Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006.

Slides:



Advertisements
Similar presentations
Ex. 22 – Forced Landing Ex Forced Landing.
Advertisements

GOLF COURSE HOSPITAL AGRICULTURE WILDLIFE HABITAT WETLANDS OPEN SPACE SCHOOL RECREATION HOUSING DEVELOPMENT WHAT DO ALL THESE PLACES HAVE IN COMMON?
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: January 2013.
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Landscape Design Standard 4.01
Sustainable Landscapes Using Waste Sustainably Michael D. Pavelek II Greater Lebanon Refuse Authority.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
Reduce Unnecessary Disturbance Part 3 U.S. Department of the Interior Bureau of Land Management November 2006.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
U.S. Department of the Interior Bureau of Land Management Wildlife Management November 2006.
Techniques To Make Your Movies Professional & Compelling.
Agency Staff report on the Creation of a: (Andy Lanier – DLCD, Laurel Hillmann – OPRD)
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
What is a Civil Engineer?
Goodsprings Field Office October 30 th  250 “Small” (250ft tall) wind towers  Total height including blades approx. 350ft  Associated Facilities.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
Monte Alban in southern Mexico What are some of the advantages of aerial archaeology? What are some of the platforms that have been used for aerial archaeology?
Every Face Tells A Story. WHAT IS A PORTRAIT? A portrait is defined as a likeness of a person, especially of the person’s face A photographic portrait.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management May 2006.
Composition (The elements). What is Composition Composition is the arrangement of shapes (forms) in an image – their position, relationship to one another.
PRINCIPLES OF DESIGN PHOTOGRAPHY. BALANCE Visual center is above geometric center. Visual weight is determined by many variables Size Darkness – A strong.
I n t e g r a t I n g C S S Practitioner Module 6 1 Module 6: CSS and Livability in Construction, and Maintenance.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
Visual Resource Management May 2015 Lander, Wyoming.
Production Operations U.S. Department of the Interior Bureau of Land Management November 2006.
Table Mountain Wind Proposal Jean Field Office. Project Information Proponent: Table Mountain Wind Co., LLC Project Specifics: ROW grant to use BLM administered.
Unit 15B Class Project Class Project. Objective Using the tools, techniques, and practices covered so far, work in an ID team setting to evaluate a project.
Environmental Issues Associated with Oil and Natural Gas Extraction, Transport and Processing in the Marcellus and Utica Shale Region of Ohio Joe Bonnell,
Visual Resource Management May 2015 Lander, Wyoming.
Guided Notes on the Human Impact on Land Resources
Best Management Practice Information Sheets Updated: August 30, 2004 Contact: U.S. Department of the Interior Bureau.
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
ENVIRONMENTAL RESOURCES HAMPTON BAYS 2011 GEIS FINAL DRAFT Mary Jean Green HBCA Board Member.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Course Wrap Up UNIT 16. Overall Course Objective Having participated in the course, you should be able to: Describe the basic principles and concepts.
1 Project Analysis and Evaluation UNIT 10 – Project Analysis and Evaluation.
By Leor & Gabriel Davoodpour Definition: Removing a mineral deposit from the Earth after removing the layer of earth above it. Techniques: Area Mining.
Impacts of Mining, Mining Regulations & Mine Reclamation.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
BOARD OF OIL, GAS, AND MINING DEPARTMENT OF NATURAL RESOURCES STATE OF UTAH BEFORE THE BOARD: RECLAMATION OF SURFACE DISTURBANCE DIVERSIFIED STONE PRODUCTS.
Introduction Part 1 U.S. Department of the Interior Bureau of Land Management May 2006.
Photography Composition Basics. The Rule of Thirds.
Tortilla Flats Substation and Power Line September 28, 2007.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: April 2009.
Photo Composition Mrs. Stiles. Rule of Thirds 0 This is the first rule of photography that is taught and it is something that should be always be kept.
Aerial Photography for Archaeology
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
Cerrillos Hills Cell Tower Team Three: Sabrina Flores, Angela Wetz, Jane Sanderford, Bridget Clayton, Brenda Warner, and Jon Jasper Field Manager: Steve.
Train Body The next series of slides will guide you through the construction of the train body. Start a new drawing and save it as Train Body.
Constructive and Deconstructive Processes that shape the Earth.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
FREP Visual Sample DNI-019 Sample date Nov 10, 2010.
Project Profile: Four-Star NGBS Certified Development Developed by Rocket Properties, LLC 778 acre infill site, 428 acres preserved 604 home sites in 8.
How Did They Do That? Some secrets you can use to fool the eye. Lessons by Mary Erickson, Ph.D. with art teacher Hillary Andrelchik Masters of Illusion:
Jefferson County SA Red Rocks Site Approval
WHAT DO ALL THESE PLACES
Range Management in the Face of Climate Change
An Alternative to Skyline Blight
2018 Excellence in reclamation award
Marcellus Well Pad Constructability
Site Design •Project Site context Module 3: •Site Analysis
Latin America and Caribbean Region
Physical Space - LANDSCAPES
WHAT DO ALL THESE PLACES
Presentation transcript:

Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006

VRM BMP Principles The VRM system provides us with many basic principles and techniques to help reduce contrast. As they relate to Fluid Minerals and similar development, the 4 most critical are: 1.Proper Site Selection (This Slideshow) 2.Reduce Unnecessary Disturbance (Part 3) 3.Choice of Color (Part 4) 4.Final Reclamation (Part 5)

PROPER SITE SELECTION Location! Location! Location! -Proper site selection can be the most important tool for reducing visual contrast. -Work with the operator to choose the best site access and facility location to mitigate for visual impacts. -Where practical, avoid construction in highly scenic areas. Would you want to see a pumping unit and tall tanks at this ridgetop location, or could they, or at least the tanks, be moved off the ridgeline where they would be less visible?

Avoid placing facilities on ridgetops Ridgetop facilities are highly visible from great distances because they are skylined. Roads, on the other hand, may be less visible if located along ridgetops, but if they are located on the ridge face they can be highly visible because of increased cut, fill and sidecast material. The color of this tank and its ridgeline position make it visible from great distances.

Distance Move facilities further from key observation points to reduce their apparent size. This may necessitate moving facilities from the shoulder of roads and trails, and placing them in the background of the view. Try locating the “Juniper Green” Pump-jack in this photograph.

Avoid locating facilities near “prominent” features. A prominent feature may be something with a specific name or that serves as a landmark. Can you think of any prominent features or landmarks in your area that should be avoided? Turtle Rock

Screening & Hiding Use natural or artificial features such as topography, vegetation, or an artificial berm to help screen facilities. Locate facilities in a swale, around the bend, behind a ridge, or create a natural looking, vegetated berm. Photo of a dark green pumping unit partially screened by junipers

Consider Cumulative Effects One or two properly mitigated wells along a scenic byway may not be incompatible with a Land Use Plan VRM Classification, such as VRM Class II. But what if there were 5, 10 or 15 wells? Effective visual mitigation becomes more critical with additive impacts. The addition of new wells to a highly developed area may not have a noticeable cumulative effect, but could have an effect in a less developed, more natural area.

Plan the Road System Work with the operator to plan the road system for a new or expanding field. Planned road systems result in less surface disturbance and save in construction and maintenance costs. Consider a Plan of Development. Roads developed one at a time without a grand design waste space and resources, destroy vegetation, contribute to soil erosion, and fragment habitat. Photo Simulation Unnecessary shortcut roads.

Follow the Contour Locate and construct roads and other linear facilities to follow the contour of the landform or mimic lines in the vegetation. Avoid a straight road that will draw the viewer’s eye and attention straight toward the production facilities at the end of the road. This road winds along the natural contour of the land minimizing the need for cut and fill and not drawing your attention to the well facilities at the end of the road.

Roads: Avoid Straight Lines In Visually Sensitive Areas Follow the contours Put a bend in the road where it joins a main road so as you drive by, your eye does not catch sight of a long, straight road.

Where Practical, Use Existing Roads. When a Suitable Existing Road is Not Available… Construct a Suitable Road, but Eliminate the Redundant or Obsolete Roads Consider…..Is the Existing Road in the best location? Do not reuse existing roads just because they are preexisting and you are hesitant to disturb new areas. Choose the best location for the road and its anticipated uses. Consider safety, anticipated traffic load, and maintenance requirements as well as visual and habitat needs. This new road was constructed in a better location, but without reclaiming the former, obsolete road. To mitigate the construction of the new road, the obsolete road should be recontoured to the original contour and revegetated.  New Road  Obsolete Roads 

BOTTOM LINE: To minimize adverse impacts, work with affected parties to ensure proper siting prior to the submission and approval of the permit application. This can create a win-win-win for the operator, the public, and BLM. Well drilled in a swale. Production facilities will be partially out of view from key observation points. (However, first ensure that the swale is not important wildlife habitat.) Continue on with VRM Part 3