2.9 - ISIS - Maybe 500k pulses left at most before it requires swapping out. 2)S1 – R78 – This stator would be good for installation onto ISIS with a bearing swap. With another good run in R78 we would be in a strong position to negotiate a longer lifetime limit on ISIS with this stator. 3)T1 –Storage – Ready for installation on ISIS. Officially this has a 1m lifetime limit but this is a better stator than T2 and generally has a longer bearing lifetime. We may be able to negotiate a longer lifetime based upon DAQ data. 4)S2 – Under Construction. This needs field mapping, potting and then an extensive period of testing before we will be in a position to ascertain whether it is as good as S1. Longer term it may prove necessary to retire the T series, particularly if significant periods of running are required. In this case an S3 may be needed.

MICE Conclusions 10/02/2014 Target Mechanism 21 The target on ISIS is looking ok but we need to consider how much this particular target is going to be run over the forthcoming months to determine our course of action with it. Operating the target at double actuation rate without beam has been successful. We now need to prove that it can operate at this rate with beam and make any necessary changes to the beam bump. Our first ‘S’ series stator has successfully completed an extremely long run in R78 and we feel that it would be suitable for using on ISIS if necessary, but ideally we would like to do some more tests in R78 first. We are particularly concerned about the situation with the fibre optic cables in the sync. We feel that it is only a matter of time before these become damaged and leave the target un-operational. Clearly this is a critical item and needs to be addressed but we are lacking the resources to deal with it quickly.