PHENIX WEEKLY PLANNING 4/20/06 Don Lynch. Safety We have lost a whole week of running because of a violation of procedure and not because of the accident.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
Advertisements

PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
PHENIX WEEKLY PLANNING 11/30/06 Don Lynch. 11/16/06 Weekly Planning Meeting 2 PHENIX END OF SHUTDOWN PARTY Celebrating the successful installation of.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX PLANNING Technical Support Plan for 2006 Don Lynch (updated 3/24/06)
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
PHENIX WEEKLY PLANNING 10/12/06 Don Lynch. 10/12/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
Preparations for Run 6 Don Lynch February 13, 2006.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

PHENIX WEEKLY PLANNING 4/20/06 Don Lynch

Safety We have lost a whole week of running because of a violation of procedure and not because of the accident itself. Make sure you wear your protective equipment

This Week Removed BLM test Installed HBD prototype

HBD Prototype Installation low position

Purpose Improve planning for prototype move to run position Improve planning for final detector installation Improve planning for other detector upgrades General Observations Prototype installation – last minute changes are inevitable Mid run installation – time and space constraints are more critical Tech Staff and Detector crew worked well together accomplished task as planned despite difficult nature Specific Observations UV lamp required mounting, electrical, magnetic and gas provisions not specifically planned for Use of multiple vendor fittings on prototype Number of persons in small area HBD Prototype Installation After Action Discussion

Prior to installation –Checklist (to be filled out by detector group & staff) Cables: type, number, length, connectors, ratings, bend radii Gas: type, lines, connections, special requirements Dimensional outline including, mounting, protective cover(s), electronics and other appendages Special handling requirements including orientation, internal atmosphere, cg Radiological Magnetic Test equipment and support for test equipment Installation tools and fixtures During installation Oversight Change requests Out of scope changes Planning Improvements

BLM Damaged strip pixel sample What’s Next?

Next Week Continue prep for HBD prototype move to run position HBD prototype check out tests New detector work (TOF West handling fixtures, HBD support structure, RXNP design, MPC North design)

HBD Prototype Run Position Mounting Prototype can not use final design mounting due to differences in location of connectors and other basic design differences. Prototype mounting to be fabricated from fg unistrut. Design of full detector details nearly complete and ready for fabrication. 3D model received from WI

HBD Prototype

HBD Cable Management Scheme (1 st take) Flexible panduit cable trays mounted to rigid fiberglas unistrut backbone provide support and strain relief for 156 cable bundles ( 6 north and 6 south for each of 6 facets on each ½ detector. 3” x 3” panduit for signal cables 2” x 2” panduit for HV cables

HBD Cable Management Scheme (Take 2) Cable Trays moved out of acceptance

HBD Cable Management Scheme (Take 2) Signal/LV Cables 12 cables are illustrated out of 156 total PMT’s, Cables and Fibers for RXNP are not shown

HBD Cable Management Scheme (Take 3) Moved some support out of acceptance. Still needs work

Next Access Day Expect next access day (8 hrs) to be ??? May be shorter controlled accesses before then Subsystems must arrange for tech assistance prior to access day or don’t expect assistance. (see Don Lynch or John Haggerty) PHENIX Techs only on CM lift platform unless accompanied by PHENIX Tech (Lift platform is locked and will remain locked even after BLM stand is removed) Planned: More MPC electronics work? HBD system tests Reinstall partial BLM HBD Prototype moves to run position

Other Projects TOF West Expect detectors to be at BNL by June 1. MPC North Design discussed this week. Drawings being collected. Muon RPC Moving toward CDR in summer ‘06 Beampipe design Conceptual design needs tweaking. New spec control drawing needed. New CM Crane Nothing new Engineering Documentation Documentation/Drawings data base with web based retrieval 3D model at detector outline level with utility envelopes utility schematics

Reaction Plane Detector (RXNP) Lead converter Outer spacer (6 per quad) Outer scintilator (3 per quad) Inner scintilator (3 per quad) Inner spacer (3 per quad) Tray 4 quads per assy North and South assy’s

Base Plate 3/8 alum 2 per assembly. Mounts to existing ¼-20 holes on Brass nosecone. Quads are then mounted to Base Plate

RXNP DETECTOR North and south detectors each with 4 arms to PMT’s (6 on each arm at 111 cm radius) Arms now have jog to accommodate HBD

New Beampipe for Upgrades CA Coordination meeting findings: 1. Min radial clearance for VTX = 25 mm 2. Min Be ID = 40 mm 3. Be wall = 0.5 mm (4.4 mm min clearance) 4. Be ID to be neg coated at BNL 5. Be OD to be epoxy coated by Vendor 6. Requires supports at both bellows 7. Stress analyses needed (axial stress, vacuum breach shock stress and thermo- mechanical stresses during bakeout 8. RF analysis of bellows needed (shields?)

CM Region Crane & Cable Routing Concept Cable Trays to route cables NCC Detector from Bridge CM Crane north-south & east-west motions; extended travel east to existing crane coverage Crane Supports use existing flux return notches

C-A Tasks Current Tasks General run support New storage trailer (as promised) Fix roof leaks Tasks for Shutdown 2006 Install access platforms from EC top north and MMS Replace emergency fan louvres Rewire/add IR ceiling lights on emergency power Replace WC sliding platform hoisting cables Mixing house exhaust fan maintenance

MOLD Problems

Shutdown 2006 June ’06: end run 5, prep for start of shutdown, prep EC for move to AH July ’06: TOF West installation, RXNP installation Aug. ’06: MPC North installation, HBD installation Sep. ’06: Detector subsystems maintenance, roll EC in, prep for run 6 Oct. ’06: Plan to start cooldown on Oct. 15 th Subsystems: Get requests for maintenance in early to get on theschedule Links for weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found from the web site: