Anhnhat Tran & Nam Nguyen Comp 589 Spring 2009 CSUN Outsourcing Metrics.

Slides:



Advertisements
Similar presentations
Chapter 13: Organizational Innovation and Change
Advertisements

Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
Software Product Testing Challenges. Industry Analysts Recognize Testing Outsourcing is gaining momentum and delivers value Multiple business drivers.
Chapter 5 Buying business services. Program The increasing importance of services Differences between goods and services A classification of services.
Supply Chain Management
Mergers & Acquisitions The real success factor = 1,5 or 2,5? 1.
Hillyard – Vektr CQI ™ Continuous Quality Improvement Hillyard Inc. has partnered with Nuvek LLC, to gain hosting capabilities for a new and innovative.
Preparing Your Business Plan
Software Development Process Models. The Waterfall Development Model.
Human Resource Champions: The Next Agenda for Adding Value and Delivering Results Presented by Ivan Chang.
Managing the Information Technology Resource Jerry N. Luftman
IT Outsourcing Management
Unit Five – Transforming Organizations
The Analyst as a Project Manager
Center for Health Care Quality Licensing & Certification Program Evaluation 1 August 2014 rev.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Implementing a Quality Management System
Recruiting Metrics for Improved Performance Presented By Tom Darrow September 11, 2008 NC SHRM State Conference Copyright 2008 Talent Connections. All.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Introduction to: Hyperion Strategic Finance and Strategic Finance Consulting SCOOP Session September 30, 2004.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
Accounts management software simplifies the process of accounting for any individual or for an organization. 3 Star Info takes utmost effort so that beyond.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
StaffingForce ™ Full Service Human Capital Solutions © 2007 StaffingForce
Topics → Business strategy must set goals → Partners selection → Criteria for selecting partners → Structure must maximize cooperation → Incentives for.
Roles and Responsibilities
1.  Project: temporary endeavor to achieve some specific objectives in a defined time  Project management ◦ Dynamic process ◦ Controlled and structured.
Chapter Eight “Strategic Alliances”
Director of Evaluation and Accountability Manager, UW’s Grand Rapids, Michigan Robert McKown, CIRS Director of Evaluation and Accountability Sherri.
Copyright 2005 Talent Connections. All Rights Reserved. Presented By Tom Darrow Recruiting Methods for Improved Performance.
© 2008 IBM Corporation Challenges for Infrastructure Outsourcing July 29, 2011 Atul Gupta Vice President, Strategic Outsourcing, IBM.
Presented By Tom Darrow October 3, 2001 Recruiting Methods for Improved Performance.
Outsourcing Best Practices SIM – Philadelphia April 1, 2003 Presented by: Michael Speaker President, MSC Services, Inc.
Introduction to Management LECTURE 17: Introduction to Management MGT
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Supply Chain Doctors SCM Fundamentals Introduction Planning Sourcing Making Warehousing Transporting Sharpening the Saw.
Chapter 13 Information Technology Economics. Agenda IT Organization IT Productivity IT Benefits Data Center Economics.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Business Functions, Processes, and Data Requirements
Chapter 20 Strategy in Purchasing and Supply Management.
Orientation Workshop on Product Development & Management Functions Workshop 1: Introduction to the Orientation Workshops March 29, 2007 The DSA Project.
Project Portfolio Management Business Priorities Presentation.
Human Resource Staffing and Performance Management Introduction
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
OUTSOURCING PLANNING. Group Members Sumeet Rao 39 Aastha Salaskar 59 Krunal Madia 58 Dhanashree Kalamkar 18 Ritesh Karunakar 19.
Unit 8.2: Effective Implementation Planning HIT Implementation Planning for Quality and Safety Component 12/Unit 81 Health IT Workforce Curriculum Version.
Chapter 11: Alternative Approach - Purchasing Systems.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
Thepul Ginige Lecture-7 Implementation of Information System Thepul Ginige.
1 ECC/FMI Survey Results September 3, 2007 Research and Analysis by:
STRATEGY IMPLEMENTATION Chapter 7. FUNCTIONAL STRATEGIES These are made up of day to day decisions made at the operating level of the firm, often performed.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
Talent Acquisition, Staffing, Recruitment, Executive Search.
INTRODUCTION TO SUPPLY CHAIN MANAGEMENT. What is a Supply Chain? A supply chain consists of the flow of products and services from: Raw materials manufacturers.
Roles and Responsibilities
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Systems Analysis and Design in a Changing World, 4th Edition
Strategy implementation
Human Resource Champions: The Next Agenda for Adding Value and Delivering Results Presented by Ivan Chang.
Fix it or Forget it? Dealing with Troubled Projects
By Jeff Burklo, Director
10 Ways to Outsource Business Processes Effectively outsource-business-processes-effectively/
Sourcing Issues in outsourcing..
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Project.
Presentation transcript:

Anhnhat Tran & Nam Nguyen Comp 589 Spring 2009 CSUN Outsourcing Metrics

Outsourcing Benefits According to the latest Global IT Outsourcing Study from DiamondCluster for the year 2006:

Current Outsourcing Trends

Current Outsourcing Trends (cont.)

Why ? Companies are reducing outsourcing for three primary reasons: Mistakenly outsourced a process or function that is core to their business and are now bringing those back in-house. Their provider over-promised and under-delivered. The complexity of managing and measuring outsourcing projects and relationships overshadowed the benefits.

Cost Metrics Financial costs. Hard costs associated with activities that must be undertaken to assess, launch, and maintain a Business Process Outsource (BPO) project. Strategic costs: loss of organizational learning in the outsourced activity.

Analysis Phase Cost internal staff that will be enlisted to conduct the assessment third-party professional support: BPO consultants, market research specialists, and change-management consultants fear-induced performance declines

Implementation Phase Cost hire a third-party intermediary, or time spent in crafting an Request For Proposals, distributing it to vendors, managing and responding to queries, and evaluating proposals (meetings with the leadership teams of the top two or three candidates, including site visits to their facilities) work with an legal team when developing the contract

Transition Phase Cost Depth of relationship: costs associated with developing and maintaining a strategic relationship with the vendor Breadth of the relationship: range of processes that are outsourced. Working with a single provider for multiple processes may reduce costs as familiarity and trust increase, but the potential costs associated with vendor failure increase as dependence on the vendor increases. third parties: to assist in the integration of both the vendor’s and the initiating organization’s systems process adaptation: Employees may experience a period of adjustment as the process is transitioned and they need to interface with new people and unfamiliar systems

Operational Phase Cost Impact on Productivity: Most BPO initiatives result in some job displacement or layoffs. Remaining employees will be concerned about whether their unit is a future BPO: drop-off in productivity. Productivity measures: Output per employee, Overhead cost per unit of output, Output per capital expenditure, Output per asset Customer satisfaction levels during BPO implementation. Variations beyond the norm must be carefully analyzed Competition: Competitors will respond to new moves. Reactions of shareholders and other major organizational stakeholders: extensive reengineering or restructuring that includes a technology component may meet with anxiety and doubt

TCM applied to Outsource Project’s Phases

Provider Risk Metrics Provider’s financial stability Provider’s track record for quality, on-time delivery, and service Maturity level of the provider’s processes Maturity of the provider’s service or product Clarity and effectiveness of communication with the provider

Provider’s financial stability Dun & Bradstreet rating/report Cash Flow and Banking Relationships Accounting Systems Net worth of the business Accounts Receivable/Payable Status

Provider’s History Customer references Product or service performance metrics : field fault history, percent on-time delivery, average response time for customer calls.

Maturity level of the provider’s processes Proof of certifications to industry standards such as TQM, ISO 9001 and SEI CMMi Management experience Technical capability Quality assurance program

Service/Product Maturity length of time the provider has been providing the service to similar projects total number of production months for the product customer defect reporting history on the product expected product life

Communication Time zone differences: Overtime cost Culture differences. Approach and management style fits our strategy & culture ? Travel cost Onsite present cost

Integration Risk Metrics Level of customization—How much new development specifically done for our project is needed? Level of integration/dependence—How tightly coupled is the provider’s work to ours?

Risk Levels

Current System Metrics Capture specifications on workload Average size of each transaction (consider both inputs and outputs) Largest historical size of a transaction, and largest forecast future size of a transaction Largest historical number of transactions at peak times Largest forecast number of transactions at peak times Total current storage capacity requirements for data Total forecast storage capacity requirements for future data Peak utilization of the central processing unit at particular times during the 24-hour day

Performance Metrics

Progress Are all schedule commitments on track to be met? percent of effort completed percent of modules completed and/or inspected, and unit or multiunit testing progress (percent test cases executed and passed).

Quality Are quality targets going to be met? Have they been met? technical performance measures: transaction throughput or user response time number of open defects mean time to failure level of fault on fix.

Responsiveness Are delivery of on-demand services and fixes to problems being handled in accordance with your project’s needs? Time (average, maximum) to restoration (getting us moving forward even if it is with a temporary work around) Time to permanent fix delivery.

References Laird, Linda M., Software Measurement and Estimation A Practical Approach Schniederjans, Marc, Outsourcing management information systems Duening,Thomas N., Essentials of business process outsourcing DiamondCluster International, “2006 Global IT Outsourcing Study.” Available from

Thank You Please ask us questions for the parts that you are unclear or confused.